I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
Interpreting contract documents involves analyzing terms and conditions to determine cost implications.
Reviewing the scope of work outlined in the contract
Identifying all cost components such as materials, labor, equipment, and overhead
Analyzing payment terms and schedules to determine cash flow
Understanding any penalties or incentives related to project completion
Considering potential risks and contingencies that may ...
Rate analysis involves calculating the rates of various items in a construction project to determine the overall cost.
Gather detailed information on the quantities and specifications of materials, labor, and equipment required for the project.
Determine the unit rates for each item by considering factors such as market prices, labor costs, and equipment rental rates.
Calculate the total cost of each item by multiplying t...
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
posted on 1 Jun 2021
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
Junior Engineer
911
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
635
salaries
| ₹3.1 L/yr - ₹9 L/yr |
Junior Engineer Civil
368
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
296
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Assistant Engineer - Civil
292
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Kalpataru Projects International