Filter interviews by
I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.
Project Technical specifications
Top trending discussions
posted on 5 Feb 2021
ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.
ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.
The organization also offers research and assessment services for educational institutions.
ETS uses computer-based testing and scoring for many of its exams.
The organization has faced criticism for its role in the standardized testing in
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.
Class type 22 refers to a specific category or classification within a system or framework.
Class type 22 may refer to a specific type of product or service offered by a company.
It could also be a classification used in a particular industry or field.
In some cases, class type 22 may be a code or identifier used for organizational purposes.
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jun 2023. There were 4 interview rounds.
Reconciliation accounts are maintained to ensure accuracy and consistency in financial records.
Helps in identifying discrepancies between different accounts
Ensures accuracy and consistency in financial statements
Facilitates easy tracking of transactions and balances
Aids in detecting errors or fraud in accounting records
Company code level is maintained for global settings applicable to all clients, while client level is maintained for specific settings unique to each client.
Company code level settings include currency, chart of accounts, and fiscal year variants.
Client level settings include customer master data, vendor master data, and sales organization data.
Blueprint phases include planning, designing, and implementation. Tables are used to organize data in a structured format.
Blueprint phases: planning, designing, implementation
Tables: organize data in structured format
Examples: creating a blueprint for a new building, using tables in a database to store information
Bank reconciliation involves comparing the bank statement with the company's records to ensure they match, while validations involve verifying the accuracy and completeness of financial transactions.
Bank reconciliation ensures that the company's records match the bank statement by comparing deposits, withdrawals, and other transactions.
Validations involve verifying the accuracy and completeness of financial transaction...
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 2 interview rounds.
Project life cycle can be managed by following a structured approach that includes planning, execution, monitoring, and closure.
Define project scope, objectives, and deliverables
Create a project plan with timelines, milestones, and resources
Execute the plan and monitor progress regularly
Identify and manage risks, issues, and changes
Close the project by delivering the final product and conducting a post-project review
Managing client relationships involves effective communication, understanding their needs, and delivering quality service.
Establish clear communication channels and respond promptly to their queries
Understand their needs and expectations and tailor your services accordingly
Deliver quality service and exceed their expectations
Maintain transparency and honesty in all dealings
Regularly seek feedback and take corrective ac...
I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.
posted on 6 Jul 2023
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
Fttx Engineer
24
salaries
| ₹3.2 L/yr - ₹5.1 L/yr |
Omcr Executive
20
salaries
| ₹1.6 L/yr - ₹3 L/yr |
ISP Engineer
16
salaries
| ₹2.8 L/yr - ₹4.6 L/yr |
MIS Coordinator
14
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Material Coordinator
10
salaries
| ₹2.7 L/yr - ₹4.7 L/yr |
Tata Projects
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International