Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Rajuri Steel Team. If you also belong to the team, you can get access from here

Rajuri Steel Verified Tick

Compare button icon Compare button icon Compare
4.3

based on 42 Reviews

Filter interviews by

Rajuri Steel Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 5 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Store work details
  • Q2. Store inventory
Round 2 - One-on-one 

(2 Questions)

  • Q1. Job change reason
  • Ans. 

    Seeking new challenges and opportunities for growth

    • Desire to expand skill set and knowledge in a new environment

    • Opportunity for career advancement and professional development

    • Seeking a more challenging and rewarding role

    • Interest in exploring different aspects of the industry

  • Answered by AI
  • Q2. Self growth
Round 3 - One-on-one 

(2 Questions)

  • Q1. Site job work ready
  • Q2. Guest house facility
Round 4 - One-on-one 

(2 Questions)

  • Q1. Ready work 10 hours
  • Q2. Good waking in hitech
Round 5 - One-on-one 

(2 Questions)

  • Q1. Working system is good
  • Q2. Job time is good

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job in hitech in all site
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. How to grow up to other company
  • Ans. 

    To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.

    • Network with professionals in your industry to learn about job opportunities

    • Attend industry events, conferences, and workshops to expand your knowledge and skills

    • Update your resume with your latest projects, achievements, and certifications

    • Practice for interviews by research...

  • Answered by AI
  • Q2. How will do interview with another company
  • Q3. I want to know everything is new company
  • Q4. I want to know new company wor management and had office staff
  • Q5. I want know my new company work location

Interview Preparation Tips

Interview preparation tips for other job seekers - Time management it very important with manpower and machine
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-

I applied via campus placement at Hooghly Engineering & Technology College, Hoogly and was interviewed in Nov 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

All basic quantitative aptitude.

Round 2 - Group Discussion 

Topic was "Automation creating or destroing jobs."

Round 3 - Technical 

(2 Questions)

  • Q1. Shear stress, Theory of failures, FOS, How Fusion word is related to mechanical engineering, Why we use thermodynamics,
  • Q2. Allowing elements compositions of steel and there properties,Welding technology basic data based question,
Round 4 - HR 

(1 Question)

  • Q1. Why this company over other.(this will be a bit tricky 🤔 be honest and gather some knoledge about the company). What you prefer more job security or money.(be honest)- I told job security,further they a...
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Delhi College of Engineering (DCE), Delhi and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basis Electrical Questions like Relation between Voltage and current, Reactive Power, Series Parallel Connections etc
  • Q2. About Projects and Internships

Interview Preparation Tips

Topics to prepare for Tractebel Pget interview:
  • Electricals
  • Power Electronics
  • Basic
Interview preparation tips for other job seekers - Guys, stick to basics and try to give crisp answers
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Indeed and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Why are you applying for this job
  • Ans. 

    I am applying for this job because of my strong background in tendering and my passion for working in a challenging and dynamic environment.

    • I have a solid understanding of the tendering process and have successfully managed multiple tender projects in the past.

    • I am excited about the opportunity to work with a team of experienced professionals and contribute to the growth of the company.

    • I am confident that my skills and...

  • Answered by AI
  • Q2. Expected salary
  • Ans. 

    My expected salary is negotiable and dependent on the overall compensation package offered.

    • My expected salary is based on my experience, qualifications, and the responsibilities of the role.

    • I am open to discussing the salary range for this position during the interview process.

    • I am looking for a competitive salary that reflects the market rate for Tendering Engineers.

    • I am also interested in benefits such as healthcare,...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a dedicated and detail-oriented Tendering Engineer with a strong background in project management and cost estimation.

    • Experienced in preparing and submitting competitive bids for construction projects

    • Skilled in analyzing project requirements and developing cost-effective solutions

    • Proficient in using software tools for estimating and tendering processes

    • Strong communication and negotiation skills to liaise with clie

  • Answered by AI
  • Q2. What is tender ?
  • Ans. 

    A tender is a formal offer or proposal made by a company in response to an invitation to bid for a project or contract.

    • Tenders are used in the procurement process to select the best supplier or contractor for a project.

    • They typically include details such as pricing, timelines, and specifications.

    • Tenders are usually submitted in response to a Request for Proposal (RFP) or Invitation to Tender (ITT).

  • Answered by AI
  • Q3. Why tender department?
  • Ans. 

    Working in the tender department allows me to utilize my skills in project management, cost estimation, and negotiation to secure contracts for the company.

    • Opportunity to work on diverse projects and collaborate with various stakeholders

    • Utilize analytical skills to assess project requirements and develop competitive bids

    • Negotiate contracts with suppliers and subcontractors to ensure cost-effectiveness

    • Contribute to the ...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a dedicated and detail-oriented Tendering Engineer with a strong background in project management and cost estimation.

    • Experienced in preparing and submitting competitive bids for construction projects

    • Skilled in analyzing project requirements and developing cost-effective solutions

    • Proficient in using software tools for estimating and tendering processes

    • Strong communication skills to collaborate with clients, suppli

  • Answered by AI
  • Q2. Then again tell me about yourself until you re exhausted with or or or or
  • Ans. 

    I am a dedicated and experienced Tendering Engineer with a strong background in project management and cost estimation.

    • I have a Bachelor's degree in Engineering with a focus on tendering and procurement.

    • I have X years of experience working on various tendering projects in the construction industry.

    • I am proficient in cost estimation software such as Excel and specialized tendering tools.

    • I have a proven track record of s...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you re a fresher dont try to join this company there chiefs are very arrogant specially wasim (chief financial) is very rude to you and the only question he asked was tell me about yourself and after tell whole about myself he says or?
Then again i try to prolong my tell me about yourself then again he says or? Yaa bolna nhi aata sooo guys i have interviewed with them very recently and trust me you don’t wanna work with type of arrogant seniors one thing i liked about this company was hr department was very nice to me
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. What are the details regarding different types of shuttering materials?
  • Q2. What is inventory?
  • Q3. What is the process for receiving materials?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Multiple questions in the civil execution.
  • Q2. Process the construction work like :- shuttering, steel, concrete and finishing work.
  • Q3. Knowledge of BBS
  • Q4. Knowledge of mivan shuttering
  • Q5. Knowledge of water proofing work

Interview Preparation Tips

Topics to prepare for B.L. Kashyap & Sons Senior Manager interview:
  • Building Construction
Interview preparation tips for other job seekers - Fresh mind and hard working on site
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(8 Questions)

  • Q1. Can you tell me about yourself?
  • Ans. 

    I am a dedicated and experienced Project Control Engineer with a strong background in managing project schedules, budgets, and resources.

    • Over 5 years of experience in project control and management

    • Proficient in using project management software such as Primavera P6 and Microsoft Project

    • Skilled in analyzing project data and providing accurate forecasts

    • Strong communication and teamwork skills, able to collaborate with cr...

  • Answered by AI
  • Q2. What are the basics of Primavera?
  • Ans. 

    Primavera is a project management software used for planning, scheduling, and controlling projects.

    • Primavera is commonly used in industries such as construction, engineering, and manufacturing.

    • It allows users to create project schedules, allocate resources, track progress, and analyze project performance.

    • Users can generate reports, monitor costs, and manage risks within the software.

    • Primavera offers features like Gantt...

  • Answered by AI
  • Q3. What types of activities are there?
  • Q4. What are the different types of relationships?
  • Ans. 

    Different types of relationships include familial, romantic, professional, and platonic relationships.

    • Familial relationships: relationships between family members such as parents, siblings, and children.

    • Romantic relationships: intimate relationships between partners or spouses.

    • Professional relationships: relationships between colleagues or business partners.

    • Platonic relationships: non-romantic relationships based on fr

  • Answered by AI
  • Q5. How can you create a schedule?
  • Ans. 

    A schedule can be created by identifying project tasks, estimating durations, sequencing tasks, assigning resources, and setting milestones.

    • Identify all project tasks and break them down into smaller, manageable activities.

    • Estimate the duration of each task based on historical data or expert judgment.

    • Sequence the tasks in the order they need to be completed, considering dependencies between tasks.

    • Assign resources to ea...

  • Answered by AI
  • Q6. What is a look-ahead report?
  • Ans. 

    A look-ahead report is a document that outlines upcoming tasks, potential issues, and solutions for a project.

    • Provides a snapshot of upcoming project activities

    • Highlights potential roadblocks and proposed solutions

    • Helps project team anticipate and plan for future challenges

    • Usually covers a short-term period, such as the next week or month

  • Answered by AI
  • Q7. What are the steps to create a look-ahead report?
  • Ans. 

    Steps to create a look-ahead report

    • Identify the project milestones and deadlines

    • Review the project schedule and identify upcoming tasks

    • Analyze potential risks and delays

    • Update the look-ahead report with current progress and forecasted completion dates

    • Communicate the report to stakeholders for awareness and decision-making

  • Answered by AI
  • Q8. What are the 14 points of the DCMA (Defense Contract Management Agency)?
  • Ans. 

    The 14 points of the DCMA are guidelines for effective project management in defense contracts.

    • Establish clear project objectives and requirements

    • Develop a realistic project schedule

    • Assign responsibilities and authorities clearly

    • Ensure adequate resources are available

    • Maintain open communication with stakeholders

    • Identify and manage project risks

    • Monitor and control project performance

    • Implement corrective actions when nec...

  • Answered by AI
Round 2 - Technical 

(5 Questions)

  • Q1. What is earned value management?
  • Ans. 

    Earned value management is a project management technique for measuring project performance and progress.

    • Compares actual work completed and costs incurred to planned work and costs

    • Helps in forecasting project outcomes based on current performance

    • Key metrics include Planned Value (PV), Earned Value (EV), and Actual Cost (AC)

    • Formula: EV = % of work completed * Total budget

    • Example: If a project is 50% complete and the tot...

  • Answered by AI
  • Q2. What are the key performance indicators?
  • Ans. 

    Key performance indicators are measurable values that demonstrate how effectively a company is achieving key business objectives.

    • KPIs are specific, quantifiable metrics used to track progress towards organizational goals.

    • They help in evaluating the success of a project or business by measuring performance in key areas.

    • Examples of KPIs for a Project Control Engineer may include project completion time, budget variance,

  • Answered by AI
  • Q3. A project scenario was provided, and I was required to identify the key performance indicators.
  • Q4. What are the various formulas used to calculate the Budget at Completion (BAC)?
  • Ans. 

    Formulas used to calculate Budget at Completion (BAC) in project control engineering.

    • BAC = Planned Value (PV) at completion

    • BAC = Actual Cost (AC) + Estimate to Complete (ETC)

    • BAC = Budgeted Cost of Work Scheduled (BCWS) + Budgeted Cost of Work Remaining (BCWR)

  • Answered by AI
  • Q5. Where do you see yourself in five years?
  • Ans. 

    In five years, I see myself as a senior project control engineer leading a team of professionals and successfully managing complex projects.

    • Continuing to enhance my project management skills through advanced training and certifications

    • Taking on more responsibilities and leadership roles within the organization

    • Successfully completing several high-profile projects and delivering exceptional results

    • Mentoring and guiding j...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations for this position?
  • Ans. 

    My salary expectations are in line with industry standards for a Project Control Engineer with my level of experience and qualifications.

    • Research industry standards for Project Control Engineer salaries

    • Consider my level of experience and qualifications

    • Be prepared to negotiate based on the overall compensation package offered

  • Answered by AI
  • Q2. What are the working hours that are suitable for you?
  • Ans. 

    I am flexible with working hours and can adapt to the needs of the project. I am willing to work overtime when necessary.

    • I am open to working flexible hours to accommodate project needs

    • I am willing to work overtime when required to meet project deadlines

    • I can adjust my schedule to align with team meetings or client requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When determining salary expectations, focus solely on the in-hand salary and do not factor in the travel allowance.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Reverse the string
  • Ans. 

    Reverse a given string

    • Use a loop to iterate through the characters of the string

    • Append each character to a new string in reverse order

    • Return the reversed string

  • Answered by AI
  • Q2. Merge sort on infinite linklist
  • Ans. 

    Merge sort cannot be directly applied to an infinite linked list due to its divide and conquer nature.

    • Merge sort requires dividing the list into smaller sublists, which is not possible with an infinite linked list.

    • One approach is to break the infinite linked list into finite chunks, sort each chunk using merge sort, and then merge the sorted chunks.

    • Another approach is to use a different sorting algorithm that can handl...

  • Answered by AI
  • Q3. Operating systems
  • Q4. System designing
  • Q5. Object oriented programming

Skills evaluated in this interview

Rajuri Steel Interview FAQs

How to prepare for Rajuri Steel interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rajuri Steel. The most common topics and skills that interviewers at Rajuri Steel expect are 2D, 3D Modeling, Adobe Acrobat, CSS and Computer.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 816 Interviews
JSW Steel Interview Questions
3.9
 • 557 Interviews
Jindal Steel and Power Interview Questions
4.0
 • 292 Interviews
ArcelorMittal Nippon Steel Interview Questions
4.1
 • 209 Interviews
Bhushan Power & Steel Interview Questions
4.0
 • 48 Interviews
Vedanta Limited Interview Questions
3.8
 • 44 Interviews
Steel Authority Of India Interview Questions
4.1
 • 35 Interviews
ArcelorMittal Interview Questions
4.1
 • 29 Interviews
Vizag Steel Interview Questions
4.1
 • 26 Interviews
Monnet Group Interview Questions
4.3
 • 10 Interviews
View all

Rajuri Steel Reviews and Ratings

based on 42 reviews

4.3/5

Rating in categories

3.9

Skill development

4.2

Work-Life balance

3.9

Salary & Benefits

4.3

Job Security

4.0

Company culture

4.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 42 Reviews and Ratings
Marketing Executive
20 salaries
unlock blur

â‚ą2 L/yr - â‚ą3.8 L/yr

Area Sales Manager
6 salaries
unlock blur

â‚ą3.4 L/yr - â‚ą6.5 L/yr

Assistant Manager
5 salaries
unlock blur

â‚ą7 L/yr - â‚ą7.8 L/yr

Accountant
5 salaries
unlock blur

â‚ą1.7 L/yr - â‚ą3 L/yr

Sales & Marketing Officer
5 salaries
unlock blur

â‚ą3 L/yr - â‚ą4.7 L/yr

Explore more salaries
Compare Rajuri Steel with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

ArcelorMittal Nippon Steel

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview