Upload Button Icon Add office photos

Punj Lloyd

Compare button icon Compare button icon Compare

Filter interviews by

Punj Lloyd Interview Questions, Process, and Tips

Updated 8 Nov 2024

Top Punj Lloyd Interview Questions and Answers

View all 16 questions

Punj Lloyd Interview Experiences

Popular Designations

18 interviews found

TIG Welder Interview Questions & Answers

user image Anonymous

posted on 3 May 2021

Interview Questionnaire 

2 Questions

  • Q1. 1. What is the reason for cracking in welding?
  • Ans. 

    Cracking in welding can occur due to various reasons such as improper welding technique, high stress, and material defects.

    • Improper welding technique such as using too much heat or not using enough filler material

    • High stress on the welded joint due to external forces or thermal expansion/contraction

    • Material defects such as impurities or inclusions in the base metal

    • Inadequate preheating or post-weld heat treatment

    • Incomp...

  • Answered by AI
  • Q2. In TIG welding, instead of argon gas, only a small gas can be used.
  • Ans. 

    No, in TIG welding, argon gas is essential for shielding the weld area.

    • Argon gas is commonly used in TIG welding to create an inert atmosphere around the weld area.

    • The inert atmosphere prevents oxidation and contamination of the weld, resulting in high-quality welds.

    • Using a small gas or any other gas instead of argon can lead to poor weld quality and potential defects.

    • Examples of other gases that cannot be used in TIG ...

  • Answered by AI

TIG Welder Interview Questions asked at other Companies

Q1. 1. What is the reason for cracking in welding?
View answer (1)

I applied via Campus Placement and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Which is your favorite subject ?
  • Ans. 

    My favorite subject is electrical engineering.

    • I have always been fascinated by the principles and applications of electrical engineering.

    • I enjoy studying topics such as circuit analysis, power systems, and control systems.

    • I find joy in solving complex electrical problems and designing innovative solutions.

    • One of my favorite projects was designing a solar-powered charging station for a rural community.

    • I am constantly le...

  • Answered by AI
  • Q2. Supposed,you have already join this company and suddenly your parent call you and tell you that your family have a very problem,so that's present condition what will you call them?

Interview Preparation Tips

Interview preparation tips for other job seekers - Most important eye to eye contact with interview sir,full confidence in your mind and talk to him,and etc

Engineer Trainee Interview Questions asked at other Companies

Q1. If 10 people had a meeting and they shake hands only once with each of the others, then how many handshakes will be there in total ?
View answer (8)

I applied via Company Website and was interviewed before Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Explain water cement ratio in concrete? What you will recommend if cube strength differ 12% ?
  • Ans. 

    Water cement ratio in concrete is the ratio of the weight of water to the weight of cement used in the mixture.

    • Water cement ratio is an important factor in determining the strength and durability of concrete.

    • A lower water cement ratio generally results in higher strength concrete.

    • If the cube strength differs by 12%, it indicates a significant variation in the concrete mix.

    • To address this, the water cement ratio can be ...

  • Answered by AI
  • Q2. What necessary steps during excavation work 5 meter deep by Excavator?
  • Ans. 

    Necessary steps during excavation work 5 meter deep by Excavator

    • Ensure proper shoring and bracing to prevent cave-ins

    • Regularly inspect the excavation site for any signs of instability

    • Provide adequate lighting and ventilation in the excavation area

    • Ensure proper communication between the excavator operator and ground personnel

    • Have a rescue plan in place in case of emergencies

  • Answered by AI
  • Q3. How you complete the work if it going two months behind of schedule. Will it affect project cost.
  • Q4. How you will utilize man and machine power.
  • Ans. 

    I will assign tasks based on the strengths of each worker and use machines for heavy lifting and repetitive tasks.

    • Assess the skills and abilities of each worker

    • Assign tasks based on their strengths

    • Use machines for heavy lifting and repetitive tasks

    • Train workers to use machines safely and efficiently

    • Regularly maintain and repair machines to ensure they are functioning properly

  • Answered by AI
  • Q5. Is safety aspect is essential or not.if yes what is PPE.what you take precautions while working in remote and gaseous 2 meter deep area.
  • Ans. 

    Safety aspect is essential. PPE stands for Personal Protective Equipment. Precautions include proper ventilation and use of gas detectors.

    • Safety is a top priority in any construction project.

    • PPE includes hard hats, safety glasses, gloves, and respirators.

    • Working in a remote and gaseous 2 meter deep area requires proper ventilation and use of gas detectors.

    • Workers should also be trained on emergency procedures in case o

  • Answered by AI
  • Q6. What are the working time in previous company?Have you ready to work in night time also.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Practical and give answer like problem solving nature without affecting extra cost.

Civil Superintendent Interview Questions asked at other Companies

Q1. Explain water cement ratio in concrete? What you will recommend if cube strength differ 12% ?
View answer (3)

I applied via Naukri.com and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Department related questions
Round 2 - Technical 

(1 Question)

  • Q1. Management question, site related questions
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations, job location

Interview Preparation Tips

Topics to prepare for Punj Lloyd HSE Engineer interview:
  • Construction related
Interview preparation tips for other job seekers - Nice company, once got a chance in this organization u never left from this

HSE Engineer Interview Questions asked at other Companies

Q1. What safety measures might be followed during the lifting operation in the working premises?
View answer (2)

Punj Lloyd interview questions for popular designations

 HSE Engineer

 (2)

 Deputy Manager

 (2)

 Purchase Assistant

 (1)

 Management Trainee

 (1)

 Department Head

 (1)

 Data Engineer

 (1)

 Senior Mechanic

 (1)

 Senior Executive

 (1)

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Gm 

(3 Questions)

  • Q1. What is your last project and its site design
  • Q2. What is the covered area of project
  • Ans. 

