Filter interviews by
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
Top trending discussions
posted on 29 Jul 2024
I applied via Job Portal and was interviewed before Jul 2023. There were 2 interview rounds.
Reasoning, maths and coding
posted on 30 Sep 2022
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
Finish items are the final touches in building construction that make it ready for occupancy.
Painting and finishing walls
Installing flooring and baseboards
Installing light fixtures and switches
Installing plumbing fixtures
Installing cabinetry and countertops
Landscaping and exterior finishing
posted on 19 Dec 2024
I was interviewed in Jan 2025.
Designing beams and columns involves determining the size, material, and layout to support the required loads.
Consider the type of structure and the loads it will bear
Calculate the required dimensions and reinforcement based on structural analysis
Select appropriate materials such as steel or concrete
Ensure proper connections and detailing for stability and safety
Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.
Limit state of serviceability ensures that a structure remains usable and safe for occupants.
It involves checking factors like deflection, vibration, cracking, and durability.
For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...
I was interviewed in Dec 2024.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
posted on 18 Oct 2024
I applied via Recruitment Consulltant
Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.
Establishing quality control procedures and protocols
Regular inspections and testing of materials and workmanship
Training and educating staff on quality standards
Implementing corrective actions when deviations are identified
Utilizing quality control tools such as checklists
BBS in code refers to Bar Bending Schedule as per Indian standards.
BBS stands for Bar Bending Schedule.
It is a detailed list of reinforcement bars to be used in a construction project.
It includes information on bar sizes, shapes, quantities, and placement.
BBS is prepared as per the requirements of Indian standards like IS 2502:1963.
It helps in ensuring proper reinforcement placement and quantity in the structure.
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.
Perform a slump test to determine the workability of the concrete mix.
Take samples from the mixed batch and cast test specimens for compressive strength testing.
Conduct compressive strength tests on the specimens to determine the grade of concrete.
Compare the test results with the standar
Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.
Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.
Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.
Site tests for cement include checking the color, sm...
Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.
Calculate the surface area of the wall by multiplying the height and length of each wall segment.
Determine the total surface area to be plastered by adding up the surface areas of all wall segments.
Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.
Consi...
Interview experience
based on 2 reviews
Rating in categories
Civil Site Engineer
64
salaries
| ₹1.3 L/yr - ₹5.4 L/yr |
Site Engineer
61
salaries
| ₹2 L/yr - ₹5 L/yr |
Billing Engineer
44
salaries
| ₹2.4 L/yr - ₹6.9 L/yr |
Senior Engineer
37
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Civil Engineer
36
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure