Filter interviews by
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
1st round is conducted with simple aptitude and civil basic queations. By getting above of 25 we can qualify the first round out of 40 marks
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
Target mean strength of M-35 Grade concrete is 35 MPa.
The target mean strength of M-35 Grade concrete is 35 MPa.
M-35 Grade concrete is designed for structural applications requiring high strength.
Quality control measures should be in place to ensure the concrete meets the target strength.
Soil compaction percentage in embankment typically ranges from 90% to 95% depending on the type of soil and project specifications.
Soil compaction percentage in embankment is usually between 90% to 95%
The exact percentage may vary based on the type of soil being compacted
Project specifications and requirements will dictate the specific compaction percentage to be achieved
Power Mech Projects interview questions for popular designations
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
Get interview-ready with Top Power Mech Projects Interview Questions
I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.
Transformer protection is essential to prevent damage and ensure safe operation.
The protection system should detect and isolate faults quickly.
Common protection methods include overcurrent, differential, and distance protection.
Proper maintenance and testing of protection equipment is crucial.
Examples of transformer protection devices include Buchholz relays, pressure relief devices, and temperature sensors.
Master trip relay is a protective relay that trips all the circuit breakers in a power system in case of a fault.
It is used to protect the power system from damage due to faults
It is connected to all the circuit breakers in the system
It operates when a fault is detected and trips all the circuit breakers simultaneously
It is an important component of the protection system in power plants and substations
Event and DR are crucial in SCADA operation for ensuring system reliability and continuity.
Event refers to any occurrence that requires attention or action, such as a fault or alarm.
DR (Disaster Recovery) is a plan for restoring normal system operation in case of a catastrophic event.
SCADA systems rely on event and DR management to ensure uninterrupted operation and prevent downtime.
Examples of events in SCADA operatio...
Line protection relays are used for protecting transmission lines from faults.
Line protection relays are used to detect faults in transmission lines and isolate them from the system.
These relays can be of different types such as distance, differential, and directional relays.
Distance relays measure the impedance of the line and trip when the impedance falls below a certain threshold.
Differential relays compare the curr...
Not conducted the aptitude test
posted on 28 Oct 2022
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Belt utilisation formula calculates the percentage of time a conveyor belt is in use.
Belt utilisation formula = (total operating time / total time) x 100%
Total operating time includes the time the belt is running and the time it is loaded but not running
Total time includes the operating time plus any downtime for maintenance or repairs
Example: If a conveyor belt runs for 8 hours a day and is loaded for 6 hours, the bel...
A Belt Safety Device is a safety mechanism that prevents a conveyor belt from running when it's not supposed to.
It is used in conveyor systems to prevent accidents and injuries.
It can detect if the belt is misaligned, torn, or broken.
It can also detect if there is an object on the belt that shouldn't be there.
Examples of Belt Safety Devices include emergency stop switches, pull cords, and belt sway switches.
Belt capacity refers to the maximum amount of material that a conveyor belt can handle.
Belt capacity is measured in tons per hour or cubic meters per hour.
It depends on the width and speed of the belt, as well as the characteristics of the material being transported.
For example, a belt with a width of 1 meter and a speed of 2 meters per second may have a capacity of 1000 tons per hour for coal, but only 500 tons per ho
Top trending discussions
Interview experience
based on 1.6k reviews
Rating in categories
Senior Engineer
411
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Assistant Manager
334
salaries
| ₹4.1 L/yr - ₹10 L/yr |
Engineer
273
salaries
| ₹2 L/yr - ₹6.9 L/yr |
Mechanical Engineer
242
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Electrical Engineer
218
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Thermax Limited
BGR Energy Systems
Larsen & Toubro Limited
Kalpataru Projects International