WSP Senior Project Manager Interview Experiences

1 interview found

Round 1 - Technical 

(7 Questions)

  • Q1. Flexible road,and rigid pavement
  • Q2. Flexible pavement:- 1 embankment large size of soil particles 75mm lumps and cloud. Liquid limit <50%, plastic limit<25%, swelling and shrinkage <50%. effective cbr as per design. Thicknesses of embankm...
  • Q3. Rigid pavement:- embankment to GSB layer same process of flexible pavement. DLC:- 150mm thicknes aggregate size 26.5mm,maximum water content 2%, Soundness test Naso4 12%, MGSO4 18, Angle of abrasio...
  • Ans. 

    The question discusses the process and specifications for laying rigid pavement using DLC and M15 grade concrete.

    • Rigid pavement process similar to flexible pavement

    • DLC specifications - 150mm thickness, aggregate size 26.5mm, maximum water content 2%, soundness test, angle of abrasion, equivalent weight of sand, alkali content

    • Minimum cement content - 150 kg per cum for flyash less than 20%, 110 kg per cum for flyash mor...

  • Answered by AI
  • Q4. PQC :-thicknesses 300m aggregate size 31.5mm.,minimum cement content 360kg percum. If fly ash mor than 20% The minimum cement 361 kg per cum The flexuar strength cc after 28 day curing 4.5 Mpa, use ...
  • Q5. Tie bar provided longitudinal directions to prevent trasverse cracking and differental deflection. Tie 12 mm dia 1 meter length Full length tie bar epoxy coated.i it is connection with two slab.
  • Q6. PQC mix pre mix batching plant.ii within 10km temperature maintain 25degg C Before laying of pqc separation memberanc 125 micron overlapped length300mm dlc surfaces clean by high pressure dust cle...
  • Q7. Automatic electronic paver sensior machine laid down dowel bar mid depth of slab 300mm PQC layer properly maintain compaction no loss cement concrete.
  • Ans. 

    The question is about a machine that automatically lays down dowel bars mid-depth of a 300mm PQC layer with proper compaction and no loss of cement concrete.

    • The machine is an automatic electronic paver sensor

    • It lays down dowel bars mid-depth of a 300mm PQC layer

    • Proper maintenance of compaction is required

    • No loss of cement concrete should occur

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As per site requirement other operation adopted, texture. Initial sawing in 4to 8 hr

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. How a project manager can be successful.
  • Q2. How you make you worthy for the company

I applied via Walk-in and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What type of conflicts have you seen in project management

Interview Preparation Tips

Interview preparation tips for other job seekers -
pmp certification is valued

I applied via Approached by Company and was interviewed before Jul 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How do you fetch reports from JIRA
  • Ans. 

    To fetch reports from JIRA, go to the 'Reports' section and select the desired report.

    • Navigate to the 'Reports' section in JIRA

    • Select the desired report

    • Customize the report if necessary

    • Export the report in the desired format

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare more on agile related topics and also be strong technically.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. My backgrounds Photogrammetry

I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Tell me about yourself
  • Q2. Explain one of your recent projects
  • Q3. Tell me one risk that ypu handled recently
  • Q4. Difference between risk and challenge
  • Ans. 

    Risk is a potential negative outcome while challenge is an opportunity for growth.

    • Risk is something that may cause harm or loss while challenge is a task that requires effort and skill.

    • Risk is often associated with uncertainty and unpredictability while challenge is a known obstacle that can be overcome.

    • Risk can have a negative impact on a project or organization while challenge can lead to personal or professional gro...

  • Answered by AI
  • Q5. Project is not progressing well what will be your action as project manager
  • Ans. 

    Identify the root cause, re-evaluate the project plan, and communicate with stakeholders.

    • Conduct a thorough analysis to identify the root cause of the issue

    • Re-evaluate the project plan and make necessary adjustments

    • Communicate with stakeholders to keep them informed and get their input

    • Implement corrective actions and monitor progress closely

    • Consider bringing in additional resources or expertise if needed

  • Answered by AI
Round 2 - One-on-one 

(3 Questions)

  • Q1. Why do you want to join HCL
  • Q2. What are the tasks and roles as resposibilities you play day in day out as project manager
  • Q3. Do you do budgeting as well

Interview Preparation Tips

Interview preparation tips for other job seekers - Make sure you know each and every word you have written in ur CV and speak during interview

I applied via Naukri.com and was interviewed before Feb 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Experience as Technical architect
  • Ans. 

    I have extensive experience as a technical architect, having led multiple projects from conception to implementation.

    • Designed and implemented a scalable cloud-based infrastructure for a SaaS product

    • Developed a microservices architecture for a large e-commerce platform

    • Led a team of developers in building a custom CRM system for a client

    • Created technical specifications and provided guidance to development teams

    • Stayed up-...

  • Answered by AI
  • Q2. Experience as Proposal owner
  • Q3. Experience as Project Manager
  • Q4. Experience in budgeting and costing
  • Ans. 

    I have extensive experience in budgeting and costing, including creating and managing budgets, forecasting expenses, and identifying cost-saving opportunities.

    • Created and managed budgets for multiple projects, ensuring expenses were within allocated funds

    • Forecasted expenses for upcoming quarters and adjusted budgets accordingly

    • Identified cost-saving opportunities by analyzing expenses and negotiating with vendors

    • Implem...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared technically and try to provide real time examples. There will be a background check and don't think to fake your experience.

Interview Questionnaire 

1 Question

  • Q1. How well do you manage your team when a critical resource is on leave?
  • Ans. 

    I prioritize tasks and delegate responsibilities to ensure smooth functioning of the team.

    • Identify critical tasks and prioritize them

    • Delegate responsibilities to team members based on their strengths

    • Ensure clear communication and provide necessary support

    • Monitor progress and make adjustments as needed

    • Maintain a positive and supportive work environment

    • Examples: During a team member's absence, I delegated their tasks to ...

  • Answered by AI

Interview Questionnaire 

2 Questions

  • Q1. Tell about yourself and about job profile in previous organisation , Tell about any two challenging projects and highlight the risk or issues faced in those projects , how Project planning is created and w...
  • Ans. 

    I have experience as a Project Manager and have successfully completed challenging projects. I am skilled in project planning, resource management, and managing changes.

    • In my previous organization, I worked as a Project Manager where I successfully completed various projects.

    • One of the challenging projects I worked on was the implementation of a new CRM system. The main risk we faced was the integration with existing s...

  • Answered by AI
  • Q2. Why you want to leave the current organisation ?
  • Ans. 

    Seeking new challenges and growth opportunities.

    • Looking for a more challenging role that aligns with my skills and experience.

    • Seeking opportunities for professional growth and development.

    • Desire to work in a more dynamic and innovative environment.

    • Wishing to expand my knowledge and skills by working on different projects.

    • Seeking better work-life balance or location convenience.

  • Answered by AI

Interview Questionnaire 

2 Questions

  • Q1. How to management risk in the project
  • Ans. 

    Risk management in a project involves identifying, assessing, and mitigating potential risks.

    • Identify potential risks and their impact on the project

    • Assess the likelihood and severity of each risk

    • Develop a plan to mitigate or avoid each risk

    • Monitor and review risks throughout the project

    • Communicate risks and mitigation plans to stakeholders

  • Answered by AI
  • Q2. Master data management, Resource attrition

Interview Preparation Tips

Interview preparation tips for other job seekers - Share your answer in very bold manar
Contribute & help others!
anonymous
You can choose to be anonymous

WSP Interview FAQs

How many rounds are there in WSP Senior Project Manager interview?
WSP interview process usually has 1 rounds. The most common rounds in the WSP interview process are Technical.
How to prepare for WSP Senior Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at WSP. The most common topics and skills that interviewers at WSP expect are Project Delivery, Project Management, Software Configuration Management, Aviation and CCTV Monitoring.
What are the top questions asked in WSP Senior Project Manager interview?

Some of the top questions asked at the WSP Senior Project Manager interview -

  1. Rigid pavement:- embankment to GSB layer same process of flexible pavement. D...read more
  2. Automatic electronic paver sensior machine laid down dowel bar mid depth of...read more
  3. Flexible pavement:- 1 embankment large size of soil particles 75mm lumps and ...read more

Recently Viewed

LIST OF COMPANIES

Ernst & Young

Locations

INTERVIEWS

WSP

No Interviews

INTERVIEWS

WSP

No Interviews

JOBS

Ernst & Young

No Jobs

REVIEWS

Ernst & Young

No Reviews

JOBS

Ernst & Young

No Jobs

JOBS

Ernst & Young

No Jobs

JOBS

Ernst & Young

No Jobs

REVIEWS

Blackrock

No Reviews

INTERVIEWS

C Centric Solutions

No Interviews

Tell us how to improve this page.

WSP Senior Project Manager Salary
based on 4 salaries
₹16 L/yr - ₹24 L/yr
25% less than the average Senior Project Manager Salary in India
View more details
BIM Modeller
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
60 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Principal Engineer
58 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
57 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

CAD Technician
57 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare WSP with

AECOM

4.2
Compare

Jacobs Engineering Group

4.1
Compare

Fluor Corporation

4.3
Compare

TCS

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview