Post Implementation Review is a process of evaluating the success of a project after its completion.
It is conducted after the project has been implemented to evaluate its success
It involves reviewing the project's objectives, outcomes, and performance
It identifies areas of improvement for future projects
It helps in identifying lessons learned and best practices
It involves gathering feedback from stakeholders and team m...
Change life cycle is a process of managing changes in an organization from initiation to closure.
It involves planning, implementing, and monitoring changes
It includes identifying the need for change, assessing the impact, and communicating the change to stakeholders
It also involves training employees, testing the change, and making adjustments as necessary
The final stage is closure, where the change is evaluated and le...
Urgent changes require immediate attention, while emergency changes are critical and require immediate action.
Urgent changes are important but not critical, and can be scheduled within a reasonable timeframe.
Emergency changes are critical and require immediate action to prevent major incidents or outages.
Urgent changes may include software updates or minor configuration changes.
Emergency changes may include security pa...
Yes, I have experience with Service Mapping.
I have used ServiceNow's Service Mapping tool to map out dependencies and relationships between IT services.
I have also worked with other service mapping tools such as BMC Discovery and Dynatrace.
Through service mapping, I have been able to identify potential areas of improvement and streamline processes.
I have also used service mapping to create visual representations of IT ...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
posted on 6 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
posted on 13 Mar 2024
I applied via LinkedIn and was interviewed before Mar 2023. There were 2 interview rounds.
The planning process involves setting goals, identifying resources, creating a timeline, and evaluating progress.
Setting clear and achievable goals
Identifying resources needed
Creating a timeline for tasks and deadlines
Evaluating progress and making adjustments as needed
posted on 5 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
I appeared for an interview before Aug 2022.
All technical questions and taken interview 45 minutes i am fail to answer 3 from 50 but my performance good. 10 giants take interview.after all interview complited one list on notice board select 3 from 200 candidaye at L&T office andheri bombay.
I seek responsibilities that foster team growth, enhance operational efficiency, and drive strategic initiatives for organizational success.
Lead and mentor a team to improve performance and morale, as I did in my previous role by implementing weekly feedback sessions.
Oversee project management to ensure timely delivery, similar to how I coordinated a cross-departmental project that increased productivity by 20%.
Develop...
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
I applied via Job Portal
Maintenance schedule is a plan for regular upkeep of equipment or facilities to ensure their optimal performance.
Maintenance schedule includes regular inspections, cleaning, lubrication, and replacement of parts as needed.
It helps prevent breakdowns, prolongs equipment life, and reduces repair costs.
Examples of maintenance schedules include daily, weekly, monthly, and annual checklists.
Maintenance schedules should be t...
based on 1 interview experience
Difficulty level
Duration
Advanced Associate
148
salaries
| ₹4 L/yr - ₹9 L/yr |
Quality Engineer
81
salaries
| ₹2.8 L/yr - ₹6.2 L/yr |
Senior Associate
63
salaries
| ₹4 L/yr - ₹9.8 L/yr |
Design Engineer
54
salaries
| ₹3.5 L/yr - ₹14.5 L/yr |
Assistant Engineer
50
salaries
| ₹5.7 L/yr - ₹10 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM