Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Ernst & Young Team. If you also belong to the team, you can get access from here

Ernst & Young Verified Tick

Compare button icon Compare button icon Compare
3.4

based on 10.3k Reviews

Filter interviews by

Ernst & Young Senior Project Manager Interview Questions and Answers

Updated 22 Feb 2024

Ernst & Young Senior Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

About what i have done in the project mgt. Questions about Projects and case studies.

Round 2 - One-on-one 

(1 Question)

  • Q1. Detailed functional questions about Fusion HCM; What if Project Mgt scenarios questions?

Senior Project Manager Jobs at Ernst & Young

View all

Interview questions from similar companies

Round 1 - Technical 

(7 Questions)

  • Q1. Flexible road,and rigid pavement
  • Q2. Flexible pavement:- 1 embankment large size of soil particles 75mm lumps and cloud. Liquid limit <50%, plastic limit<25%, swelling and shrinkage <50%. effective cbr as per design. Thicknesses of embankm...
  • Q3. Rigid pavement:- embankment to GSB layer same process of flexible pavement. DLC:- 150mm thicknes aggregate size 26.5mm,maximum water content 2%, Soundness test Naso4 12%, MGSO4 18, Angle of abrasio...
  • Ans. 

    The question discusses the process and specifications for laying rigid pavement using DLC and M15 grade concrete.

    • Rigid pavement process similar to flexible pavement

    • DLC specifications - 150mm thickness, aggregate size 26.5mm, maximum water content 2%, soundness test, angle of abrasion, equivalent weight of sand, alkali content

    • Minimum cement content - 150 kg per cum for flyash less than 20%, 110 kg per cum for flyash mor...

  • Answered by AI
  • Q4. PQC :-thicknesses 300m aggregate size 31.5mm.,minimum cement content 360kg percum. If fly ash mor than 20% The minimum cement 361 kg per cum The flexuar strength cc after 28 day curing 4.5 Mpa, use ...
  • Q5. Tie bar provided longitudinal directions to prevent trasverse cracking and differental deflection. Tie 12 mm dia 1 meter length Full length tie bar epoxy coated.i it is connection with two slab.
  • Q6. PQC mix pre mix batching plant.ii within 10km temperature maintain 25degg C Before laying of pqc separation memberanc 125 micron overlapped length300mm dlc surfaces clean by high pressure dust cle...
  • Q7. Automatic electronic paver sensior machine laid down dowel bar mid depth of slab 300mm PQC layer properly maintain compaction no loss cement concrete.
  • Ans. 

    The question is about a machine that automatically lays down dowel bars mid-depth of a 300mm PQC layer with proper compaction and no loss of cement concrete.

    • The machine is an automatic electronic paver sensor

    • It lays down dowel bars mid-depth of a 300mm PQC layer

    • Proper maintenance of compaction is required

    • No loss of cement concrete should occur

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As per site requirement other operation adopted, texture. Initial sawing in 4to 8 hr
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Earned value management
  • Q2. Basic MS Excel, pivot
  • Q3. Change Management process
  • Q4. Project management basic questions, PMO, MIS reporting
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Expected salary
Round 1 - Technical 

(7 Questions)

  • Q1. Flexible road,and rigid pavement
  • Q2. Flexible pavement:- 1 embankment large size of soil particles 75mm lumps and cloud. Liquid limit <50%, plastic limit<25%, swelling and shrinkage <50%. effective cbr as per design. Thicknesses of embankm...
  • Q3. Rigid pavement:- embankment to GSB layer same process of flexible pavement. DLC:- 150mm thicknes aggregate size 26.5mm,maximum water content 2%, Soundness test Naso4 12%, MGSO4 18, Angle of abrasio...
  • Ans. 

    The question discusses the process and specifications for laying rigid pavement using DLC and M15 grade concrete.

    • Rigid pavement process similar to flexible pavement

    • DLC specifications - 150mm thickness, aggregate size 26.5mm, maximum water content 2%, soundness test, angle of abrasion, equivalent weight of sand, alkali content

    • Minimum cement content - 150 kg per cum for flyash less than 20%, 110 kg per cum for flyash mor...

  • Answered by AI
  • Q4. PQC :-thicknesses 300m aggregate size 31.5mm.,minimum cement content 360kg percum. If fly ash mor than 20% The minimum cement 361 kg per cum The flexuar strength cc after 28 day curing 4.5 Mpa, use ...
  • Q5. Tie bar provided longitudinal directions to prevent trasverse cracking and differental deflection. Tie 12 mm dia 1 meter length Full length tie bar epoxy coated.i it is connection with two slab.
  • Q6. PQC mix pre mix batching plant.ii within 10km temperature maintain 25degg C Before laying of pqc separation memberanc 125 micron overlapped length300mm dlc surfaces clean by high pressure dust cle...
  • Q7. Automatic electronic paver sensior machine laid down dowel bar mid depth of slab 300mm PQC layer properly maintain compaction no loss cement concrete.
  • Ans. 

    The question is about a machine that automatically lays down dowel bars mid-depth of a 300mm PQC layer with proper compaction and no loss of cement concrete.

    • The machine is an automatic electronic paver sensor

    • It lays down dowel bars mid-depth of a 300mm PQC layer

    • Proper maintenance of compaction is required

    • No loss of cement concrete should occur

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As per site requirement other operation adopted, texture. Initial sawing in 4to 8 hr

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 5 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Technical implementation of projects, technical scenarios, detailed discussion about services to offer
Round 2 - One-on-one 

(1 Question)

  • Q1. More advanced questions on project management, people management, stakeholder management, Agile execution, cloud engagements.
Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Not sure why the whole HR discussion was about salary nothing else, not sure if this is the norm.
Round 4 - One-on-one 

(1 Question)

  • Q1. Client round - talk to the client directly, mainly the PM department from the client side.
Round 5 - One-on-one 

(1 Question)

  • Q1. Stakeholder discussion - Portfolio manager from the client side discusses the experience and scenarios to check the fitment, if works fine stakeholder gives a go ahead and you can onboard.

Interview Preparation Tips

Topics to prepare for KPMG India Senior Manager Project Management interview:
  • Project Management
  • Stakeholder Management
  • Agile Methodology
  • Communication Skills
  • People Management
Interview preparation tips for other job seekers - Project and program management concepts should be clear and should be ready for scenario based questions, i insist on preparing well on all the PM scenarios and experiences faced, so that you sail through, you should have strong case to be selected, work on communication.

Note : Please be very sure about discussing the opportunity with the HR, since its an Auditing firm you have to abide by the firm laws, which means you might have to dispose your equity investments, which i was not clearly mentioned before joining the firm, if you dont have stock market investments, you should be good, but if you have invested in equities be ready to dispose them off, please have a clear conversation about this, if needed, get it in writing.
Round 1 - One-on-one 

(1 Question)

  • Q1. Technical question asked during
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and location

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical need to be ready before interview ------------
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Technical presales questions
  • Q2. Presales techniques and business development

Interview Preparation Tips

Interview preparation tips for other job seekers - Know your subject, answer confidently and don't shy away from admitting when you don't know something. As important as it is to show what you know, it's equally if not more important to know and be confident to admit what you don't.

I applied via Indeed and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What qualities u recognized as a humanity towards u r customers

Interview Preparation Tips

Interview preparation tips for other job seekers - It would be real however u r qualified

Ernst & Young Interview FAQs

How many rounds are there in Ernst & Young Senior Project Manager interview?
Ernst & Young interview process usually has 2 rounds. The most common rounds in the Ernst & Young interview process are Group Discussion and One-on-one Round.
How to prepare for Ernst & Young Senior Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ernst & Young. The most common topics and skills that interviewers at Ernst & Young expect are Project Management, PMP, Consulting, Agile Coaching and Analytical Chemistry.

Tell us how to improve this page.

Ernst & Young Senior Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Accenture Interview Questions
3.9
 • 8.1k Interviews
Capgemini Interview Questions
3.8
 • 4.8k Interviews
Deloitte Interview Questions
3.8
 • 2.8k Interviews
IBM Interview Questions
4.0
 • 2.4k Interviews
PwC Interview Questions
3.4
 • 1.4k Interviews
KPMG India Interview Questions
3.5
 • 789 Interviews
ZS Interview Questions
3.4
 • 477 Interviews
BCG Interview Questions
3.8
 • 195 Interviews
View all
Ernst & Young Senior Project Manager Salary
based on 44 salaries
₹14 L/yr - ₹38 L/yr
11% less than the average Senior Project Manager Salary in India
View more details

Ernst & Young Senior Project Manager Reviews and Ratings

based on 4 reviews

4.8/5

Rating in categories

4.7

Skill development

3.5

Work-life balance

3.9

Salary

4.2

Job security

3.6

Company culture

3.9

Promotions

4.5

Work satisfaction

Explore 4 Reviews and Ratings
Senior Consultant
15.6k salaries
unlock blur

₹9.1 L/yr - ₹29.5 L/yr

Consultant
11.9k salaries
unlock blur

₹6 L/yr - ₹19 L/yr

Manager
7.5k salaries
unlock blur

₹16.5 L/yr - ₹52 L/yr

Assistant Manager
6.4k salaries
unlock blur

₹9.5 L/yr - ₹29 L/yr

Associate Consultant
3.8k salaries
unlock blur

₹3.5 L/yr - ₹12 L/yr

Explore more salaries
Compare Ernst & Young with

Deloitte

3.8
Compare

PwC

3.4
Compare

EY Global Delivery Services ( EY GDS)

3.6
Compare

Accenture

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview