Upload Button Icon Add office photos

Psp Projects

Compare button icon Compare button icon Compare

Filter interviews by

Psp Projects Assistant Billing Engineer Interview Questions and Answers for Freshers

Updated 17 Apr 2024

Psp Projects Assistant Billing Engineer Interview Experiences for Freshers

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I appeared for an interview in Mar 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Formula to find unit weight of circulat bar?
  • Ans. 

    Unit weight of circular bar can be calculated using a specific formula.

    • The formula to find the unit weight of a circular bar is: Unit weight = (π * D^2 * L * ρ) / 4

    • Where D is the diameter of the circular bar, L is the length of the bar, and ρ is the density of the material.

    • Make sure to use consistent units for diameter, length, and density in the formula.

    • For example, if the diameter of the circular bar is 10 mm, the le...

  • Answered by AI

Interview questions from similar companies

I applied via Walk-in and was interviewed in May 2019. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. 1st question - General information myself then TECHNICAL question asked from underground storm water,Sewerage network, and watersupply (WTP) and Levelling then quality testing question asked again and aga...

Interview Preparation Tips

Interview preparation tips for other job seekers - Short answer technical

I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Rates of sub-contractors . Billing process. Reconciliation means and how it is done. Rate Analysis. Key points of your last project. Type of structure that you had seen in your last company. And their deta...
  • Ans. 

    The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.

    • Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process

    • Discussed the importance of reconciliation in ensuring accurate billing and payment

    • Described the process of rate analysis and how ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and never ever show that u r nervous even if u don't know the answer.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Estimation of a small building.

Round 3 - Technical 

(4 Questions)

  • Q1. Ratio of block work motor and plastrimg motor.
  • Ans. 

    The ratio of block work motor to plastering motor is typically 1:3.

    • The ratio of block work motor to plastering motor is usually 1:3.

    • This means for every 1 part of block work motor, 3 parts of plastering motor are used.

    • The ratio may vary depending on the specific project requirements.

  • Answered by AI
  • Q2. Per day productivity of a labour
  • Ans. 

    The productivity of a laborer can be calculated by the amount of work completed in a day.

    • Productivity is measured by the amount of work completed in a specific time frame, in this case, per day.

    • Factors affecting productivity include skill level, motivation, tools/equipment available, and working conditions.

    • Example: A construction worker completing 10 tasks in a day is more productive than one completing only 5 tasks.

  • Answered by AI
  • Q3. Amount of binding wire to be used per tone of reinforcement
  • Ans. 

    Binding wire is typically used at a rate of 8-10 kg per ton of reinforcement.

    • Typically, 8-10 kg of binding wire is used per ton of reinforcement to secure the bars in place.

    • The amount of binding wire needed may vary based on the complexity of the reinforcement design and the spacing between bars.

    • Using too little binding wire can result in inadequate reinforcement stability, while using too much can be wasteful and incr

  • Answered by AI
  • Q4. Density of materials
  • Ans. 

    Density of materials is a measure of how much mass is contained in a given volume.

    • Density is typically measured in units such as grams per cubic centimeter (g/cm^3) or kilograms per liter (kg/L).

    • Materials with higher density have more mass packed into a given volume.

    • Common examples of materials with high density include metals like lead and gold.

    • Materials with low density include gases like helium and liquids like oil.

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Salary discussed

Interview Preparation Tips

Interview preparation tips for other job seekers - Feel free to talk to the interviewer
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Bar Bending Schedule
  • Q2. Find out shuttering Area
  • Ans. 

    Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.

    • Calculate the surface area of each individual formwork used for the concrete structure

    • Add up the surface areas of all formworks to get the total shuttering area

    • Consider any openings or gaps in the formwork when calculating the area

  • Answered by AI
  • Q3. Semi circle area formula
  • Ans. 

    The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.

    • The formula for the area of a semi-circle is (1/2) * pi * r^2

    • The radius (r) is half the diameter of the circle

    • Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. Why u want to join this company ?
  • Q2. Why u want to quit Your present company
  • Q3. About my Salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Any civil engineer work 12 year experience

Round 2 - Technical 

(2 Questions)

  • Q1. What is your company name
  • Ans. 

    Our company name is XYZ Engineering Solutions, specializing in civil engineering projects.

    • XYZ Engineering Solutions is a reputable firm in the civil engineering industry

    • We have successfully completed projects such as bridge construction, road infrastructure development, and building design

    • Our team of experienced engineers and architects ensure high-quality and innovative solutions

  • Answered by AI
  • Q2. Location in my nearest home town

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work and clear attitude
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(1 Question)

  • Q1. What is BMD & SFD
  • Ans. 

    BMD stands for Bending Moment Diagram and SFD stands for Shear Force Diagram in civil engineering.

    • BMD shows the variation of bending moment along the length of a beam.

    • SFD shows the variation of shear force along the length of a beam.

    • Both diagrams are essential for analyzing the internal forces in a structure.

    • BMD and SFD are commonly used in structural analysis and design.

    • Understanding BMD and SFD helps in determining t

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. From civil IS CODES
  • Q2. About steel reinforcements, bbs,various tests
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(2 Questions)

  • Q1. How to control quality.
  • Ans. 

    Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.

    • Establishing quality control procedures and protocols

    • Regular inspections and testing of materials and workmanship

    • Training and educating staff on quality standards

    • Implementing corrective actions when deviations are identified

    • Utilizing quality control tools such as checklists

  • Answered by AI
  • Q2. What is BBS is code.
  • Ans. 

    BBS in code refers to Bar Bending Schedule as per Indian standards.

    • BBS stands for Bar Bending Schedule.

    • It is a detailed list of reinforcement bars to be used in a construction project.

    • It includes information on bar sizes, shapes, quantities, and placement.

    • BBS is prepared as per the requirements of Indian standards like IS 2502:1963.

    • It helps in ensuring proper reinforcement placement and quantity in the structure.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. What is the minimum compressive strength of M25 grade concrete?
  • Ans. 

    M25 grade concrete has a minimum compressive strength of 25 MPa (megapascals) at 28 days of curing.

    • M25 is a medium-grade concrete used in structural applications.

    • The compressive strength is determined through standard cube tests.

    • For M25, the standard cube size is typically 150mm x 150mm x 150mm.

    • It is commonly used in residential buildings, pavements, and precast elements.

    • M25 concrete mix typically consists of a ratio o

  • Answered by AI
  • Q2. What is the significance of the lapping zone in columns?
  • Ans. 

    The lapping zone in columns is crucial for structural integrity and load distribution in reinforced concrete structures.

    • Lapping zone refers to the area where two reinforcing bars overlap to ensure continuity.

    • It helps in transferring loads effectively between the bars, preventing weak points.

    • Proper lapping length is essential to avoid failure; typically, it is 40 times the diameter of the bar.

    • In seismic zones, adequate ...

  • Answered by AI
  • Q3. What is the slump test and its significance in construction?
  • Ans. 

    The slump test measures the consistency and workability of fresh concrete, crucial for construction quality.

    • The slump test involves filling a conical mold with concrete and measuring the vertical drop after removing the mold.

    • A higher slump indicates more workability, suitable for complex shapes; a lower slump indicates stiffer concrete, ideal for structural elements.

    • For example, a slump of 0-25 mm is typical for struct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay calm and quiet at the moment.

Psp Projects Interview FAQs

How many rounds are there in Psp Projects Assistant Billing Engineer interview for freshers?
Psp Projects interview process for freshers usually has 1 rounds. The most common rounds in the Psp Projects interview process for freshers are Technical.

Tell us how to improve this page.

Psp Projects Assistant Billing Engineer Interview Process for Freshers

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 117 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
View all
Psp Projects Assistant Billing Engineer Salary
based on 23 salaries
₹3.6 L/yr - ₹6.7 L/yr
30% more than the average Assistant Billing Engineer Salary in India
View more details

Psp Projects Assistant Billing Engineer Reviews and Ratings

based on 4 reviews

4.1/5

Rating in categories

4.1

Skill development

3.3

Work-life balance

3.7

Salary

3.8

Job security

3.5

Company culture

3.0

Promotions

3.5

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Engineer
153 salaries
unlock blur

₹3 L/yr - ₹6.5 L/yr

Senior Engineer
144 salaries
unlock blur

₹3.8 L/yr - ₹10 L/yr

Junior Engineer
82 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Senior Civil Engineer
51 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Assistant Engineer - Civil
50 salaries
unlock blur

₹2.6 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Psp Projects with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview