Filter interviews by
I applied via Walk-in and was interviewed before Aug 2022. There were 3 interview rounds.
Ask questions four regional manager
Top trending discussions
posted on 8 Dec 2024
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
I come from a diverse background with strong family values and support.
Grew up in a multicultural environment
Close-knit family with strong values
Supportive family members in various professions
Family has always encouraged education and personal growth
I was interviewed in Oct 2023.
I applied via Walk-in and was interviewed in Oct 2023. There was 1 interview round.
Heat exchangers are designed according to specific codes and standards to ensure safety and efficiency.
Heat exchangers are typically designed according to codes such as ASME, TEMA, and API.
These codes provide guidelines for materials, construction, testing, and inspection of heat exchangers.
For example, ASME Boiler and Pressure Vessel Code provides rules for the design and construction of pressure vessels including hea
Cooling tower design parameters include airflow rate, water flow rate, temperature range, and materials used.
Airflow rate is crucial for heat transfer efficiency.
Water flow rate determines the cooling capacity of the tower.
Temperature range affects the performance of the tower.
Materials used should be corrosion-resistant and durable.
Examples: Fiberglass reinforced plastic (FRP), galvanized steel, stainless steel.
Pressure vessel design codes are standards that provide guidelines for the design, fabrication, inspection, and testing of pressure vessels.
Common pressure vessel design codes include ASME Boiler and Pressure Vessel Code, EN 13445, and PD 5500.
Design codes ensure that pressure vessels are safe, reliable, and meet regulatory requirements.
Engineers must follow the specific requirements outlined in the chosen design code ...
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
The four levels of NABL documentation are Quality Manual, Quality Procedures, Work Instructions, and Records.
Quality Manual provides an overview of the quality management system.
Quality Procedures outline the processes and steps to be followed for quality assurance.
Work Instructions provide detailed instructions for specific tasks or activities.
Records document the results and evidence of quality control measures taken
Fertiliser is a substance added to soil to improve plant growth and yield.
Fertilisers provide essential nutrients like nitrogen, phosphorus, and potassium to plants.
There are different types of fertilisers such as organic, inorganic, and liquid fertilisers.
Overuse of fertilisers can lead to environmental pollution and harm aquatic life.
Fertilisers can be applied in various forms like granules, powders, or liquids.
Prope...
Fertilisers are substances added to soil to improve plant growth and yield.
Organic fertilisers: derived from plant or animal sources (e.g. manure, compost)
Inorganic fertilisers: manufactured chemically (e.g. ammonium nitrate, superphosphate)
Liquid fertilisers: dissolved in water for easy application
Slow-release fertilisers: nutrients released gradually over time
Specialised fertilisers: tailored for specific plants or s
I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 20 Jan 2023
I applied via Campus Placement and was interviewed before Jan 2022. There were 4 interview rounds.
Basic Chemical Engineering Questions from Fluid Mechanics, Thermodynamics, Mechanical Operations, Reaction Engineering, Mass and Heat Transfer
Group discussions related to agriculture and general knowledge
posted on 27 Nov 2023
I applied via campus placement at DY Patil College of Engineering and Technology, Kolhapur and was interviewed before Nov 2022. There were 6 interview rounds.
General aptitude taken on Some ongoing topics
Technical aptitude about technical knowledge
GD on Current topics
I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 3 interview rounds.
I have experience managing teams ranging from 5 to 20 members in previous roles.
Managed a team of 10 sales associates in my previous role
Led a team of 15 customer service representatives in a fast-paced environment
Currently overseeing a team of 8 marketing specialists in my current position
The quantum of monthly billing handled refers to the total amount of billing processed or managed on a monthly basis.
Quantum of monthly billing refers to the total amount of billing processed in a month
It includes all invoices, payments, and financial transactions handled by the individual
This metric is important for tracking financial performance and workload
For example, if the deputy manager handles $1 million in mon...
Methods of repairing honey combing in RCC include chipping out damaged concrete, cleaning the area, applying bonding agent, and then reapplying fresh concrete.
Chipping out the damaged concrete to expose the honey combing
Cleaning the area thoroughly to remove any loose debris
Applying a bonding agent to ensure proper adhesion of the new concrete
Reapplying fresh concrete to fill in the honey combing and create a smooth su
Civil quality is implemented on site through strict adherence to specifications, regular inspections, quality control measures, and proper documentation.
Adherence to project specifications and standards
Regular inspections by quality control team
Implementation of quality control measures such as material testing and concrete sampling
Proper documentation of quality checks and test results
Training of site staff on quality
I will immediately investigate the root cause of the concrete quality failure, take corrective actions, and implement preventive measures to avoid future failures.
Investigate the root cause of the quality failure, such as incorrect mix proportions or improper curing methods
Take immediate corrective actions, such as removing and replacing the faulty concrete or adjusting the mix design
Implement preventive measures, such...
I applied via Recruitment Consultant and was interviewed in Jul 2021. There were 6 interview rounds.
Major high risks in P2P and O2C process
Fraudulent activities such as fake invoices and payments
Inaccurate data entry leading to incorrect payments or deliveries
Lack of proper controls and monitoring leading to errors and losses
Non-compliance with regulations and policies leading to legal and financial penalties
Cybersecurity threats such as hacking and data breaches
Supplier or customer bankruptcy affecting the entire pr
based on 5 reviews
Rating in categories
Assistant Manager
24
salaries
| ₹5.5 L/yr - ₹11.2 L/yr |
System Engineer
21
salaries
| ₹2 L/yr - ₹5 L/yr |
Deputy Manager
18
salaries
| ₹6 L/yr - ₹14.4 L/yr |
Senior Executive
16
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Manager
13
salaries
| ₹10.2 L/yr - ₹22 L/yr |
Tata Group
Aditya Birla Group
Reliance Industries
Mahindra & Mahindra