Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Patel Infrastructure Team. If you also belong to the team, you can get access from here

Patel Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Patel Infrastructure Deputy Manager Interview Questions and Answers for Experienced

Updated 12 Sep 2023

Patel Infrastructure Deputy Manager Interview Experiences for Experienced

1 interview found

I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Planning for execution and laying of bituminous
  • Ans. 

    Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.

    • Develop a detailed project plan outlining tasks, timelines, and resources required

    • Coordinate with suppliers for timely delivery of materials

    • Ensure proper equipment and manpower are available for the execution

    • Implement quality control measures to ensure the final product meets specifications

    • Regularly monitor p...

  • Answered by AI
  • Q2. About bituminous laying

Interview Preparation Tips

Interview preparation tips for other job seekers - Production and asphalt laying

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Jul 2024. There were 4 interview rounds.

Round 1 - Group Discussion 

Office work in team management

Round 2 - Assignment 

Me one company manager in all my team handling in company work

Round 3 - Assignment 

Meri company ko meri puri team ka sahoyg milta he

Round 4 - Technical 

(2 Questions)

  • Q1. What is technical problems in company
  • Ans. 

    Technical problems in a company can range from software bugs to hardware malfunctions.

    • Software bugs causing system crashes or errors

    • Hardware malfunctions leading to equipment failures

    • Network issues causing slow internet or connectivity problems

    • Outdated technology hindering productivity

    • Lack of IT support for troubleshooting and maintenance

  • Answered by AI
  • Q2. Kaya company me koyi aesa bhi problem ho skta he

Interview Preparation Tips

Interview preparation tips for other job seekers - Work mindsets creat in my work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Relavant question regarding Crushers

Interview Questionnaire 

4 Questions

  • Q1. About your self
  • Q2. About java
  • Q3. Phython
  • Q4. Project details

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong ont losse ur hope

I applied via Company Website and was interviewed in Aug 2020. There were 6 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Aptitude consist Logical very important and then few programming error find and then quantitative

Interview Preparation Tips

Interview preparation tips for other job seekers - For fresher company have very strict criteria 75% thought in education. They take all interview with their on software including Aptitude+ Realtime system test and PI in person. They offer good package for AI and ML rest will be selected into different team of development.

Interview Preparation Tips

Round: TECHNICAL ROUND TEST
Experience: A 45 mins round which consisted of 30 mins of core questions and 15 mins of data structures.  It was a mix of test on our knowledge .

Round: HR Interview
Experience: Most of the questions were based on general knowledge and many of them were from the resume provides by me

General Tips: It is always advisable to be prepared with certain set of general questions which make it easier to answer.
Skill Tips: Focus on your Study.. Revise the subject that you have studied at the time of Interview
Skills: Technical Skills
College Name: IIT MADRAS

Interview Preparation Tips

Round: Test
Experience: Questions were on Aptitude, English, Probability, Permutations andCombinations and Programming (C, C++). NO Group Discussion was held.Candidates were shortlisted on the basis of their test scores.

Round: Technical Interview
Experience: Total time of this round was 45 minutes.First 30 minutes, questions on core programming were asked and in the remaining 15 minutes questions were asked on data structures.

Round: HR Interview
Experience: This was a 5 minute round where questions were put up, some based on the resume and other were general questions.

Skills: Knowledge in MATLAB.
College Name: IIT MADRAS

I applied via Campus Placement and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Everything in your resume questions from your domain and 1 quizzes

Interview Preparation Tips

Interview preparation tips for other job seekers - Completely prepare your resume

I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What does BA will do
  • Ans. 

    A Business Analyst (BA) will analyze business processes, identify areas for improvement, and recommend solutions to enhance efficiency and productivity.

    • Analyze business processes

    • Identify areas for improvement

    • Recommend solutions to enhance efficiency and productivity

    • Collaborate with stakeholders to gather requirements

    • Create and maintain project documentation

    • Facilitate communication between technical and non-technical te

  • Answered by AI
  • Q2. What is analytics
  • Ans. 

    Analytics is the process of analyzing data to gain insights and make informed decisions.

    • Analytics involves collecting, processing, and interpreting data

    • It can be used in various fields such as business, healthcare, and sports

    • Examples of analytics tools include Google Analytics, Tableau, and SAS

    • Analytics can help identify patterns, trends, and opportunities for improvement

    • It can also be used for predictive modeling and

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Its verygood

Interview Questionnaire 

1 Question

  • Q1. Introduce yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't learn anything byheart before attending an interview

Patel Infrastructure Interview FAQs

How many rounds are there in Patel Infrastructure Deputy Manager interview for experienced candidates?
Patel Infrastructure interview process for experienced candidates usually has 2 rounds. The most common rounds in the Patel Infrastructure interview process for experienced candidates are Resume Shortlist and Technical.
How to prepare for Patel Infrastructure Deputy Manager interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Patel Infrastructure. The most common topics and skills that interviewers at Patel Infrastructure expect are IOSH, Civil Construction, EHS, Fire Safety and First Aid.
What are the top questions asked in Patel Infrastructure Deputy Manager interview for experienced candidates?

Some of the top questions asked at the Patel Infrastructure Deputy Manager interview for experienced candidates -

  1. Planning for execution and laying of bitumin...read more
  2. About bituminous lay...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

J&F Interview Questions
3.7
 • 30 Interviews
Eversendai Interview Questions
3.7
 • 28 Interviews
J K Fenner Interview Questions
3.9
 • 27 Interviews
View all
Patel Infrastructure Deputy Manager Salary
based on 5 salaries
₹5.4 L/yr - ₹12.6 L/yr
At par with the average Deputy Manager Salary in India
View more details

Patel Infrastructure Deputy Manager Reviews and Ratings

based on 5 reviews

3.4/5

Rating in categories

1.4

Skill development

3.4

Work-life balance

2.8

Salary

1.9

Job security

1.4

Company culture

2.4

Promotions

2.4

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Engineer
79 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Store Executive
61 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Structural Engineer
55 salaries
unlock blur

₹2.1 L/yr - ₹6.1 L/yr

Highway Engineer
44 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Safety Officer
43 salaries
unlock blur

₹2.2 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Patel Infrastructure with

CTS Consulting & Technical Support

3.7
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare

Bahwan Engineering

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview