Filter interviews by
Top trending discussions
posted on 19 Jul 2024
I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.
Gear box replacement work
posted on 5 Mar 2024
posted on 10 Feb 2024
Testing of Distribution Transformer involves various electrical and mechanical tests to ensure its performance and safety.
Electrical tests include turns ratio test, insulation resistance test, and short circuit test.
Mechanical tests include temperature rise test and vibration test.
Testing also involves checking the transformer's efficiency and power factor.
Visual inspection is done to check for any physical damages or ...
I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.
posted on 1 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
Transformer losses include copper losses and iron losses.
Copper losses are due to resistance in the transformer windings.
Iron losses include hysteresis losses and eddy current losses.
Total losses in a transformer are the sum of copper losses and iron losses.
To reduce count of burnt DTR, proper maintenance, regular inspections, and timely replacements are essential.
Regularly inspect DTRs for any signs of overheating or damage
Ensure proper ventilation and cooling systems are in place
Implement regular maintenance schedules for cleaning and testing
Replace old or faulty components before they cause damage
Train staff on proper handling and maintenance procedures
PPE stands for Personal Protective Equipment. Building a safety work culture involves training, communication, enforcement, and leading by example.
PPE includes items like helmets, gloves, goggles, and safety shoes to protect workers from hazards.
Conduct regular safety training sessions to educate employees on the importance of using PPE.
Communicate safety protocols clearly and consistently to all employees.
Enforce safe...
Voltage regulation is the process of maintaining a stable voltage level at the distribution level.
Voltage regulation is achieved by using transformers and voltage regulators to adjust the voltage as needed.
Voltage regulators can be either tap-changing transformers or electronic devices that adjust the voltage automatically.
By monitoring the voltage levels and making adjustments as necessary, the desired voltage is main...
I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
posted on 29 Sep 2022
I was interviewed before Sep 2021.
Yes, I am adaptable to West Bengal.
I have lived in different parts of India and have experience adapting to new cultures and environments.
I am willing to learn about the local customs and traditions of West Bengal.
I am excited about the opportunity to work in West Bengal and contribute to the development of the region.
I am open to exploring new places and trying new things, which will help me adapt to the local lifesty...
Interview experience
based on 2 reviews
Rating in categories
Senior Manager
131
salaries
| ₹20 L/yr - ₹56 L/yr |
Deputy General Manager
102
salaries
| ₹19 L/yr - ₹72.3 L/yr |
Manager
101
salaries
| ₹14.6 L/yr - ₹41 L/yr |
Executive
71
salaries
| ₹7.2 L/yr - ₹16.5 L/yr |
Engineer
67
salaries
| ₹5.6 L/yr - ₹15 L/yr |
Power Grid Corporation of India
BHEL
Tata Power
Adani Power