I applied via Company Website and was interviewed before Dec 2022. There was 1 interview round.
A construction joint is a planned break or gap in construction to allow for expansion, contraction, or movement of materials.
Construction joints are used in various types of structures, such as buildings, bridges, and roads.
They are typically created by leaving a gap between two sections of construction, which is later filled with a joint filler or sealant.
Construction joints help to prevent cracks and damage caused by...
Slump is a measure of consistency of concrete. It refers to the flowability of concrete.
Slump is determined by conducting a slump test on freshly mixed concrete.
It is measured in millimeters and indicates the workability of concrete.
Different types of slumps include true slump, shear slump, and collapse slump.
True slump occurs when concrete maintains a uniform shape after the slump test.
Shear slump indicates a lack of ...
Shear slump is a type of concrete slump that measures the consistency of concrete under shear stress.
Shear slump is a measure of the ability of concrete to resist deformation under shear forces.
It is determined by measuring the difference in height between the center of the concrete cone and the average of the four sides.
Shear slump is important in applications where concrete is subjected to shear forces, such as in be...
Concrete sampling is the process of collecting representative samples of concrete for testing and quality control purposes.
Concrete sampling is essential to ensure the strength and durability of the concrete.
Samples are typically taken from different locations and depths within the concrete batch.
Sampling methods include using a scoop, a sampling tube, or a core drill.
The number of samples required depends on the proje...
Formwork deshuttering time refers to the duration required for removing the formwork or shuttering from a concrete structure.
Formwork deshuttering time is the period after which the formwork can be safely removed without affecting the structural integrity of the concrete.
It depends on various factors such as the type of concrete, ambient temperature, humidity, and the strength development of the concrete.
The deshutteri...
I applied via Walk-in
Nagarjuna Construction Company interview questions for designations
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
M20 Grade concrete ratio is 1:1.5:3 (cement:sand:aggregate)
M20 Grade concrete has a ratio of 1:1.5:3 for cement:sand:aggregate
This means for every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used
The total proportion is 1:1.5:3 which is commonly used in construction projects
Plaster can be checked by examining its color, texture, hardness, and adhesion to the surface.
Check the color of the plaster for any discoloration or uneven patches.
Feel the texture of the plaster to ensure it is smooth and free of bumps or cracks.
Test the hardness of the plaster by gently tapping it with a tool or fingernail.
Check the adhesion of the plaster by trying to peel it off the surface.
To calculate the bar bending schedule (BBS) of a ring, you need to determine the diameter of the ring, the number of bars required, and the length of each bar.
Calculate the circumference of the ring using the formula 2 * π * r, where r is the radius of the ring.
Determine the spacing between the bars based on the design requirements and the diameter of the bars.
Calculate the total length of bars required by multiplying ...
Get interview-ready with Top Nagarjuna Construction Company Interview Questions
I applied via Walk-in
11 KV wires typically use aluminum or copper conductors.
Aluminum and copper are commonly used conductors for 11 KV wires.
Aluminum conductors are lighter and cheaper, but have lower conductivity compared to copper.
Copper conductors have higher conductivity and are more durable, but are heavier and more expensive.
The choice between aluminum and copper conductors depends on factors like cost, weight, and conductivity requ
The depth of a pole erection varies depending on the type of pole and the soil conditions.
The depth of a pole erection is typically determined by the height of the pole and the type of soil it is being installed in.
In general, a pole should be buried at least one-third of its total length for stability.
For example, a 12-foot pole should be buried at least 4 feet deep.
In rocky or sandy soil, poles may need to be buried ...
The ratio of pole grouting refers to the proportion of grout material used in relation to the size of the pole being grouted.
The ratio of pole grouting is typically expressed as a mix ratio of cement, sand, and water.
Common ratios for pole grouting include 1:2:3 (cement:sand:water) or 1:3 (cement:water).
The ratio may vary depending on the type of pole, soil conditions, and structural requirements.
Proper mixing and appl...
The ratio of pole grouting refers to the proportion of grout material used in relation to the size of the pole being grouted.
The ratio of pole grouting is typically expressed as a mix ratio of grout material to water or other additives.
For example, a common ratio for pole grouting could be 1:3, meaning 1 part grout material to 3 parts water.
The specific ratio used will depend on factors such as the type of pole, soil c
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Naukri.com
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
HVDS Scheme is a High Voltage Distribution System used for efficient power distribution. Time to complete 1 km site drawing varies based on complexity.
HVDS Scheme is a system for distributing electricity at higher voltages to reduce losses.
Time to complete 1 km site drawing in AutoCad depends on complexity, experience, and tools used.
For example, a simple site drawing may take a few hours, while a complex one may take
Power system parts of Erection include transformers, switchgear, cables, and busbars.
Transformers are used to step up or step down voltage levels in the power system.
Switchgear is used to control, protect, and isolate electrical equipment.
Cables are used to transmit electrical power from one point to another.
Busbars are used to distribute electrical power within a substation or switchyard.
Top trending discussions
2 Interview rounds
based on 292 reviews
Rating in categories
Junior Engineer
877
salaries
| ₹1.8 L/yr - ₹5.8 L/yr |
Assistant Engineer
790
salaries
| ₹3 L/yr - ₹9 L/yr |
Junior Engineer Civil
459
salaries
| ₹1.8 L/yr - ₹6.5 L/yr |
Senior Engineer
359
salaries
| ₹4 L/yr - ₹11 L/yr |
Civil Site Engineer
257
salaries
| ₹1.9 L/yr - ₹7 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys