NKG Infrastructure Senior Engineer Construction Interview Questions and Answers

Updated 18 Mar 2021

NKG Infrastructure Senior Engineer Construction Interview Experiences

1 interview found

Interview Questionnaire 

5 Questions

  • Q1. About concrete , shutterig steel mainly
  • Q2. Height of pouring concrete
  • Ans. 

    The height of pouring concrete depends on various factors such as the type of structure, weather conditions, and equipment used.

    • The height of pouring concrete should not exceed 1.5 meters to avoid segregation and ensure proper compaction.

    • For high-rise buildings, concrete is poured in stages, with each stage being allowed to cure before the next one is poured.

    • The use of pumps and chutes can help to pour concrete at grea...

  • Answered by AI
  • Q3. Clement testing procedures
  • Q4. What is nondestructive testing
  • Ans. 

    Nondestructive testing is a method of testing materials without causing damage to the object being tested.

    • It is used to detect flaws or defects in materials or structures

    • Common methods include ultrasonic testing, radiography, and magnetic particle testing

    • It is often used in industries such as construction, aerospace, and manufacturing

    • Nondestructive testing can help ensure the safety and reliability of structures and pr

  • Answered by AI
  • Q5. Clement consumption in M30
  • Ans. 

    Cement consumption in M30 refers to the amount of cement used in the construction of M30 grade concrete.

    • Cement consumption in M30 depends on the mix design and the required strength of the concrete.

    • The cement content in M30 grade concrete is generally between 320 to 360 kg/m3.

    • Factors such as water-cement ratio, aggregate properties, and admixtures can also affect cement consumption.

    • Higher cement content may be required...

  • Answered by AI

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Solve the problem for miss leading maggy of its content why it was banned being truth...

Interview Preparation Tips

Round: Resume Shortlist
Experience: First they asked about me and my interest why do you want this job why we choose you else also are better than me ..
Tips: Be frank and intelligent....dont be nervous... answer the all your level what kind it may ...

Round: Case Study Interview
Experience: It may be in the market there are many types of products for same example fairness cream day by day new products are coming in the market claiming that they are best of all other products comparing.
.by this new one will try many strategy for his growth and fall of others...

College Name: Sln college of engineering hkes society yermarus camp

I was interviewed in Feb 2017.

Interview Questionnaire 

4 Questions

  • Q1. Questions related to structures
  • Q2. Questions related to Ground Improvement Techniques
  • Q3. Questions related to Strength of Material
  • Q4. Questions related to Construction Materials

Interview Preparation Tips

Round: Test
Experience: I was among the top ten students of my branch so it helped me a lot to gain confidence over things before the test.
The aptitude questions were average and so were the english ones.
Tips: Basic practice will go a long way in getting you through the tests. It helped me. It will help you too.
Duration: 45 minutes
Total Questions: 30

Round: Technical Interview
Experience: My all over knowledge was being checked. I got tensed when I couldn't answer one or two of the questions. But once I gained momentum, it helped me to answer the questions put up.
Tips: You have to study your core subjects very well. It's a core company and will only take you if you are in the top 30 students of your college and have good knowledge of civil engineering.

Skills: Technical Skill, Speaking Skills, Aptitude
College Name: VIT Vellore

I applied via Campus Placement and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Define Grade M25
  • Ans. 

    Grade M25 is a mix of concrete with a compressive strength of 25 megapascals after 28 days.

    • M25 is a standard mix of concrete used in construction.

    • It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.

    • It has a compressive strength of 25 MPa after 28 days of curing.

    • It is commonly used in the construction of buildings, bridges, and other structures.

    • M25 is suitable for moderate exposure conditions and c

  • Answered by AI
  • Q2. M25 is ratio used in RCC M stands for mix design 25 stands for it's strength 25Kn/sqm

Interview Preparation Tips

Interview preparation tips for other job seekers - M25 is the ratio used for RCC in which M stands for mix design and 25 means it's strength 25 Kn/sqm

I applied via Newspaper Ad and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

What You know
What you mentioned in resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't tell any false information.

I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Some equation of leveling or survey

Interview Preparation Tips

Interview preparation tips for other job seekers - Make connection with other to grow up. Finally change your company when you have enough experience. .

I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cement test ,initially setting time
  • Q2. Cube mould size
  • Ans. 

    Cube mould size is a standard size used for testing the compressive strength of concrete.

    • Cube moulds are typically made of steel or cast iron.

    • The standard size for cube moulds is 150mm x 150mm x 150mm.

    • Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.

    • The moulds are filled with concrete and left to cure before being tested for compressive strength.

    • Cube moulds are used to ensure that the c...

  • Answered by AI
  • Q3. 1m. 8mm Dia steel rod weight,how to calculate
  • Ans. 

    To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.

    • Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length

    • Find the density of steel, which is typically around 7850 kg/m^3

    • Multiply the volume by the density to get the weight of the rod

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical strong.This interview was both knowledge and communication between sub contractor and engineer. Most of the questions related to diploma circling.

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions .structure work
Related.like road bridge and building.

I applied via Company Website and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. PROJECT management

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Populations forcasting in detail

Round 3 - Aptitude Test 

Tipcall question mostly available to in ner

Interview Preparation Tips

Interview preparation tips for other job seekers - How to make bore of tube well without minimum funds and material ,tarnansport facility low labour cost how is possible in hilly aera

NKG Infrastructure Interview FAQs

What are the top questions asked in NKG Infrastructure Senior Engineer Construction interview?

Some of the top questions asked at the NKG Infrastructure Senior Engineer Construction interview -

  1. What is nondestructive test...read more
  2. Clement consumption in M...read more
  3. Height of pouring concr...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
AECOM Interview Questions
4.2
 • 115 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.1
 • 60 Interviews
View all
Site Engineer
63 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
62 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Billing Engineer
42 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
37 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare NKG Infrastructure with

Larsen & Toubro Limited

4.0