Revit tool test and questions related to BIM
Generator size and transformer size are determined based on the power requirements and load characteristics of the system.
Generator size is determined by the power requirements of the system, taking into account factors such as peak load, average load, and efficiency.
Transformer size is determined by the voltage and current requirements of the system, as well as the power factor and impedance of the load.
It is importan...
I appeared for an interview in Apr 2023.
I applied via Company Website and was interviewed in Apr 2022. There were 3 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Oct 2020. There was 1 interview round.
I appeared for an interview in May 2023.
I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.
It depends on the region, for me they conducted tool test in the 1st round.
I applied via Company Website and was interviewed before Mar 2023. There were 3 interview rounds.
Hacker Rank test with medium difficulty
A case study for a problem statement
I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.
based on 2 interviews
Interview experience
based on 16 reviews
Rating in categories
Electrical Engineer
55
salaries
| ₹4.6 L/yr - ₹15 L/yr |
Mechanical Engineer
42
salaries
| ₹4.9 L/yr - ₹15 L/yr |
Consultant
38
salaries
| ₹5.4 L/yr - ₹11 L/yr |
Structural Engineer
36
salaries
| ₹5.4 L/yr - ₹22.4 L/yr |
Senior Consultant
35
salaries
| ₹7.2 L/yr - ₹20 L/yr |
Deloitte
Ernst & Young
PwC
KPMG India