Upload Button Icon Add office photos

Power Mech Projects

Compare button icon Compare button icon Compare

Filter interviews by

Power Mech Projects Site Engineer Interview Questions and Answers for Freshers

Updated 16 May 2023

Power Mech Projects Site Engineer Interview Experiences for Freshers

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. All ques related to your work in current company
  • Q2. About Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Give interview with confidence and be aware for salary negotiation

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Tell me about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil Engineer
For interview

I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary breakups about current CTC:- Expected CTC:-

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview starts with full confidence not in over confidence. Keep your mind cool at time of interweaving

I applied via Company Website and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Previous working experience detailed. Documents verification
Round 3 - Technical 

(4 Questions)

  • Q1. What is concrete Temperature
  • Ans. 

    Concrete temperature refers to the temperature of freshly mixed concrete.

    • Concrete temperature affects the setting time and strength development of concrete.

    • It is important to control the temperature of concrete during mixing, transportation, and placement.

    • High temperatures can accelerate the setting time and reduce workability, while low temperatures can slow down setting and strength gain.

    • Concrete temperature is typic...

  • Answered by AI
  • Q2. Precocious of water structure joint
  • Ans. 

    Precocious of water structure joint refers to the ability of a joint to withstand water pressure and prevent leakage.

    • Water structure joints should be designed and constructed to be watertight.

    • Various types of joints can be used in water structures, such as expansion joints, construction joints, and control joints.

    • Proper sealing materials and techniques should be employed to ensure the integrity of the joints.

    • Regular in...

  • Answered by AI
  • Q3. Cube test results in 7 days & 28 days
  • Ans. 

    Cube test results are used to determine the compressive strength of concrete at 7 and 28 days.

    • Cube test involves casting cubes of concrete and testing them under compression

    • Results are reported in terms of compressive strength in MPa or psi

    • 7-day results are used to determine early strength and 28-day results are used to determine ultimate strength

    • Concrete with a compressive strength of at least 20 MPa is considered sui

  • Answered by AI
  • Q4. 7 days Results 65% & 28 days Results 99.99%

Interview Preparation Tips

Interview preparation tips for other job seekers - All question previous working Area & civil backgrounds basic question

Interview Questionnaire 

1 Question

  • Q1. What are the check for starting excavation work.
  • Ans. 

    Checklist for starting excavation work

    • Obtain necessary permits and approvals

    • Ensure proper marking and surveying of excavation area

    • Identify and mark underground utilities

    • Ensure proper safety measures are in place

    • Inspect excavation equipment and tools

    • Ensure proper disposal of excavated materials

    • Monitor weather conditions

    • Ensure proper communication and coordination with stakeholders

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, discipline, always on time, ready to move other location.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Execution department questions
  • Q2. Pipe laying questions
  • Q3. Joining questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Working of power transformer

Round 2 - Technical 

(1 Question)

  • Q1. Power factor of alternatar
  • Ans. 

    Power factor of an alternator is a measure of how effectively it converts mechanical power into electrical power.

    • Power factor is the cosine of the angle between the voltage and current waveforms in an AC circuit.

    • It indicates the phase difference between voltage and current and ranges from 0 to 1.

    • A power factor of 1 means the alternator is operating at maximum efficiency.

    • A lagging power factor (less than 1) indicates th...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is full form of SBC
  • Ans. 

    SBC stands for Standard Building Code.

    • SBC stands for Standard Building Code.

    • It is a set of regulations and guidelines for construction and building safety.

    • SBC helps ensure that buildings are constructed in a safe and structurally sound manner.

  • Answered by AI
  • Q2. Density of concrete
  • Ans. 

    Density of concrete is the mass per unit volume of concrete.

    • Density of normal concrete ranges from 2200 to 2500 kg/m^3

    • Lightweight concrete has a density of 800 to 2000 kg/m^3

    • Factors affecting density include type of aggregates, water-cement ratio, and air content

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Diameter of TBM
  • Ans. 

    The diameter of a Tunnel Boring Machine (TBM) is the size of the tunnel it can create.

    • The diameter of a TBM can vary depending on the specific machine and project requirements.

    • Common diameters for TBMs range from 3 to 19 meters.

    • The diameter of the TBM determines the size of the tunnel it can bore.

    • TBMs with larger diameters are typically used for larger tunnels or projects.

    • The diameter of the TBM is an important factor

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Tell me something about yourself

Power Mech Projects Interview FAQs

How many rounds are there in Power Mech Projects Site Engineer interview for freshers?
Power Mech Projects interview process for freshers usually has 2 rounds. The most common rounds in the Power Mech Projects interview process for freshers are Resume Shortlist and Technical.

Tell us how to improve this page.

Power Mech Projects Site Engineer Interview Process for Freshers

based on 1 interview

Interview experience

5
  
Excellent
View more
Power Mech Projects Site Engineer Salary
based on 58 salaries
₹2 L/yr - ₹5.5 L/yr
6% less than the average Site Engineer Salary in India
View more details

Power Mech Projects Site Engineer Reviews and Ratings

based on 20 reviews

4.0/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

3.7

Salary

3.9

Job security

4.0

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 20 Reviews and Ratings
Senior Engineer
486 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
340 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
255 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
242 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Engineer
215 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Power Mech Projects with

Thermax Limited

4.1
Compare

BGR Energy Systems

3.8
Compare

Larsen & Toubro Limited

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview