I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Belt utilisation formula calculates the percentage of time a conveyor belt is in use.
Belt utilisation formula = (total operating time / total time) x 100%
Total operating time includes the time the belt is running and the time it is loaded but not running
Total time includes the operating time plus any downtime for maintenance or repairs
Example: If a conveyor belt runs for 8 hours a day and is loaded for 6 hours, the bel...
A Belt Safety Device is a safety mechanism that prevents a conveyor belt from running when it's not supposed to.
It is used in conveyor systems to prevent accidents and injuries.
It can detect if the belt is misaligned, torn, or broken.
It can also detect if there is an object on the belt that shouldn't be there.
Examples of Belt Safety Devices include emergency stop switches, pull cords, and belt sway switches.
Belt capacity refers to the maximum amount of material that a conveyor belt can handle.
Belt capacity is measured in tons per hour or cubic meters per hour.
It depends on the width and speed of the belt, as well as the characteristics of the material being transported.
For example, a belt with a width of 1 meter and a speed of 2 meters per second may have a capacity of 1000 tons per hour for coal, but only 500 tons per ho
Power Mech Projects interview questions for popular designations
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
Yes, I have experience handling fitters in previous roles.
Yes, I have managed a team of fitters in my previous job.
I am familiar with coordinating schedules and tasks for fitters.
I have experience in training new fitters on safety procedures and equipment usage.
Centering in Mill Wright Fitting involves aligning components accurately for proper assembly.
Use precision measuring tools like calipers and micrometers to ensure accurate alignment
Check for any gaps or misalignments before tightening bolts or fasteners
Utilize shims or spacers to adjust alignment as needed
Follow manufacturer's specifications and blueprints for precise centering
Regularly inspect and maintain alignment t
Get interview-ready with Top Power Mech Projects Interview Questions
I applied via Campus Placement and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Nov 2022. There were 4 interview rounds.
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for career growth and new experiences.
I have relocated for previous job opportunities and have found it to be a positive experience.
I understand the importance of being flexible and adaptable in the engineering field.
I applied via Campus Placement and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Feb 2022. There were 4 interview rounds.
The interview question covers various safety hazards and procedures related to confined spaces, conveyor systems, welding, and gas cutting.
Confined space hazards include lack of oxygen, toxic gases, and physical hazards
Safe working percentage of O2 in confined space is 19.5% or higher
Conveyor hazards include pinch points, entanglement, and falling objects
Work permit system is used to ensure that all necessary safety me...
Top trending discussions
The duration of Power Mech Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 104 interviews
Interview experience
based on 1.6k reviews
Rating in categories
Senior Engineer
486
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
340
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
255
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
242
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
215
salaries
| ₹0 L/yr - ₹0 L/yr |
Thermax Limited
BGR Energy Systems
Larsen & Toubro Limited
Kalpataru Projects International