Upload Button Icon Add office photos

Filter interviews by

My Home Constructions Interview Questions, Process, and Tips for Experienced

Updated 21 Dec 2024

Top My Home Constructions Interview Questions and Answers for Experienced

View all 18 questions

My Home Constructions Interview Experiences for Experienced

Popular Designations

13 interviews found

Senior Manager Interview Questions & Answers

user image J.MURALIKRISHNA

posted on 23 Jul 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Explain Quality control process
  • Ans. 

    Quality control process involves monitoring and maintaining the quality of products or services to ensure they meet standards.

    • Setting quality standards and specifications

    • Inspecting and testing products or services

    • Identifying defects or deviations from standards

    • Taking corrective actions to address issues

    • Continuous monitoring and improvement

  • Answered by AI
  • Q2. Aluminium formwork advantages and disadvantages
  • Ans. 

    Aluminium formwork is a construction technique using lightweight aluminum panels for faster and efficient building construction.

    • Advantages: faster construction time, reusable, high quality finish, cost-effective in long run

    • Disadvantages: initial high cost, requires skilled labor, limited flexibility in design compared to traditional formwork methods

  • Answered by AI
  • Q3. Safety PPE and how to measure the near missing
  • Ans. 

    Safety PPE is essential for protecting workers from hazards. Near misses can be measured through incident reports, observations, and safety audits.

    • Regularly conduct safety audits to identify any near misses related to PPE usage

    • Encourage workers to report any incidents or near misses involving PPE

    • Analyze trends in near misses to identify areas for improvement in PPE protocols

    • Provide training on proper PPE usage to preve...

  • Answered by AI
  • Q4. How to develop the team building
Round 2 - Technical 

(4 Questions)

  • Q1. Any observation about the concrete core sample temperature
  • Ans. 

    The temperature of concrete core samples can provide valuable insights into the curing process and potential strength of the concrete.

    • Concrete core sample temperature should be monitored regularly during the curing process to ensure proper strength development.

    • Higher core sample temperatures may indicate faster curing, but could also lead to potential cracking if not controlled.

    • Lower core sample temperatures may indica...

  • Answered by AI
  • Q2. Concrete exothermic reaction
  • Q3. Concrete strength on cube samples discarding what basis
  • Ans. 

    Concrete strength on cube samples is determined by testing the cubes under specific conditions.

    • Concrete strength on cube samples is determined through compression testing.

    • The cubes are typically made from the same batch of concrete used in the construction project.

    • The cubes are cured under specific conditions, usually in a lab environment, before testing.

    • The results of the cube tests are used to estimate the strength o...

  • Answered by AI
  • Q4. PU Waterproofing Crack bridging
Round 3 - HR 

(2 Questions)

  • Q1. Frequently changing the jobs why
  • Q2. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - The technical team will always ask the questions based on your previous experience projects

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

MEP JE Interview Questions & Answers

user image Anonymous

posted on 1 Dec 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Fire pump room, electrical slab conducting, wiring, load calculation etc.
  • Q2. Flat internal plumbing, irrigation system.

Interview Preparation Tips

Interview preparation tips for other job seekers - No need
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to check raft reinforcement and wall shuttering
  • Ans. 

    To check raft reinforcement and wall shuttering, visual inspection and measurements are key.

    • Inspect the alignment and spacing of reinforcement bars in the raft foundation.

    • Check for proper cover of concrete over the reinforcement bars.

    • Ensure that the wall shuttering is properly aligned and secured before pouring concrete.

    • Measure the dimensions of the raft foundation and wall shuttering to confirm they meet the design sp

  • Answered by AI
  • Q2. How to check concrete
  • Ans. 

    To check concrete, perform tests like slump test, compressive strength test, and soundness test.

    • Perform a slump test to check the workability of concrete.

    • Conduct a compressive strength test to determine the strength of concrete.

    • Check the soundness of concrete by performing a soundness test.

    • Inspect the appearance and consistency of the concrete mix.

    • Ensure proper curing of the concrete to prevent cracks and ensure durabi

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - During the interview be always confident

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Safety assessment

Deputy Manager HSE Interview Questions asked at other Companies

Q1. How do you manage unsafe behaviour
View answer (1)

My Home Constructions interview questions for popular designations

 Diploma Electrical Engineer

 (2)

 Security Officer

 (2)

 Assistant Manager

 (1)

 Assistant Planning Engineer

 (1)

 Billing and Planning Manager

 (1)

 Civil Site Engineer

 (1)

 Deputy Manager HSE

 (1)

 Graduate Trainee

 (1)

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. High rise building construction works safety
  • Ans. Creat awareness and use safety tools
  • Answered Anonymously
  • Q2. What is the safety
  • Ans. 

    Safety is the state of being protected from harm or danger.

    • Safety involves implementing measures to prevent accidents and injuries.

    • It includes following safety protocols and guidelines in the workplace.

    • Regular safety inspections and training are essential to maintain a safe environment.

    • Examples: wearing personal protective equipment, using safety harnesses, following proper lifting techniques.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Online

Senior Officer Interview Questions asked at other Companies

Q1. How you can Increase Selling of Banks Products and how you can connect more and more persons With Bank.????
View answer (6)

Get interview-ready with Top My Home Constructions Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to manage a site explain
  • Ans. 

    Managing a site involves coordinating resources, ensuring safety, and overseeing project progress.

    • Coordinate with various stakeholders, such as contractors, suppliers, and clients.

    • Create a detailed project plan, including timelines, budgets, and resource allocation.

    • Ensure compliance with safety regulations and implement necessary precautions.

    • Monitor and track project progress, identifying and resolving any issues or de...

  • Answered by AI
  • Q2. What are the wark a supervisor
  • Ans. 

    A supervisor in the field of electrical engineering is responsible for overseeing and managing the work of a team or department.

    • Supervising and coordinating the activities of electrical engineers and technicians

    • Planning and organizing work schedules and assignments

    • Ensuring compliance with safety regulations and quality standards

    • Providing technical guidance and support to team members

    • Monitoring progress and performance ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Every one shortlist before preparing very well ❤️‍🩹

Diploma Electrical Engineer Interview Questions asked at other Companies

Q1. What is the use of star delta connection in electrical ?
View answer (3)

Jobs at My Home Constructions

View all

Security Officer Interview Questions & Answers

user image Appalaraju R

posted on 21 Dec 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Why are leave the previous company
  • Q2. What are you expecting salery

Security Officer Interview Questions asked at other Companies

Q1. What deference between material handling and man handling
View answer (23)

SENIOR ENGINEER -CIVIL FINISHINGS Interview Questions & Answers

user image Anonymous

posted on 9 Oct 2021

I applied via Naukri.com and was interviewed in Sep 2021. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. All technical and store experience questions they I'll ask
  • Q2. Water proofing sequence
  • Q3. Tiles variation
  • Q4. Sequence of finishing works
  • Q5. How to handover flats to customers
  • Q6. Which doing work what type of precautions u I'll take for quality of work

Interview Preparation Tips

Interview preparation tips for other job seekers - Very happy to share my knowledge
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is you qualification
  • Q2. What is your projects
  • Q3. What is concrete used in pcc
  • Ans. 

    Concrete is used in PCC (Plain Cement Concrete) as a base material for constructing floors, foundations, and pavements.

    • Concrete in PCC is typically made of cement, sand, and coarse aggregates mixed in a specific ratio.

    • It is used as a base material for constructing floors, foundations, and pavements in buildings and infrastructure projects.

    • PCC provides a smooth and level surface for further construction work to be carri...

  • Answered by AI

Graduate Trainee Interview Questions asked at other Companies

Q1. Given an array, how do you get the count of pairs that sum to even
View answer (8)
Round 1 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Where do you see yourself in 5 years?
  • Q4. Tell me about yourself.
Round 2 - Case Study 

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing hard

Security Officer Interview Questions asked at other Companies

Q1. What deference between material handling and man handling
View answer (23)

My Home Constructions Interview FAQs

How many rounds are there in My Home Constructions interview for experienced candidates?
My Home Constructions interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the My Home Constructions interview process for experienced candidates are Technical, Resume Shortlist and HR.
How to prepare for My Home Constructions interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at My Home Constructions. The most common topics and skills that interviewers at My Home Constructions expect are Residential, AutoCAD, High Rise Building, CRM and MS Office.
What are the top questions asked in My Home Constructions interview for experienced candidates?

Some of the top questions asked at the My Home Constructions interview for experienced candidates -

  1. Do you have knowledge about concrete and plant maintena...read more
  2. Do you have knowledge about RMC batching pl...read more
  3. Do you have knowledge in ...read more

Tell us how to improve this page.

My Home Constructions Interview Process for Experienced

based on 3 interviews in last 1 year

Interview experience

5
  
Excellent

People are getting interviews through

based on 10 My Home Constructions interviews
Referral
WalkIn
Job Portal
Company Website
30%
20%
20%
10%
20% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 122 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.2
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
Piramal Realty Interview Questions
3.8
 • 8 Interviews
View all

My Home Constructions Reviews and Ratings

based on 354 reviews

4.4/5

Rating in categories

4.1

Skill development

4.3

Work-Life balance

4.0

Salary & Benefits

4.4

Job Security

4.2

Company culture

3.8

Promotions/Appraisal

4.1

Work Satisfaction

Explore 354 Reviews and Ratings
Purchase Engineer

Hyderabad / Secunderabad

6-10 Yrs

₹ 0.5-0.7 LPA

Assistant Manager /Sr. Engineer - Contracts & Commercial

Hyderabad / Secunderabad

5-10 Yrs

Not Disclosed

Explore more jobs
Junior Engineer
76 salaries
unlock blur

₹1.9 L/yr - ₹4.5 L/yr

Senior Engineer
75 salaries
unlock blur

₹4.2 L/yr - ₹9 L/yr

Engineer
64 salaries
unlock blur

₹3.5 L/yr - ₹6.2 L/yr

Assistant Manager
44 salaries
unlock blur

₹5.2 L/yr - ₹11 L/yr

Associate Manager
36 salaries
unlock blur

₹4 L/yr - ₹14 L/yr

Explore more salaries
Compare My Home Constructions with

Prestige Group

4.3
Compare

DLF

4.0
Compare

Sobha

3.9
Compare

Godrej Properties

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview