Filter interviews by
The height of pouring concrete depends on various factors such as the type of structure, weather conditions, and equipment used.
The height of pouring concrete should not exceed 1.5 meters to avoid segregation and ensure proper compaction.
For high-rise buildings, concrete is poured in stages, with each stage being allowed to cure before the next one is poured.
The use of pumps and chutes can help to pour concrete at grea...
Nondestructive testing is a method of testing materials without causing damage to the object being tested.
It is used to detect flaws or defects in materials or structures
Common methods include ultrasonic testing, radiography, and magnetic particle testing
It is often used in industries such as construction, aerospace, and manufacturing
Nondestructive testing can help ensure the safety and reliability of structures and pr
Cement consumption in M30 refers to the amount of cement used in the construction of M30 grade concrete.
Cement consumption in M30 depends on the mix design and the required strength of the concrete.
The cement content in M30 grade concrete is generally between 320 to 360 kg/m3.
Factors such as water-cement ratio, aggregate properties, and admixtures can also affect cement consumption.
Higher cement content may be required...
Top trending discussions
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
EVM stands for Earned Value Management. It is a project management technique used to track the performance and progress of a project.
EVM integrates project scope, schedule, and cost to provide a comprehensive view of project performance.
It helps in measuring project performance against the baseline plan and identifying variances.
Key EVM metrics include Planned Value (PV), Earned Value (EV), Actual Cost (AC), Cost Perfo...
I applied via Company Website and was interviewed in Mar 2023. There were 2 interview rounds.
Zone of Renar lap refers to the overlap zone in a column and beam connection.
Zone of Renar lap is the area where the column reinforcement bars overlap with the beam reinforcement bars.
It is important to ensure proper lap length and anchorage of the bars in this zone to maintain structural integrity.
The overlap length is typically specified in the structural design drawings.
Proper detailing and construction practices ar...
Maximum bending moment in a beam is the point where the beam experiences the highest amount of stress due to external loads.
Maximum bending moment occurs at the point where the shear force is zero.
It is important to calculate the maximum bending moment to ensure the beam can support the applied loads.
Example: In a simply supported beam with a point load at the center, the maximum bending moment will occur at the center
posted on 29 Nov 2023
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
The number of bricks required per cubic meter varies depending on the size and type of brick used.
The number of bricks required per cubic meter can range from 400 to 700 depending on the size and type of brick.
For example, standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.
Larger or smaller bricks will require more or fewer bricks per cubic meter respectively.
I applied via Approached by Company and was interviewed in Jan 2023. There were 3 interview rounds.
Through telephonic interview.
Yes Group discussion with Microsoft teams meeting
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.
I have experience working with minor irrigation systems, including design, installation, and maintenance.
Designed irrigation systems for small-scale agricultural projects
Installed drip irrigation systems for gardens and landscaping
Performed routine maintenance on irrigation pumps and pipes
Troubleshooted and repaired irrigation system malfunctions
posted on 30 Aug 2023
I applied via Naukri.com and was interviewed before Aug 2022. There were 4 interview rounds.
Job specific questions.
The load taken by a single weld tick depends on various factors such as the type of weld, material being welded, and welding technique.
The load taken by a single weld tick can vary depending on the type of weld being used (e.g. fillet weld, groove weld, plug weld).
The material being welded also plays a significant role in determining the load capacity of a single weld tick.
The welding technique and quality of the weld ...
posted on 8 May 2023
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
posted on 15 Jan 2021
I applied via Naukri.com and was interviewed before Jan 2020. There were 5 interview rounds.
The load taken by adjustable props for shuttering works depends on various factors.
The load capacity of adjustable props depends on their size and material.
The type of shuttering work being done also affects the load taken by adjustable props.
The load can vary from a few hundred kilograms to several tons.
Adjustable props are commonly used in construction to support formwork during concrete pouring.
The load taken by adj...
There are various types of shuttering methods used in construction, each with its own advantages.
Types of shuttering methods include timber, steel, aluminum, plastic, and fabric.
Timber shuttering is cost-effective and easy to work with, while steel shuttering is durable and reusable.
Aluminum shuttering is lightweight and easy to handle, while plastic shuttering is waterproof and easy to clean.
Fabric shuttering is flexi...
The methodology for finishing activities involves planning, coordination, and attention to detail.
Create a detailed schedule for finishing activities
Coordinate with subcontractors and suppliers to ensure timely delivery of materials
Ensure quality control measures are in place and followed
Conduct regular inspections to identify and address any issues
Communicate regularly with the project team to ensure everyone is on th...
Experienced construction professional with strong leadership and project management skills.
Over 5 years of experience in the construction industry.
Managed multiple construction projects from start to finish, ensuring timely completion and within budget.
Strong knowledge of construction methods, materials, and safety regulations.
Proven ability to lead and motivate teams to achieve project goals.
Excellent communication an...
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
EVM stands for Earned Value Management. It is a project management technique used to track the performance and progress of a project.
EVM integrates project scope, schedule, and cost to provide a comprehensive view of project performance.
It helps in measuring project performance against the baseline plan and identifying variances.
Key EVM metrics include Planned Value (PV), Earned Value (EV), Actual Cost (AC), Cost Perfo...
Civil Site Engineer
72
salaries
| ₹1.3 L/yr - ₹6 L/yr |
Site Engineer
62
salaries
| ₹2 L/yr - ₹5 L/yr |
Billing Engineer
46
salaries
| ₹2 L/yr - ₹6.9 L/yr |
Senior Engineer
37
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Civil Engineer
33
salaries
| ₹2.3 L/yr - ₹5.5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure