i
Plasser India
Filter interviews by
I applied via Referral and was interviewed in Nov 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before Nov 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
Plasser India interview questions for popular designations
I applied via Recruitment Consultant and was interviewed in Jun 2020. There were 4 interview rounds.
Yes, I can read drawings.
I have experience reading technical drawings and blueprints.
I am familiar with symbols, dimensions, and tolerances used in drawings.
I can interpret different views and sections in a drawing.
I understand the importance of accuracy and attention to detail when reading drawings.
I have successfully operated VMC machines based on drawings provided.
5S is a workplace organization method that stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort: Remove unnecessary items from the workplace
Set in Order: Organize the remaining items in a logical and efficient manner
Shine: Clean and maintain the workplace regularly
Standardize: Establish procedures and guidelines for maintaining the workplace
Sustain: Continuously improve and maintain the 5S system
I applied via Recruitment Consultant and was interviewed in Oct 2019. There was 1 interview round.
SCCR stands for Short-Circuit Current Rating.
SCCR is a measure of the maximum amount of current that a device or system can safely withstand during a short circuit.
It is an important consideration in electrical design to ensure the protection of equipment and personnel.
SCCR is typically expressed in amperes (A) and is determined through testing or calculations.
It helps in selecting appropriate protective devices such a...
OLR setting in a star-delta connection determines the transition point between star and delta mode.
OLR stands for Overload Relay.
In a star-delta connection, the motor is initially started in star mode to reduce the starting current.
After a certain time, the motor is switched to delta mode for normal operation.
The OLR setting determines the current threshold at which the transition from star to delta occurs.
The OLR sett...
HRC fuse stands for High Rupturing Capacity fuse. It is a type of fuse that is designed to safely interrupt high fault currents.
HRC fuse is used in electrical systems to protect against overcurrents and short circuits.
It has a high breaking capacity, which means it can safely interrupt high fault currents without causing damage.
The fuse contains a fuse element made of a material that can withstand high temperatures and...
The two earthing terminals in a motor provide redundancy and ensure safety in case of a fault.
The first earthing terminal is connected to the motor frame, providing a path for fault current to flow and preventing electric shock to personnel.
The second earthing terminal is connected to the motor winding, providing a path for fault current to flow and protecting the motor from damage.
Having two earthing terminals ensures...
I applied via LinkedIn and was interviewed before Oct 2020. There were 3 interview rounds.
Top trending discussions
based on 20 interviews
Interview experience
based on 260 reviews
Rating in categories
Engineer
93
salaries
| ₹3.6 L/yr - ₹11 L/yr |
Senior Engineer
92
salaries
| ₹6 L/yr - ₹16.8 L/yr |
Service Engineer
56
salaries
| ₹3.9 L/yr - ₹9 L/yr |
Assistant Manager
47
salaries
| ₹11 L/yr - ₹25 L/yr |
Design Engineer
37
salaries
| ₹4 L/yr - ₹14 L/yr |
ABB
Siemens
Alstom Transportation
BHEL