Filter interviews by
I applied via Company Website and was interviewed before Nov 2020. There were 2 interview rounds.
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
The question is about requirements for WPS PQR, piping, and tank RT.
WPS (Welding Procedure Specification) and PQR (Procedure Qualification Record) are required for welding processes.
Piping requirements include material selection, design, fabrication, installation, and testing.
Tank RT (Radiographic Testing) requirements involve inspecting welds and joints for defects using X-rays or gamma rays.
All of these requirements ...
posted on 2 Dec 2024
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 3 reviews
Rating in categories
Civil Site Engineer
68
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Site Engineer
59
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Billing Engineer
42
salaries
| ₹2.4 L/yr - ₹6.6 L/yr |
Senior Engineer
36
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Civil Engineer
36
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem