Upload Button Icon Add office photos

NTPC

Compare button icon Compare button icon Compare

Filter interviews by

NTPC Site Supervisor Interview Questions and Answers

Updated 24 Dec 2024

NTPC Site Supervisor Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Work experience 

(2 Questions)

  • Q1. How much do you have experience
  • Q2. Why we will hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Very well to don't be nervous

I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the difference between mounting and associries
  • Ans. 

    Mounting refers to the process of attaching or fixing something in a specific position, while accessories are additional items that enhance or complement the main object or system.

    • Mounting involves securing or affixing an object to a surface or structure.

    • Accessories are optional components that provide added functionality or aesthetic appeal.

    • Mounting is typically a permanent or semi-permanent attachment, while accessor...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This was a normal interview of 30 mint.from interview I am learn alot of new things....etc

Skills evaluated in this interview

Site Supervisor Interview Questions Asked at Other Companies

asked in Lodha Group
Q1. What are handover process to civil or facillities
Q2. What is coping and why it is provide,what is lap length and joggl ... read more
Q3. Before starting block work what tipe of preparation we have to do
Q4. Do you have medical certificate and Compantancy certificate? If n ... read more
Q5. What will you fix at the iointof rcc walls and blocks walls

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself",
  • Ans. 

    Experienced site supervisor with a background in construction management and a proven track record of successfully overseeing projects.

    • Over 5 years of experience in site supervision

    • Strong knowledge of construction processes and safety regulations

    • Effective communication skills with team members and clients

    • Managed multiple projects simultaneously, ensuring deadlines were met

    • Implemented cost-saving measures without compro

  • Answered by AI
  • Q2. Why do you want this job?
  • Ans. 

    I am passionate about leading teams and ensuring projects are completed successfully.

    • I have a strong background in construction and project management.

    • I enjoy the challenge of overseeing multiple tasks and problem-solving on site.

    • I am motivated by the opportunity to mentor and develop team members.

    • I thrive in fast-paced environments and am dedicated to delivering high-quality results.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. What are your strengths?
  • Ans. 

    My strengths include strong leadership skills, excellent communication abilities, and a proactive approach to problem-solving.

    • Strong leadership skills

    • Excellent communication abilities

    • Proactive approach to problem-solving

  • Answered by AI
  • Q2. What are your weaknesses?
  • Ans. 

    One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.

    • I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.

    • I have difficulty delegating tasks as I prefer to handle things on my own to ensure they are done correctly.

    • I can be overly self-critical, which can affect my confidence in certain situations.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Week in interview but Not For Work that's my Wiknase or Strength 👍
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.

Round 1 - Site condition and Static meter 

(2 Questions)

  • Q1. Smart meter and static meter or transformer
  • Q2. Shutdown process
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Solar project electrical work
  • Q2. Solar operation and maintenance work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Site supervisor 

(1 Question)

  • Q1. 1m3 witch cement bag use
  • Ans. 

    1m3 of concrete requires approximately 7-8 bags of cement.

    • 1m3 of concrete typically requires 7-8 bags of cement

    • The exact amount may vary based on the mix design and strength requirements

    • For example, for a standard mix of 1:2:4 (cement:sand:aggregate), 1m3 would require around 7 bags of cement

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Transmission line foundation work
Site safety control
Laber / contractor controlling
TBT tool box training
Round 1 - Technical 

(1 Question)

  • Q1. Solar electrical systems, HSSE all work safety, technical Trasfomer,33kv HT panal, systems communication Releted pyranometer abane temperature
  • Ans. Electrical equipment properly grounding all Electrical equipment and also modules to module & Pv area LA installation to connect all equipment rainy time no property loss and public safety. HSSE work all safety any electrical equipment PM/ New equipment installation LOTO parmit,site RISK ASSESSMENT, Hazard identify, Risk assessment as per site also all types parmit following
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Electrical & Safety
Round 3 - HR 

(1 Question)

  • Q1. Electrical & safety Releted

Interview Preparation Tips

Interview preparation tips for other job seekers - Make your work better and focus on work Pree planning team work & all work safety work,Team motivation work, best talkElectrical maintenance & Electrical equipment Replaced & insulation and solar project and electronics field
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Jun 2024.

Round 1 - Aptitude Test 

Freshers self confidence

Round 2 - Case Study 

After meeting than case study

Round 3 - HR 

(3 Questions)

  • Q1. Can you tell me and give me work as per your experience?
  • Q2. Am I eligible to work in your company?
  • Q3. You should give me work according to my qualification and ability.
Round 4 - HR 

(3 Questions)

  • Q1. Am I able to work?
  • Q2. I may get a chance to work.
  • Q3. According to you, I want to work in Adani Green Energy.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - HR 

(2 Questions)

  • Q1. What is Jsa & What is Hira.
  • Ans. 

    JSA stands for Job Safety Analysis, a process of identifying potential hazards in a job task. HIRA stands for Hazard Identification and Risk Assessment, a systematic approach to identifying and managing risks.

    • JSA involves breaking down a job task into steps, identifying potential hazards at each step, and implementing controls to mitigate the risks.

    • HIRA involves identifying hazards, assessing the associated risks, and ...

  • Answered by AI
  • Q2. What is UA/UC
  • Ans. 

    UA/UC stands for Unsafe Acts/Unsafe Conditions, which are factors contributing to accidents in the workplace.

    • UA refers to unsafe acts, which are actions or behaviors that increase the risk of accidents (e.g. not wearing proper PPE, horseplay)

    • UC refers to unsafe conditions, which are environmental factors that increase the risk of accidents (e.g. faulty equipment, poor lighting)

    • Identifying and addressing UA/UC is crucia...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview timing respect to all members.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Building line superwaiser
Round 3 - Technical 

(1 Question)

  • Q1. Kuch bhi puch sakte hai

Interview Preparation Tips

Interview preparation tips for other job seekers - Highlights unique elements of your personal brand

NTPC Interview FAQs

What are the top questions asked in NTPC Site Supervisor interview?

Some of the top questions asked at the NTPC Site Supervisor interview -

  1. What is the difference between mounting and associr...read more
  2. How much do you have experie...read more
  3. Why we will hire ...read more

Tell us how to improve this page.

NTPC Site Supervisor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 218 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
Torrent Power Interview Questions
3.7
 • 126 Interviews
Eaton Interview Questions
3.9
 • 119 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Vestas Interview Questions
4.3
 • 83 Interviews
GE Vernova Interview Questions
4.2
 • 83 Interviews
Hitachi Energy Interview Questions
4.1
 • 81 Interviews
View all
NTPC Site Supervisor Salary
based on 13 salaries
₹1.9 L/yr - ₹3.6 L/yr
At par with the average Site Supervisor Salary in India
View more details

NTPC Site Supervisor Reviews and Ratings

based on 6 reviews

4.7/5

Rating in categories

4.3

Skill development

4.8

Work-life balance

4.0

Salary

4.3

Job security

4.4

Company culture

3.9

Promotions

4.3

Work satisfaction

Explore 6 Reviews and Ratings
Senior Manager
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy General Manager
102 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
101 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive
72 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
68 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare NTPC with

Power Grid Corporation of India

4.4
Compare

BHEL

4.1
Compare

Tata Power

3.9
Compare

Adani Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview