Add office photos
Employer?
Claim Account for FREE

Punj Lloyd

4.4
based on 783 Reviews
Filter interviews by

10+ Mindgraph Interview Questions and Answers

Updated 8 Nov 2024

Q1. Explain water cement ratio in concrete? What you will recommend if cube strength differ 12% ?

Ans.

Water cement ratio in concrete is the ratio of the weight of water to the weight of cement used in the mixture.

  • Water cement ratio is an important factor in determining the strength and durability of concrete.

  • A lower water cement ratio generally results in higher strength concrete.

  • If the cube strength differs by 12%, it indicates a significant variation in the concrete mix.

  • To address this, the water cement ratio can be adjusted to achieve the desired strength.

  • For example, if t...read more

View 2 more answers

Q2. What is PPEs and it's need

Ans.

PPEs are Personal Protective Equipment used to protect workers from hazards in the workplace.

  • PPEs include items such as helmets, gloves, goggles, and safety shoes.

  • They are necessary to prevent injuries and illnesses in the workplace.

  • Employers are responsible for providing appropriate PPEs to their employees.

  • Workers should be trained on how to properly use and maintain their PPEs.

  • Regular inspections of PPEs should be conducted to ensure they are in good condition.

View 1 answer

Q3. Is safety aspect is essential or not.if yes what is PPE.what you take precautions while working in remote and gaseous 2 meter deep area.

Ans.

Safety aspect is essential. PPE stands for Personal Protective Equipment. Precautions include proper ventilation and use of gas detectors.

  • Safety is a top priority in any construction project.

  • PPE includes hard hats, safety glasses, gloves, and respirators.

  • Working in a remote and gaseous 2 meter deep area requires proper ventilation and use of gas detectors.

  • Workers should also be trained on emergency procedures in case of gas leaks or other hazards.

Add your answer

Q4. What necessary steps during excavation work 5 meter deep by Excavator?

Ans.

Necessary steps during excavation work 5 meter deep by Excavator

  • Ensure proper shoring and bracing to prevent cave-ins

  • Regularly inspect the excavation site for any signs of instability

  • Provide adequate lighting and ventilation in the excavation area

  • Ensure proper communication between the excavator operator and ground personnel

  • Have a rescue plan in place in case of emergencies

Add your answer
Discover Mindgraph interview dos and don'ts from real experiences

Q5. How you will utilize man and machine power.

Ans.

I will assign tasks based on the strengths of each worker and use machines for heavy lifting and repetitive tasks.

  • Assess the skills and abilities of each worker

  • Assign tasks based on their strengths

  • Use machines for heavy lifting and repetitive tasks

  • Train workers to use machines safely and efficiently

  • Regularly maintain and repair machines to ensure they are functioning properly

Add your answer

Q6. Welding cutting grinding work

Ans.

Welding, cutting, and grinding work are common tasks in industrial settings that require proper safety measures to prevent accidents and injuries.

  • Ensure proper ventilation to prevent exposure to harmful fumes and gases

  • Use appropriate personal protective equipment (PPE) such as gloves, goggles, and masks

  • Inspect tools and equipment regularly for any defects or malfunctions

  • Follow proper procedures and guidelines for each task to minimize risks

  • Provide training to workers on safe ...read more

Add your answer
Are these interview questions helpful?

Q7. 1. What is the reason for cracking in welding?

Ans.

Cracking in welding can occur due to various reasons such as improper welding technique, high stress, and material defects.

  • Improper welding technique such as using too much heat or not using enough filler material

  • High stress on the welded joint due to external forces or thermal expansion/contraction

  • Material defects such as impurities or inclusions in the base metal

  • Inadequate preheating or post-weld heat treatment

  • Incompatible welding materials or dissimilar metals

  • Lack of prope...read more

Add your answer

Q8. In TIG welding, instead of argon gas, only a small gas can be used.

Ans.

No, in TIG welding, argon gas is essential for shielding the weld area.

  • Argon gas is commonly used in TIG welding to create an inert atmosphere around the weld area.

  • The inert atmosphere prevents oxidation and contamination of the weld, resulting in high-quality welds.

  • Using a small gas or any other gas instead of argon can lead to poor weld quality and potential defects.

  • Examples of other gases that cannot be used in TIG welding include helium, nitrogen, and carbon dioxide.

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. Progress between Job planning and target

Ans.

Progress between job planning and target is monitored closely to ensure project stays on schedule.

  • Regularly track progress against the project schedule

  • Identify any delays or obstacles and address them promptly

  • Adjust the plan as needed to stay on track

  • Communicate with stakeholders about any changes or updates

  • Use project management software to help monitor progress

View 2 more answers

Q10. Different types of engines ex.diesel ,petrol, twostroke and four strokes

Ans.

There are different types of engines such as diesel, petrol, two-stroke, and four-stroke engines.

  • Diesel engines use compression ignition while petrol engines use spark ignition.

  • Two-stroke engines have a simpler design and are commonly used in small vehicles like motorcycles and scooters.

  • Four-stroke engines are more efficient and are commonly used in cars and larger vehicles.

  • Each type of engine has its own advantages and disadvantages depending on the application.

  • Other types o...read more

Add your answer

Q11. What is documentation and Process of documentation

Ans.

Documentation is the process of recording information in a systematic way to ensure accuracy and traceability.

  • Documentation involves creating written or electronic records of processes, procedures, and activities.

  • It helps in maintaining a clear record of what has been done, by whom, and when.

  • Documentation ensures consistency, compliance with regulations, and facilitates knowledge transfer.

  • Examples include project plans, meeting minutes, user manuals, and technical specificati...read more

Add your answer

Q12. What about attitudes and knowledge of software

Ans.

Attitudes and knowledge of software are crucial for a Department Head.

  • Strong knowledge of various software programs and applications is essential for effective management.

  • Positive attitudes towards learning new software and adapting to technological advancements are beneficial.

  • Experience in implementing software solutions to improve department efficiency and productivity is valuable.

Add your answer

Q13. Engine over hauling and maintenance of machinery

Ans.

Engine overhauling and maintenance are crucial for the smooth functioning of machinery.

  • Engine overhauling involves disassembling, cleaning, inspecting, repairing, and reassembling the engine.

  • Regular maintenance includes oil changes, filter replacements, and checking fluid levels.

  • Proper maintenance and overhauling can extend the life of machinery and prevent breakdowns.

  • It is important to follow manufacturer guidelines and use high-quality parts and fluids.

  • A skilled mechanic sh...read more

Add your answer

Q14. What is the covered area of project

Ans.

The covered area of the project is approximately 10,000 square feet.

  • The covered area includes the indoor space of the project.

  • It does not include any outdoor space or open areas.

  • The exact covered area may vary depending on the project.

  • In this particular project, the covered area is approximately 10,000 square feet.

Add your answer

Q15. Design offshore project

Ans.

Designing an offshore project involves planning, executing, and managing operations in a marine environment.

  • Identify project objectives and scope

  • Conduct feasibility studies and risk assessments

  • Select suitable location and design layout

  • Procure necessary equipment and materials

  • Implement safety measures and environmental protection protocols

  • Establish communication and logistics plan

  • Monitor progress and adjust plans as needed

Add your answer

Q16. Able to relocate

Ans.

Yes, I am willing to relocate for the right opportunity.

  • I am open to relocating for a better career prospect

  • I have relocated in the past for job opportunities

  • I am flexible and willing to move for the right role

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Mindgraph

based on 4 interviews in the last 1 year
Interview experience
4.3
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.9
 • 712 Interview Questions
4.0
 • 208 Interview Questions
4.0
 • 193 Interview Questions
3.9
 • 177 Interview Questions
3.8
 • 135 Interview Questions
View all
Top Punj Lloyd Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter