I applied via Walk-in and was interviewed before Jul 2020. There were 3 interview rounds.
posted on 22 Jul 2021
I applied via Indeed and was interviewed in Jun 2021. There was 1 interview round.
Efficiency of a boiler can be increased by improving insulation, optimizing combustion, and regular maintenance.
Improve insulation to reduce heat loss
Optimize combustion by adjusting air-to-fuel ratio and using efficient burners
Regular maintenance to clean and repair components
Use economizers to recover waste heat
Upgrade to high-efficiency boilers
Implement energy management systems to monitor and control boiler operati
posted on 14 Nov 2019
posted on 24 Mar 2023
I have 3 years of experience working as a Production Engineer in a manufacturing company.
Managed production processes and ensured smooth operations
Implemented lean manufacturing principles to improve efficiency
Collaborated with cross-functional teams to troubleshoot and resolve production issues
Developed and implemented preventive maintenance programs
Analyzed production data to identify areas for improvement
Led a team ...
Experienced production engineer with a background in mechanical engineering and a passion for optimizing manufacturing processes.
Graduated with a degree in Mechanical Engineering
Worked for 5 years in the manufacturing industry
Implemented lean manufacturing principles to improve production efficiency
Led a team in reducing production costs by 15% through process optimization
Knocking is an abnormal combustion phenomenon in internal combustion engines.
Knocking occurs when the air-fuel mixture in the engine's cylinders ignites prematurely or unevenly.
It produces a knocking or pinging sound, which can cause damage to the engine if not addressed.
Factors contributing to knocking include low octane fuel, high engine temperatures, and incorrect ignition timing.
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Kanban is a lean manufacturing system that ensures smooth inventory flow. Material shortage is managed by effective planning and communication with vendors. Manpower is handled by proper training and allocation of resources.
Kanban is a visual system that helps in managing inventory levels and production flow
Effective planning and communication with vendors helps in managing material shortage
Proper training and allocati...
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I have achieved significant improvements in all 4M areas throughout my career.
Implemented new machine maintenance program resulting in 20% decrease in downtime
Developed new material sourcing strategy resulting in 15% cost savings
Redesigned production line layout resulting in 30% increase in efficiency
Implemented lean manufacturing principles resulting in 25% reduction in waste
Trained and mentored team members resulting...
based on 4 reviews
Rating in categories
Engineer
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
92
salaries
| ₹0 L/yr - ₹0 L/yr |
Service Engineer
56
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
37
salaries
| ₹0 L/yr - ₹0 L/yr |
ABB
Siemens
Alstom Transportation
BHEL