I applied via Company Website and was interviewed before Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Explain water cement ratio in concrete? What you will recommend if cube strength differ 12% ?
  • Ans. 

    Water cement ratio in concrete is the ratio of the weight of water to the weight of cement used in the mixture.

    • Water cement ratio is an important factor in determining the strength and durability of concrete.

    • A lower water cement ratio generally results in higher strength concrete.

    • If the cube strength differs by 12%, it indicates a significant variation in the concrete mix.

    • To address this, the water cement ratio can be ...

  • Answered by AI
  • Q2. What necessary steps during excavation work 5 meter deep by Excavator?
  • Ans. 

    Necessary steps during excavation work 5 meter deep by Excavator

    • Ensure proper shoring and bracing to prevent cave-ins

    • Regularly inspect the excavation site for any signs of instability

    • Provide adequate lighting and ventilation in the excavation area

    • Ensure proper communication between the excavator operator and ground personnel

    • Have a rescue plan in place in case of emergencies

  • Answered by AI
  • Q3. How you complete the work if it going two months behind of schedule. Will it affect project cost.
  • Q4. How you will utilize man and machine power.
  • Ans. 

    I will assign tasks based on the strengths of each worker and use machines for heavy lifting and repetitive tasks.

    • Assess the skills and abilities of each worker

    • Assign tasks based on their strengths

    • Use machines for heavy lifting and repetitive tasks

    • Train workers to use machines safely and efficiently

    • Regularly maintain and repair machines to ensure they are functioning properly

  • Answered by AI
  • Q5. Is safety aspect is essential or not.if yes what is PPE.what you take precautions while working in remote and gaseous 2 meter deep area.
  • Ans. 

    Safety aspect is essential. PPE stands for Personal Protective Equipment. Precautions include proper ventilation and use of gas detectors.

    • Safety is a top priority in any construction project.

    • PPE includes hard hats, safety glasses, gloves, and respirators.

    • Working in a remote and gaseous 2 meter deep area requires proper ventilation and use of gas detectors.

    • Workers should also be trained on emergency procedures in case o

  • Answered by AI
  • Q6. What are the working time in previous company?Have you ready to work in night time also.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Practical and give answer like problem solving nature without affecting extra cost.

Interview questions from similar companies

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mathematics, English, Reasoning

Round 2 - Technical 

(2 Questions)

  • Q1. They asked Technical questions
  • Q2. What is antenna What is satcom
  • Ans. 

    An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.

    • Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.

    • Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...

  • Answered by AI
Round 3 - Group Discussion 

Clean India
Corruption

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and believe in yourself

Punj Lloyd Interview FAQs

What are the top questions asked in Punj Lloyd Civil Superintendent interview?

Some of the top questions asked at the Punj Lloyd Civil Superintendent interview -

  1. Explain water cement ratio in concrete? What you will recommend if cube strengt...read more
  2. Is safety aspect is essential or not.if yes what is PPE.what you take precautio...read more
  3. What necessary steps during excavation work 5 meter deep by Excavat...read more

Tell us how to improve this page.

Deputy Manager
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
37 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

QA QC Engineer
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
32 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
29 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Punj Lloyd with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview