Upload Button Icon Add office photos

Filter interviews by

Narula Infrastructure Interview Questions, Process, and Tips

Updated 21 Nov 2024

Top Narula Infrastructure Interview Questions and Answers

View all 7 questions

Narula Infrastructure Interview Experiences

Popular Designations

14 interviews found

Utility Supervisor Reliance Jio Saharsa JC (CMP Bhagalpur) Interview Questions & Answers

user image Anonymous

posted on 3 Sep 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. About yourself, in shrot words.
  • Q2. What about your telecom sector experience
  • Ans. 

    I have over 5 years of experience in the telecom sector, working in various roles such as network engineer and project manager.

    • Worked as a network engineer at Vodafone for 3 years

    • Managed projects related to network expansion and optimization

    • Familiar with telecom technologies such as 4G LTE and fiber optics

    • Led a team of technicians in implementing new network infrastructure

  • Answered by AI
  • Q3. You have Teem handling knowledge
Round 2 - HR 

(2 Questions)

  • Q1. About your self?
  • Q2. About your experience, in telecom sector

Splicer Interview Questions & Answers

user image Anonymous

posted on 18 Nov 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. What is type of cable
  • Ans. 

    The type of cable refers to the specific design and construction of the cable, which determines its intended use and capabilities.

    • Types of cables include coaxial, twisted pair, fiber optic, and USB cables.

    • Coaxial cables are commonly used for cable television and internet connections.

    • Twisted pair cables are often used for Ethernet networks.

    • Fiber optic cables are used for high-speed data transmission over long distances.

    • ...

  • Answered by AI
  • Q2. 96 cable me kitane tube hote hai
  • Ans. 

    96 cable me four tube hota hai

  • Answered Anonymously
  • Q3. 288 cable me kitne tube hote hai
  • Q4. 96 cable me ak tube me kitne ribbon hote hai
  • Ans. 

    96 Cable me ak tubeThree ribbon hota hai

  • Answered Anonymously
  • Q5. 1Km cable me kitne kitne db ka lass hota hai
  • Ans. 

    1km cable me 0.2db loss hota hai

  • Answered Anonymously

Splicer Interview Questions asked at other Companies

Q1. What's the FTTH FIBER TO THE HOME
View answer (1)

HSEF Lead Interview Questions & Answers

user image SANTONU KACHARI

posted on 9 Mar 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Electrical Safety
  • Q2. Work at height condition
  • Q3. PPE Checking of any Damages
  • Q4. Relation between PTW and TBT
  • Q5. Why accident reporting is need
  • Q6. Best practices for safe working culture

Asset Project Manger Interview Questions & Answers

user image Anonymous

posted on 25 Sep 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Management Questions
  • Q2. Base on project deployment & rollout

Narula Infrastructure interview questions for popular designations

 Assistant Manager HRD

 (1)

 Assistant Technician

 (1)

 Fiber Engineer

 (1)

 Fiber Maintenance Engineer

 (1)

 Fttx Network Engineer

 (1)

 Project Lead

 (1)

 Senior Accountant

 (1)

 Splicer

 (1)

Project Lead Interview Questions & Answers

user image Anonymous

posted on 24 Apr 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Project Technical specifications

Round 2 - HR 

(2 Questions)

  • Q1. Tell me about Yourself
  • Ans. Thank you for allowing me to introduce myself. My self Babji I am from Puducherry. I completed my Masters in Wireless communications from Pondicherry University
  • Answered Anonymously
  • Q2. Salary Negotiations

Interview Preparation Tips

Topics to prepare for Narula Infrastructure Project Lead interview:
  • Fiber planning
  • Execution
  • Project Management
  • Profit & Loss
Interview preparation tips for other job seekers - Build connections with people who can help you find the career you are looking

Project Lead Interview Questions asked at other Companies

Q1. PowerBuilder 1. How to build app in one click? 2. How to read data from web page? 3. Have you used any PDF tools 4. How to save data from datawindow to XML 5. How to read mail from Outlook 6. How you migrate to new version.net SQL 1. Perfor... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 1.Dg related question 2.PIU, LCU, AC, SMPS related questions 3.Field management related questions. 4.Onwer capture related issues. 5. KPI'S And Uptime related questions.

Utility Supervisor Interview Questions asked at other Companies

Q1. How can you decrease outages on which is coming on daily basis
View answer (2)

Jobs at Narula Infrastructure

View all

Fiber Engineer Interview Questions & Answers

user image Raghuveer Sain

posted on 18 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(1 Question)

  • Q1. What know about ofc roll out project
  • Ans. 

    OFC roll out project involves planning, designing, and implementing optical fiber networks for improved connectivity.

    • Planning the route for laying optical fiber cables

    • Designing the network layout to ensure efficient connectivity

    • Implementing the project by laying cables and setting up necessary infrastructure

    • Testing and optimizing the network for performance

    • Maintenance and troubleshooting of the optical fiber network

    • Exa...

  • Answered by AI

Fiber Engineer Interview Questions asked at other Companies

Q1. What are the Losses in fiber Transmission ? which are the major fiber optic tools and their operation?
View answer (7)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Past/Present Job Details
  • Q2. Reason behind leave & Basic details.
Round 3 - Technical 

(1 Question)

  • Q1. Detail about technical knowledge
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation & job detail.

Assistant Manager HRD Interview Questions asked at other Companies

Q1. Best performance of the target to achieve the best performance 👍
View answer (2)

Senior Accountant Interview Questions & Answers

user image SNEHASISH DEY

posted on 25 Oct 2024

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Basic knowledge
Round 2 - One-on-one 

(1 Question)

  • Q1. Salary expectations

Senior Accountant Interview Questions asked at other Companies

Q1. Tell me about your self tax,
View answer (22)

Technician Interview Questions & Answers

user image Anonymous

posted on 11 Nov 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Bio data related 

(2 Questions)

  • Q1. Study which standerd
  • Q2. Your qualification

Technician Interview Questions asked at other Companies

Q1. What kinds of pipe used for hot and cold water supply ?
View answer (8)

Narula Infrastructure Interview FAQs

How many rounds are there in Narula Infrastructure interview?
Narula Infrastructure interview process usually has 1-2 rounds. The most common rounds in the Narula Infrastructure interview process are HR, Technical and Resume Shortlist.
How to prepare for Narula Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Narula Infrastructure. The most common topics and skills that interviewers at Narula Infrastructure expect are Biochemistry, Customer Management, Fiber, Finance and Accounts and Financial Accounting.
What are the top questions asked in Narula Infrastructure interview?

Some of the top questions asked at the Narula Infrastructure interview -

  1. What know about ofc roll out proj...read more
  2. Best practices for safe working cult...read more
  3. Why accident reporting is n...read more
How long is the Narula Infrastructure interview process?

The duration of Narula Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Narula Infrastructure Interview Process

based on 10 interviews in last 1 year

Interview experience

4.4
  
Good
View more

People are getting interviews through

based on 12 Narula Infrastructure interviews
Referral
WalkIn
Job Portal
Recruitment Consultant
33%
17%
17%
8%
25% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 399 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 64 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.4
 • 18 Interviews
View all

Narula Infrastructure Reviews and Ratings

based on 208 reviews

4.0/5

Rating in categories

3.7

Skill development

3.7

Work-Life balance

3.7

Salary & Benefits

3.6

Job Security

3.6

Company culture

3.3

Promotions/Appraisal

3.7

Work Satisfaction

Explore 208 Reviews and Ratings
ROW Lead

Indore

8-13 Yrs

₹ 5-9 LPA

Finance Executive

Kolkata

2-5 Yrs

₹ 2.5-4 LPA

Manager SCM 1 For Kolkata & 1 For Hyderabad / Bangalore

Kolkata,

Hyderabad / Secunderabad

+1

10-16 Yrs

Not Disclosed

Explore more jobs
Fttx Engineer
24 salaries
unlock blur

₹3.2 L/yr - ₹5.1 L/yr

Omcr Executive
20 salaries
unlock blur

₹1.6 L/yr - ₹3 L/yr

ISP Engineer
16 salaries
unlock blur

₹2.8 L/yr - ₹4.6 L/yr

MIS Coordinator
12 salaries
unlock blur

₹2 L/yr - ₹3.5 L/yr

Technician
10 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Explore more salaries
Compare Narula Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview