I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
I took risks in my last company by implementing new technologies and processes to improve efficiency and productivity.
Implemented a new project management software to streamline communication and collaboration among team members.
Introduced a lean manufacturing approach to reduce waste and optimize production processes.
Took on a challenging project with a tight deadline, leveraging my problem-solving skills to successfu...
A project plan is a detailed document that outlines the scope, objectives, tasks, timelines, and resources required to complete a project.
Defines project scope and objectives
Breaks down project into tasks and sub-tasks
Assigns responsibilities and timelines
Identifies required resources and budget
Provides a roadmap for project execution and monitoring
Top trending discussions
I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.
It depends on the region, for me they conducted tool test in the 1st round.
I was interviewed in May 2023.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
based on 3 reviews
Rating in categories
Mechanical Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Consultant
37
salaries
| ₹0 L/yr - ₹0 L/yr |
IT Analyst
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Consultant
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
Arup