Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Paras Buildtech Team. If you also belong to the team, you can get access from here

Paras Buildtech Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Paras Buildtech Interview Questions and Answers

Updated 4 Jun 2025
Popular Designations

8 Interview questions

A Legal Executive was asked 2w ago
Q. Which companies have you worked with previously?
Ans. 

I have worked with various companies, gaining diverse legal experience across multiple sectors.

  • Worked at XYZ Law Firm, specializing in corporate law and mergers.

  • Interned with ABC Corporation, focusing on compliance and regulatory issues.

  • Collaborated with DEF Non-Profit, providing legal support for community initiatives.

View all Legal Executive interview questions
A Shift Engineer was asked
Q. What is power factor, and what are the different types of power factor?
Ans. 

Power factor is the ratio of real power to apparent power. Types include leading, lagging, and unity power factor.

  • Power factor is a measure of how efficiently electrical power is being used.

  • It is calculated by dividing real power (measured in watts) by apparent power (measured in volt-amperes).

  • A power factor of 1 (or unity) means all the power is being used efficiently, while a power factor less than 1 means some ...

View all Shift Engineer interview questions
A Shift Engineer was asked
Q. What kind of coil is used in the ACB?
Ans. 

The type of coil used in an ACB (Air Circuit Breaker) varies depending on the specific model and manufacturer.

  • ACBs can use different types of coils such as electromagnetic coils or solid-state coils.

  • Electromagnetic coils use a magnetic field to generate the necessary force to open or close the circuit breaker.

  • Solid-state coils use electronic components to control the operation of the ACB.

  • The choice of coil depends...

View all Shift Engineer interview questions
A Shift Engineer was asked
Q. Dol starter control wirring diagram
Ans. 

A Dol starter control wiring diagram is a schematic representation of the electrical connections of a direct online starter.

  • The diagram typically includes a power supply, a contactor, an overload relay, and a start and stop button.

  • The power supply is connected to the contactor, which controls the flow of electricity to the motor.

  • The overload relay is used to protect the motor from damage due to overloading.

  • The sta...

View all Shift Engineer interview questions
A Maintenance Executive was asked
Q. Can you create facilities reports?
Ans. 

Facilities report banane ke liye data collection, analysis aur presentation ki zarurat hoti hai.

  • Data Collection: Maintenance activities, equipment status, and incident reports ko ikattha karna.

  • Analysis: Collected data ka analysis karna, jaise downtime aur repair frequency ka pata lagana.

  • Report Generation: Findings ko report format mein present karna, jisme graphs aur charts shamil ho sakte hain.

  • Example: Agar kisi ...

View all Maintenance Executive interview questions
A Maintenance Executive was asked
Q. Are you able to handle WTP and STP work?
Ans. 

WTP (Water Treatment Plant) and STP (Sewage Treatment Plant) are essential for managing water quality and environmental sustainability.

  • WTP purifies water for drinking and industrial use, ensuring it meets safety standards.

  • STP treats wastewater to remove contaminants before releasing it back into the environment.

  • Example of WTP: Reverse osmosis systems used in municipal water supply.

  • Example of STP: Activated sludge ...

View all Maintenance Executive interview questions
A Maintenance Executive was asked
Q. How do you ensure your team members complete their tasks?
Ans. 

Teamwork is essential for completing tasks efficiently and effectively, leveraging each member's strengths.

  • Clear communication: Regular meetings to discuss progress and challenges.

  • Role delegation: Assign tasks based on individual strengths, e.g., one member handles machinery while another manages inventory.

  • Support and collaboration: Encourage team members to assist each other, fostering a cooperative environment.

  • F...

View all Maintenance Executive interview questions
Are these interview questions helpful?
A Maintenance Executive was asked
Q. Are you able to address complaints?
Ans. 

Main complaints ko samajhne aur unhe suljhane ke liye proactive approach rakhta hoon, taaki maintenance process behtar ho sake.

  • Suno aur samjho: Pehle customer ki complaints ko dhyan se sunna zaroori hai, jaise kisi machine ki kharabi par unki baatein samajhna.

  • Analysis: Complaint ka mool karan samajhne ke liye data ka analysis karna, jaise kisi equipment ki regular maintenance records dekhna.

  • Timely Response: Compla...

View all Maintenance Executive interview questions

Paras Buildtech Interview Experiences

9 interviews found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What's kind of coil use in the ACB
  • Ans. 

    The type of coil used in an ACB (Air Circuit Breaker) varies depending on the specific model and manufacturer.

    • ACBs can use different types of coils such as electromagnetic coils or solid-state coils.

    • Electromagnetic coils use a magnetic field to generate the necessary force to open or close the circuit breaker.

    • Solid-state coils use electronic components to control the operation of the ACB.

    • The choice of coil depends on f...

  • Answered by AI
  • Q2. Star delta starter control dai gram
  • Q3. Dol starter control wirring diagram
  • Ans. 

    A Dol starter control wiring diagram is a schematic representation of the electrical connections of a direct online starter.

    • The diagram typically includes a power supply, a contactor, an overload relay, and a start and stop button.

    • The power supply is connected to the contactor, which controls the flow of electricity to the motor.

    • The overload relay is used to protect the motor from damage due to overloading.

    • The start an...

  • Answered by AI
  • Q4. What is powe factor and types of power fector
  • Ans. 

    Power factor is the ratio of real power to apparent power. Types include leading, lagging, and unity power factor.

    • Power factor is a measure of how efficiently electrical power is being used.

    • It is calculated by dividing real power (measured in watts) by apparent power (measured in volt-amperes).

    • A power factor of 1 (or unity) means all the power is being used efficiently, while a power factor less than 1 means some power...

  • Answered by AI
  • Q5. DG A, B, C, and D check

Interview Preparation Tips

Interview preparation tips for other job seekers - I hope all of you doing hardworking for our scope . All is well
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Jun 2024, where I was asked the following questions.

  • Q1. Basics of real estate laws
  • Q2. Companies worked with earlier
  • Ans. 

    I have worked with various companies, gaining diverse legal experience across multiple sectors.

    • Worked at XYZ Law Firm, specializing in corporate law and mergers.

    • Interned with ABC Corporation, focusing on compliance and regulatory issues.

    • Collaborated with DEF Non-Profit, providing legal support for community initiatives.

  • Answered by AI

Interview Questions & Answers

user image Frankline Himadri Sen

posted on 5 Jan 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There were 5 interview rounds.

Round 1 - Aptitude Test 

To text my IQ level over a situation

Round 2 - Assignment 

To submit a brief plan and strategy on retail leasing forecasting

Round 3 - Group Discussion 

To judge my Analytics .

Round 4 - Technical 

(1 Question)

  • Q1. To understand my technical knowledge on the subject of retail leasing as ROI
Round 5 - HR 

(1 Question)

  • Q1. About my ambition and vision for this role offered.

Interview Preparation Tips

Interview preparation tips for other job seekers - Excellent company to work
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Clint handling cleaning part security review maintenance team work review Work for office. Document Bisis computer and mail by all work report
  • Q2. Maintenance complaint
  • Q3. All maintenance work
  • Q4. WorkPPT report Daily report at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes

I applied via Company Website and was interviewed in Nov 2021. There was 1 interview round.

Interview Questionnaire 

20 Questions

  • Q1. Overall all report
  • Q2.  Kaya aap residential kaam kar lega
  • Q3.  Ji ha kar sakta hu
  • Q4. Kaya aap complaints iuss kar lo ga
  • Ans. 

    Main complaints ko samajhne aur unhe suljhane ke liye proactive approach rakhta hoon, taaki maintenance process behtar ho sake.

    • Suno aur samjho: Pehle customer ki complaints ko dhyan se sunna zaroori hai, jaise kisi machine ki kharabi par unki baatein samajhna.

    • Analysis: Complaint ka mool karan samajhne ke liye data ka analysis karna, jaise kisi equipment ki regular maintenance records dekhna.

    • Timely Response: Complaints ...

  • Answered by AI
  • Q5. Ji kara luga
  • Q6.  Civil work & plumbing and security & house keeping
  • Q7.  Ji ha kara luga
  • Q8. All team members Handel kar lea
  • Q9. Yes kara luga ma
  • Q10. Vander Handel kar lega
  • Q11. Ji pura kar sakta hu
  • Q12. Facilities report bana kar sakte hai
  • Ans. 

    Facilities report banane ke liye data collection, analysis aur presentation ki zarurat hoti hai.

    • Data Collection: Maintenance activities, equipment status, and incident reports ko ikattha karna.

    • Analysis: Collected data ka analysis karna, jaise downtime aur repair frequency ka pata lagana.

    • Report Generation: Findings ko report format mein present karna, jisme graphs aur charts shamil ho sakte hain.

    • Example: Agar kisi machi...

  • Answered by AI
  • Q13. Yes kar sakte hai
  • Q14.  Mis report bana lega
  • Q15. Yes bana lega
  • Q16. Monthly report collection report
  • Q17.  Yes kar sakta hoon
  • Q18.  Aap apne teem mamber ka sata kaam pura kar sate hai
  • Ans. 

    Teamwork is essential for completing tasks efficiently and effectively, leveraging each member's strengths.

    • Clear communication: Regular meetings to discuss progress and challenges.

    • Role delegation: Assign tasks based on individual strengths, e.g., one member handles machinery while another manages inventory.

    • Support and collaboration: Encourage team members to assist each other, fostering a cooperative environment.

    • Feedba...

  • Answered by AI
  • Q19.  Yes kara luga
  • Q20. WTP & STP work out kar lega
  • Ans. 

    WTP (Water Treatment Plant) and STP (Sewage Treatment Plant) are essential for managing water quality and environmental sustainability.

    • WTP purifies water for drinking and industrial use, ensuring it meets safety standards.

    • STP treats wastewater to remove contaminants before releasing it back into the environment.

    • Example of WTP: Reverse osmosis systems used in municipal water supply.

    • Example of STP: Activated sludge proce...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes kar sta hu

Interview Questionnaire 

2 Questions

  • Q1. Previous assignment
  • Q2. Previous Job Role

I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. The main question is that what are your goals in future. How to deal with problems.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please show your gesture not ability of you want to crack the interview. Every company wants your dedication as such this company too.

I applied via Naukri.com and was interviewed before Mar 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why are you looking for a change?
  • Q5. What are your strengths and weaknesses?
  • Q6. Tell me about yourself.
Round 3 - One-on-one 

(1 Question)

  • Q1. Related to resume and academic field.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and read properly your resume and well addressed in interview.

Junior its Engineer Interview Questions & Answers

user image Shobhit Baheti

posted on 31 Aug 2019

I applied via Naukri.com and was interviewed before Aug 2018. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical related site and terms
  • Q2. Regard8ng job and job security

Interview Preparation Tips

Interview preparation tips for other job seekers - Be, Confident, be specific like if you know answer confidently then only you give else say no idea

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Paras Buildtech?
Ask anonymously on communities.

Interview questions from similar companies

Interview Questionnaire 

4 Questions

  • Q1. Different between two Stok and four stok engine?
  • Ans. 

    Two-stroke engines have a power stroke every revolution, while four-stroke engines have a power stroke every other revolution.

    • Two-stroke engines have a simpler design and are lighter than four-stroke engines.

    • Two-stroke engines have a higher power-to-weight ratio than four-stroke engines.

    • Four-stroke engines are more fuel-efficient and have a longer lifespan than two-stroke engines.

    • Two-stroke engines are commonly used in...

  • Answered by AI
  • Q2. Batching plant pain mixture servicing?
  • Ans. 

    Batching plant pain mixture servicing refers to the maintenance and repair of the equipment used to mix concrete.

    • Regular cleaning and inspection of the batching plant equipment

    • Replacing worn out parts and repairing any damages

    • Ensuring proper calibration of the equipment for accurate mixing

    • Regular lubrication of moving parts to prevent wear and tear

    • Training staff on proper use and maintenance of the equipment

  • Answered by AI
  • Q3. Hydraulic function of Bp1800 concrete pump?
  • Ans. 

    Bp1800 concrete pump has a hydraulic function for efficient pumping of concrete.

    • The hydraulic system of Bp1800 concrete pump helps in generating the required pressure to pump concrete.

    • It consists of hydraulic cylinders, pumps, and motors that work together to move the concrete through the pipeline.

    • The hydraulic function also helps in controlling the speed and direction of the pump.

    • The hydraulic oil used in the system h...

  • Answered by AI
  • Q4. Tower crane support mechanic function?
  • Ans. 

    A tower crane support mechanic is responsible for maintaining and repairing the tower crane's support system.

    • Inspecting and maintaining the tower crane's support system

    • Repairing or replacing damaged or worn-out parts

    • Ensuring the tower crane is stable and secure

    • Working with other members of the construction team to ensure safety and efficiency

    • Using specialized tools and equipment to perform maintenance and repairs

    • Keepin...

  • Answered by AI

Paras Buildtech Interview FAQs

How many rounds are there in Paras Buildtech interview?
Paras Buildtech interview process usually has 3 rounds. The most common rounds in the Paras Buildtech interview process are Resume Shortlist, Technical and HR.
How to prepare for Paras Buildtech interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Paras Buildtech. The most common topics and skills that interviewers at Paras Buildtech expect are Category Management, Communication Skills, Sales, Sales Promotion and Bank Reconciliation.
What are the top questions asked in Paras Buildtech interview?

Some of the top questions asked at the Paras Buildtech interview -

  1. Aap apne teem mamber ka sata kaam pura kar sate h...read more
  2. What is powe factor and types of power fec...read more
  3. What's kind of coil use in the ...read more
What are the most common questions asked in Paras Buildtech HR round?

The most common HR questions asked in Paras Buildtech interview are -

  1. What are your strengths and weakness...read more
  2. Why are you looking for a chan...read more
  3. What are your salary expectatio...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3.8/5

based on 8 interview experiences

Difficulty level

Moderate 100%

Duration

2-4 weeks 100%
View more

Interview Questions from Similar Companies

DRA Homes Interview Questions
4.6
 • 23 Interviews
N.K. Realtors Interview Questions
4.2
 • 21 Interviews
JP Infra Interview Questions
3.7
 • 20 Interviews
DTC Projects Interview Questions
4.0
 • 19 Interviews
ATS Homekraft Interview Questions
4.2
 • 18 Interviews
PS Group Interview Questions
3.7
 • 18 Interviews
View all

Paras Buildtech Reviews and Ratings

based on 121 reviews

3.3/5

Rating in categories

3.1

Skill development

3.0

Work-life balance

3.3

Salary

2.8

Job security

3.0

Company culture

2.9

Promotions

3.0

Work satisfaction

Explore 121 Reviews and Ratings
Assistant Manager
25 salaries
unlock blur

₹4.2 L/yr - ₹9 L/yr

Assistant General Manager
14 salaries
unlock blur

₹10.2 L/yr - ₹22 L/yr

Billing Engineer
11 salaries
unlock blur

₹2.4 L/yr - ₹6.4 L/yr

Senior Executive
11 salaries
unlock blur

₹3.8 L/yr - ₹5.1 L/yr

Senior Executive - CRM
9 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Explore more salaries
Compare Paras Buildtech with

Realty Assistant

3.7
Compare

ORA Group

3.8
Compare

Kunal Structure

3.8
Compare

Mantra Properties

4.3
Compare
write
Share an Interview