Filter interviews by
I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.
General introduction & work profile
Top trending discussions
posted on 10 Jul 2024
Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.
Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.
Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...
Aggregate and sand are materials commonly used in construction for creating concrete and mortar.
Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.
Sand is a granular material composed of finely divided rock and mineral particles.
Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.
Examples of aggregate include...
posted on 24 Aug 2024
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
The sequence of activities for aluminium (mivan) structure construction involves several steps.
Preparing the site and marking the layout
Constructing the foundation and footings
Erecting the aluminium formwork panels
Fixing reinforcement bars and embedment items
Pouring concrete into the formwork
Curing the concrete
Stripping the formwork
Finishing and cleaning the structure
The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.
Inspecting and correcting any defects or deficiencies
Installing finishes such as flooring, paint, and fixtures
Completing final electrical and plumbing work
Cleaning and tidying up the site
Obtaining necessary permits and certifications
Conducting final inspections
Handing over the comp
Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.
Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.
The test involves subjecting the waterproofing system to a specified water depth for a certain duration.
The duration of the test can vary depending on the project ...
The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.
The accepted rolling margin value can range from 2% to 5%.
It is important to consult project specifications and industry guidelines for the specific rolling margin value.
For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10...
The unit weight of steel refers to the weight of a given volume of steel material.
The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.
The specific unit weight of steel can vary depending on the type and grade of steel being used.
For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.
The unit weight of reinfo...
posted on 20 Oct 2024
I was interviewed before Oct 2023.
posted on 27 Nov 2023
I expect a competitive salary based on my experience and qualifications. As for the working period, I am open to discussing and negotiating the number of days.
I am looking for a salary that reflects my expertise and the responsibilities of the senior civil engineer role.
I am open to discussing the salary range during the interview process.
Regarding the working period, I am flexible and willing to negotiate the number o...
posted on 2 Jul 2023
I applied via Job Portal
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
I have worked on various civil engineering projects including construction of highways, bridges, and buildings.
Managed the construction of a 10 km highway project, ensuring timely completion and adherence to safety standards
Designed and supervised the construction of a 5-story commercial building, ensuring structural integrity and compliance with local regulations
Led a team of engineers in the construction of a pedestr...
Various tests are done on aggregates, including sieve analysis, specific gravity, and absorption.
Sieve analysis determines the particle size distribution of the aggregate.
Specific gravity test measures the density of the aggregate compared to water.
Absorption test determines the amount of water absorbed by the aggregate.
Other tests include soundness test, crushing value test, and impact value test.
The results of these ...
I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.
Cutting length of a beam is the total length of the beam including the extra length required for bending and overlapping reinforcement.
Cutting length is calculated by adding the clear span of the beam to the development length of the reinforcement on both sides.
Extra length is added for bending and overlapping reinforcement to ensure proper strength and stability.
Proper calculation of cutting length is crucial for the ...
Lapping zone in columns & beams refers to the overlapping area where two reinforcement bars are spliced together.
Lapping zone is typically located at the mid-height of the column or beam.
It is important to ensure proper lapping length and overlap to maintain structural integrity.
Lapping zone should be free from rust, oil, grease, or any other contaminants.
Proper anchorage length should be provided to prevent failure at...
posted on 19 Aug 2022
based on 1 interview
Interview experience
Civil Site Engineer
10
salaries
| ₹1.8 L/yr - ₹2.7 L/yr |
Civil Engineer
9
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Safety Officer
7
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Site Engineer
5
salaries
| ₹2.9 L/yr - ₹3.4 L/yr |
Project Coordinator
4
salaries
| ₹1.9 L/yr - ₹4 L/yr |
JLL
CBRE
NoBroker
Lodha Group