HVDS Scheme is a High Voltage Distribution System used for efficient power distribution. Time to complete 1 km site drawing varies based on complexity.
HVDS Scheme is a system for distributing electricity at higher voltages to reduce losses.
Time to complete 1 km site drawing in AutoCad depends on complexity, experience, and tools used.
For example, a simple site drawing may take a few hours, while a complex one may take
Power system parts of Erection include transformers, switchgear, cables, and busbars.
Transformers are used to step up or step down voltage levels in the power system.
Switchgear is used to control, protect, and isolate electrical equipment.
Cables are used to transmit electrical power from one point to another.
Busbars are used to distribute electrical power within a substation or switchyard.
I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Nov 2022. There were 2 interview rounds.
Nagarjuna Construction Company interview questions for designations
I applied via Walk-in and was interviewed before Jul 2023. There were 2 interview rounds.
Get interview-ready with Top Nagarjuna Construction Company Interview Questions
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
Generally, aggregates ranging from 3/8 inch to 1.5 inches are used in PCC.
Aggregates used in PCC typically range from 3/8 inch to 1.5 inches in size.
The size of aggregates used in PCC depends on the specific requirements of the project.
Smaller aggregates are usually preferred for smoother finishes, while larger aggregates may be used for increased strength.
For example, a common aggregate size used in PCC is 3/4 inch.
The size of plywood board used in centring varies depending on the specific project requirements.
The size of plywood board used in centring can range from 4 feet by 8 feet to 4 feet by 10 feet.
Thicker plywood boards are typically used for heavier loads or taller structures.
Plywood boards are commonly used in construction for formwork and temporary support structures.
The size of plywood board used in centring is determi...
The length of props used in staging varies depending on the specific requirements of the production.
The length of props can range from a few inches to several feet, depending on the size of the stage and the needs of the performance.
Props used in staging can include furniture, small handheld items, and larger set pieces.
The length of props is determined by the director and set designer during the planning stages of the
Unit weight of different diameters of steel bars
Unit weight of steel = D^2/162.2 kg/m, where D is the diameter of the steel bar in mm
Calculate unit weight for each diameter provided in the question
32mm dia steel: 32^2/162.2 = 6.31 kg/m
25mm dia steel: 25^2/162.2 = 3.85 kg/m
20mm dia steel: 20^2/162.2 = 2.47 kg/m
16mm dia steel: 16^2/162.2 = 1.57 kg/m
10mm dia steel: 10^2/162.2 = 0.62 kg/m
08mm dia steel: 08^2/162.2 = 0.39 k
The unit of sand is typically measured in cubic meters or cubic feet.
The unit of sand is commonly measured in cubic meters (m³) or cubic feet (ft³).
Other units like kilograms (kg) or tons (metric or imperial) can also be used depending on the context.
For example, a construction project may require a certain amount of sand in cubic meters for concrete mixing.
Unit weight of 20mm aggregate is typically around 1550 kg/m^3.
Unit weight of 20mm aggregate is usually around 1550 kg/m^3.
It can vary slightly depending on the specific gravity of the aggregate material.
Unit weight is important in determining the amount of material needed for a project.
For example, if the specific gravity of the aggregate is 2.7, then the unit weight would be 1620 kg/m^3.
Unit weight of 10mm aggregate is typically around 1600 kg/m^3.
Unit weight of 10mm aggregate is usually around 1600 kg/m^3.
It can vary slightly depending on the specific gravity of the aggregate material.
Unit weight is important in determining the quantity of aggregate needed for a project.
I applied via Company Website and was interviewed before Dec 2022. There was 1 interview round.
A construction joint is a planned break or gap in construction to allow for expansion, contraction, or movement of materials.
Construction joints are used in various types of structures, such as buildings, bridges, and roads.
They are typically created by leaving a gap between two sections of construction, which is later filled with a joint filler or sealant.
Construction joints help to prevent cracks and damage caused by...
Slump is a measure of consistency of concrete. It refers to the flowability of concrete.
Slump is determined by conducting a slump test on freshly mixed concrete.
It is measured in millimeters and indicates the workability of concrete.
Different types of slumps include true slump, shear slump, and collapse slump.
True slump occurs when concrete maintains a uniform shape after the slump test.
Shear slump indicates a lack of ...
Shear slump is a type of concrete slump that measures the consistency of concrete under shear stress.
Shear slump is a measure of the ability of concrete to resist deformation under shear forces.
It is determined by measuring the difference in height between the center of the concrete cone and the average of the four sides.
Shear slump is important in applications where concrete is subjected to shear forces, such as in be...
Concrete sampling is the process of collecting representative samples of concrete for testing and quality control purposes.
Concrete sampling is essential to ensure the strength and durability of the concrete.
Samples are typically taken from different locations and depths within the concrete batch.
Sampling methods include using a scoop, a sampling tube, or a core drill.
The number of samples required depends on the proje...
Formwork deshuttering time refers to the duration required for removing the formwork or shuttering from a concrete structure.
Formwork deshuttering time is the period after which the formwork can be safely removed without affecting the structural integrity of the concrete.
It depends on various factors such as the type of concrete, ambient temperature, humidity, and the strength development of the concrete.
The deshutteri...
I applied via Referral and was interviewed before Jul 2022. There were 4 interview rounds.
General knowledge and others news updates about daily life.
I applied via Campus Placement and was interviewed before Oct 2022. There were 2 interview rounds.
Some of the top questions asked at the Nagarjuna Construction Company Junior Engineer interview -
The duration of Nagarjuna Construction Company Junior Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 34 interviews
2 Interview rounds
based on 323 reviews
Rating in categories
Junior Engineer
908
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
631
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Junior Engineer Civil
418
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
392
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Assistant Engineer - Civil
292
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |