Filter interviews by
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
NPD Procedure is a structured process for developing new products from idea generation to commercialization.
NPD Procedure typically involves stages such as idea generation, concept development, product design, testing, and launch.
It includes market research, competitor analysis, and feasibility studies to ensure the new product's success.
Cross-functional collaboration among departments like R&D, marketing, and prod...
Rubber to metal parts validation involves testing for durability, adhesion, and performance.
Perform adhesion tests to ensure the rubber is properly bonded to the metal
Conduct durability tests to assess the longevity of the rubber to metal bond
Test for performance under various conditions such as temperature, pressure, and vibration
Utilize techniques like pull testing, thermal cycling, and accelerated aging tests
Conside...
Rate your
company
🤫 100% anonymous
How was your last interview experience?
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 2 interview rounds.
SPC stands for Statistical Process Control and MSA stands for Measurement System Analysis.
SPC is a method of quality control which uses statistical methods to monitor and control a process.
MSA is a method used to assess the variation in measurement processes.
SPC helps in identifying and reducing variation in a process, while MSA helps in ensuring that measurement systems are accurate and reliable.
Examples of SPC tools ...
There are two main types of rubber: natural rubber and synthetic rubber.
Natural rubber is derived from the latex of rubber trees and is used in products like tires, gloves, and footwear.
Synthetic rubber is man-made and includes types like neoprene, nitrile, and silicone rubber.
Each type of rubber has different properties and is used for specific applications.
I manage customer complaints by listening to their concerns, investigating the issue, providing solutions, and following up to ensure satisfaction.
Listen actively to understand the customer's complaint
Investigate the root cause of the issue
Provide timely and effective solutions to address the complaint
Follow up with the customer to ensure their satisfaction
Document and analyze trends in customer complaints for continuo
Defects in rubber molding can include air bubbles, flash, incomplete cure, and warping.
Air bubbles: trapped air pockets in the molded rubber
Flash: excess rubber material extending from the mold
Incomplete cure: rubber not fully cured, leading to soft spots or weakness
Warping: distortion or bending of the molded rubber
I applied via Telegram and was interviewed in May 2024. There was 1 interview round.
A relay is an electrically operated switch that uses an electromagnet to mechanically operate a switch.
Relays are used to control high power circuits with low power signals
They are commonly used in automotive, industrial, and household applications
Relays can be classified based on their operation, such as electromechanical relays or solid-state relays
Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, given constant resistance.
Ohm's law equation: V = I * R (voltage = current * resistance)
Current is the flow of electric charge through a conductor
Higher voltage leads to higher current flow, given constant resistance
Lower resistance leads to higher current flow, given constant voltage
posted on 4 Nov 2024
Samvardhana Motherson Group interview questions for popular designations
Quality control is a process used to ensure that products or services meet specified requirements and standards.
Quality control involves monitoring and testing products or services to ensure they meet predetermined standards
It helps identify defects or errors in the production process
Quality control aims to prevent defects and improve the overall quality of products or services
Examples include inspecting products for d...
Inspection is a thorough examination or assessment of a building or equipment to ensure safety and compliance with regulations.
Inspections involve checking for potential hazards, defects, or violations of codes and standards.
Inspectors may use tools such as cameras, measuring devices, or testing equipment during the inspection.
The purpose of an inspection is to identify and address any issues that could pose a risk to ...
Manufacturing is the process of producing goods through the use of labor, machines, tools, and chemical or biological processing.
Manufacturing involves transforming raw materials into finished products
It includes various processes such as casting, molding, cutting, welding, and assembling
Manufacturing can be done in industries like automotive, aerospace, electronics, and pharmaceuticals
Types of manufacturing include additive manufacturing, subtractive manufacturing, and formative manufacturing.
Additive manufacturing: building up materials layer by layer, such as 3D printing
Subtractive manufacturing: removing material from a solid block to create the final product, such as CNC machining
Formative manufacturing: shaping materials into the desired form, such as forging or casting
The 5 process types are continuous, batch, job shop, project, and line.
Continuous process involves uninterrupted flow of production, like in oil refineries.
Batch process produces a group of products at one time, like in pharmaceuticals.
Job shop process is customized and flexible, like in machine shops.
Project process is unique and temporary, like in construction projects.
Line process is repetitive and standardized, lik
Structured processes can be production processes producing products and services. The process of an assembly line is a good example. Not all production processes are structured, but there is a tendency to make them as structured as possible.
Get interview-ready with Top Samvardhana Motherson Group Interview Questions
I was interviewed in Jul 2024.
Subcontractors planning Store related
Planning for subcontractors
Grn machine planning
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Production output can be calculated by multiplying the number of units produced by the standard hours per unit.
Calculate the number of units produced during a specific time period.
Determine the standard hours per unit required for production.
Multiply the number of units produced by the standard hours per unit to get the production output.
OEE stands for Overall Equipment Effectiveness. It is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability = (Operating Time / Planned Production Time) * 100%
Performance = (Ideal Cycle Time / Total Cycle Time) * 100%
Quality = (Good Count / Total Count) * 100%
OEE = Availability * Performance * Quality
For example, if a machine ope...
I applied via Recruitment Consulltant and was interviewed before Oct 2023. There were 3 interview rounds.
Six Sigma is a data-driven methodology for improving processes by reducing defects and variation.
Six Sigma focuses on identifying and eliminating causes of defects and errors in a process.
It uses statistical analysis to measure and improve process performance.
Six Sigma projects follow a structured approach known as DMAIC (Define, Measure, Analyze, Improve, Control).
Successful implementation of Six Sigma can lead to inc...
I have 5 years of experience as a supervisor in a retail store, where I managed a team of 15 employees and increased sales by 20%.
Managed a team of 15 employees
Increased sales by 20%
5 years of experience as a supervisor in a retail store
To achieve target, set clear goals, create action plans, monitor progress, adjust strategies as needed, and motivate team members.
Set specific, measurable, achievable, relevant, and time-bound goals
Create action plans outlining steps to reach the target
Regularly monitor progress and adjust strategies if necessary
Motivate team members to stay focused and committed
Provide necessary resources and support to achieve the ta
Manpower planning involves forecasting the future workforce needs of an organization and developing strategies to meet those needs.
Analyzing current workforce demographics and skills
Forecasting future workforce needs based on business goals and growth projections
Developing recruitment and retention strategies to ensure the organization has the right talent in place
Identifying training and development opportunities to u...
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
The duration of Samvardhana Motherson Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 195 interviews
Interview experience
based on 3.1k reviews
Rating in categories
Assistant Engineer
950
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
658
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
575
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
499
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
496
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Tata Motors
Mahindra & Mahindra
TVS Motor