    The covered area of the project is approximately 10,000 square feet.

    • The covered area includes the indoor space of the project.

    • It does not include any outdoor space or open areas.

    • The exact covered area may vary depending on the project.

    • In this particular project, the covered area is approximately 10,000 square feet.

  • Answered by AI
  • Q3. What type of building

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (69)

Get interview-ready with Top Punj Lloyd Interview Questions

I was interviewed before Jul 2016.

Interview Questionnaire 

2 Questions

  • Q1. All questions from structure especially from psc guader.
  • Q2. How munch salery you getting from present employer and what is your expectations.
  • Ans. 

    I am currently receiving a salary of $60,000 from my present employer. My salary expectation for this role is in the range of $70,000 to $80,000.

    • Current salary: $60,000

    • Salary expectation: $70,000 - $80,000

    • Open to negotiation based on benefits and responsibilities

  • Answered by AI

Interview Preparation Tips

Round: Resume Shortlist
Experience: Just sent my resume
Tips: You have to send your resume to write email

Round: Technical Interview
Experience: I was comfortably selected I knew during interview.
Tips: Listen first during interview don't try to over smart.

Round: HR Interview
Experience: I simply told them the actual current CTC and expected CTC is 20% more.
Tips: Just give them the true details.

Skills: Structural Engineering

I applied via Recruitment Consultant and was interviewed before Jul 2017. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. HR &ADMIN Related

Interview Preparation Tips

General Tips: No
Skills: Decision Making Skills
Duration: <1 week

I was interviewed before Jul 2016.

Interview Questionnaire 

2 Questions

  • Q1. About Basics for Technical Purchase
  • Q2. Same Technical Quotations related to Purchase for Electrical/Misc Items Purchase by Senior Officials of Company & HR interview like Minimum Salary and benefits are required by me and Minimum time required ...

Interview Preparation Tips

Round: Technical Interview
Experience: Informed about all information is to required for Technical/Engineering Items Spares Parts Mechanical/Electrical/Electronics to get Purchased at lower cost/Value Engineering/Vendor Development etc
Tips: for Example you are considering Purchase Mechanical Seal from Market and your Machine has been break down at site and with Part No this item in Parent Company NA for Six Months Time as Technical Purchase Manager your responsibity arrange same from Market with Help of Dimensions and Drawings from Site as this items sample cannot be provided to you for Purchase removal for this seal leads for loss Many work hours for Men and Machine hours say one hours Loss is 50.00 Lacks at Site then your ability is Arrange it or get developed from Market in Shortest time.

Round: Technical + HR Interview
Experience: Nice Interview
Tips: one should provide honestly about ones ability for solving problems for organization for which they are hiring you but do not over smart for ones ability for getting job in tearms of Salary false benefits to present Employer which you are not getting from Present Employer Honesty is best policy.

Round: General Qustions.
Experience: Nice Interview
Tips: Honesty is best policy

Round: General Qutions
Experience: Nice Interview
Tips: Honesty is Best Policy

Round: General Qutions
Experience: Nice Interview
Tips: Honesty is Best Policy

Round: Problem Statement
Experience: in such situation we should contact OEM for that Machine Provide him Model No, Machine Sl No ,Make and Model and Year of Manufacture etc and get Performa Invoice with Shortest Delivery Time at Site and Direct Material Delivery at site in shortest time with least cost to present company.
Tips: in such Case Emergency Breakdown Project Manager/GM recommendations for Financial Approval and RTGS of Funds to Vendor should be done get Material should get delivered in shortest time I Management is very important.

Purchase Assistant Interview Questions asked at other Companies

Q1. Maintenance service for out sourcing
View answer (1)

Punj Lloyd Interview FAQs

How many rounds are there in Punj Lloyd interview?
Punj Lloyd interview process usually has 1-2 rounds. The most common rounds in the Punj Lloyd interview process are Technical, Resume Shortlist and One-on-one Round.
What are the top questions asked in Punj Lloyd interview?

Some of the top questions asked at the Punj Lloyd interview -

  1. Explain water cement ratio in concrete? What you will recommend if cube strengt...read more
  2. Is safety aspect is essential or not.if yes what is PPE.what you take precautio...read more
  3. What necessary steps during excavation work 5 meter deep by Excavat...read more
How long is the Punj Lloyd interview process?

The duration of Punj Lloyd interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Punj Lloyd Interview Process

based on 16 interviews

Interview experience

4.3
  
Good
View more

Punj Lloyd Reviews and Ratings

based on 791 reviews

4.3/5

Rating in categories

4.0

Skill development

4.2

Work-life balance

3.9

Salary

3.9

Job security

4.2

Company culture

3.8

Promotions

4.2

Work satisfaction

Explore 791 Reviews and Ratings
Deputy Manager
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
37 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

QA QC Engineer
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
32 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
29 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Punj Lloyd with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview