Upload Button Icon Add office photos

Filter interviews by

Samvardhana Motherson Group Assembly Production Engineer Interview Questions, Process, and Tips

Updated 27 Jan 2024

Top Samvardhana Motherson Group Assembly Production Engineer Interview Questions and Answers

View all 15 questions

Samvardhana Motherson Group Assembly Production Engineer Interview Experiences

4 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - HR 

(6 Questions)

  • Q1. Tell me about your self
  • Q2. Behind company salary discussion
  • Q3. What's is 5s and fifo
  • Ans. 

    5S is a workplace organization method that focuses on creating a clean and efficient work environment. FIFO stands for First In, First Out and is a method used to manage inventory and ensure that older items are used or sold before newer ones.

    • 5S is a systematic approach to organizing and maintaining a clean and efficient workplace.

    • It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.

    • The goal of 5...

  • Answered by AI
  • Q4. Family enquiry and previous Company name
  • Q5. Behind company extra venifit
  • Q6. Behind company facility

Interview Preparation Tips

Interview preparation tips for other job seekers - Self discipline and good behavior person

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(14 Questions)

  • Q1. What is tpm and jh steps
  • Ans. 

    TPM stands for Total Productive Maintenance and JH steps refer to Job Hazard Analysis steps.

    • TPM is a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.

    • It involves proactive maintenance, employee involvement, and continuous improvement.

    • JH steps are a set of procedures used to identify and analyze potential hazards in a job or task.

    • They help in developing safety measure...

  • Answered by AI
  • Q2. What is oee calculation and efficiency
  • Ans. 

    OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality metrics.

    • OEE stands for Overall Equipment Effectiveness

    • It is calculated by multiplying availability, performance, and quality metrics

    • Availability measures the percentage of time the equipment is available for production

    • Performance measures the speed at which the equipment is running compared to its maximum spe...

  • Answered by AI
  • Q3. What do you manpower handling
  • Q4. What is assembly line processing in your plant
  • Ans. 

    Assembly line processing in our plant involves a series of steps where each worker performs a specific task to assemble a product.

    • Each worker is responsible for a specific task in the assembly process

    • The product moves along a conveyor belt from one worker to the next

    • Quality control checks are performed at various stages of the process

    • Efficiency and productivity are key factors in assembly line processing

    • Examples includ...

  • Answered by AI
  • Q5. What is skills matrix
  • Ans. 

    A skills matrix is a tool used to assess and track the skills and competencies of employees within an organization.

    • It helps identify skill gaps and training needs

    • It can be used for succession planning and career development

    • It can aid in performance evaluations and goal setting

    • It can be used to ensure compliance with industry standards and regulations

  • Answered by AI
  • Q6. What poka yoke and capa
  • Ans. 

    Poka yoke is a mistake-proofing technique and CAPA is a corrective and preventive action process.

    • Poka yoke is a Japanese term that means 'mistake-proofing'. It involves designing a process or product in a way that prevents errors from occurring.

    • CAPA stands for Corrective and Preventive Action. It is a process used to identify and address the root cause of a problem to prevent it from happening again.

    • Poka yoke and CAPA ...

  • Answered by AI
  • Q7. What is this kaizen and suggestion
  • Ans. 

    Kaizen is a Japanese term for continuous improvement, while suggestion refers to ideas for improvement from employees.

    • Kaizen involves making small, incremental improvements to processes and systems over time.

    • Suggestion programs encourage employees to share their ideas for improvement and provide feedback on existing processes.

    • Both kaizen and suggestion are important for promoting a culture of continuous improvement and...

  • Answered by AI
  • Q8. What is this iso-ts and iatf audit. Which you calibration gauge and parameter.
  • Ans. 

    ISO/TS and IATF audits are quality management system audits for automotive industry. Calibration gauge and parameter are important for ensuring accuracy and consistency in production.

    • ISO/TS and IATF audits are conducted to ensure that the quality management system of a company meets the requirements of the automotive industry.

    • Calibration gauge and parameter are used to ensure that the measurement equipment used in prod...

  • Answered by AI
  • Q9. Different numatic and hydraulic pressure
  • Ans. 

    Pneumatic pressure uses compressed air while hydraulic pressure uses a liquid, usually oil.

    • Pneumatic pressure is typically lower than hydraulic pressure

    • Hydraulic pressure is more efficient for heavy-duty applications

    • Pneumatic pressure is cleaner and easier to maintain

    • Examples of pneumatic systems include air brakes on vehicles and pneumatic tools

    • Examples of hydraulic systems include car brakes and heavy machinery

  • Answered by AI
  • Q10. What is this wsqc.wes.and swc
  • Ans. 

    Insufficient information provided to answer the question.

    • There is not enough context to determine what wsqc.wes.and swc refers to.

    • More information is needed to provide an accurate answer.

    • It is important to clarify the context of the question before attempting to answer it.

  • Answered by AI
  • Q11. What is this 6 sigma
  • Ans. 

    6 Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.

    • It aims to achieve a level of quality where the probability of defects is less than 3.4 per million opportunities.

    • It involves five phases: Define, Measure, Analyze, Improve, and Control (DMAIC).

    • It uses statistical tools and techniques to identify and eliminate the root causes of defects.

    • It is widely used in manuf...

  • Answered by AI
  • Q12. What is this 5s and fifo
  • Ans. 

    5S is a methodology for workplace organization and standardization. FIFO is a method of inventory management.

    • 5S stands for Sort, Set in Order, Shine, Standardize, and Sustain

    • 5S helps to improve efficiency, safety, and quality in the workplace

    • FIFO stands for First In, First Out

    • FIFO is used to manage inventory by ensuring that the oldest items are used or sold first

    • FIFO is commonly used in industries such as food and bev

  • Answered by AI
  • Q13. What is this kpi instruction
  • Ans. 

    KPI stands for Key Performance Indicator. It is a measurable value that demonstrates how effectively a company is achieving its key business objectives.

    • KPIs are used to evaluate the success of an organization or of a particular activity in which it engages.

    • They help to identify areas that require improvement and to set targets for improvement.

    • Examples of KPIs include revenue growth, customer satisfaction, employee turn...

  • Answered by AI
  • Q14. What is this tsv and csv
  • Ans. 

    TSV stands for Tab Separated Values and CSV stands for Comma Separated Values.

    • TSV and CSV are file formats used to store and exchange data.

    • TSV separates values using tabs while CSV separates values using commas.

    • Both formats are commonly used in spreadsheets and databases.

    • TSV is preferred when data contains commas while CSV is preferred when data contains tabs.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge and good communication. And given basic knowledge production and basic training given all operations and all processes all associates

Assembly Production Engineer Interview Questions Asked at Other Companies

Q1. What is this iso-ts and iatf audit. Which you calibration gauge a ... read more
Q2. What is tpm and jh steps
Q3. What is assembly line processing in your plant
Q4. How to increase stroke length without changing in bore dia?
Q5. What is oee calculation and efficiency
Round 1 - Technical 

(1 Question)

  • Q1. What is 5S? OEE, manpower handling
  • Ans. 

    5S is a methodology for workplace organization and standardization. OEE measures manufacturing productivity. Manpower handling refers to managing employees.

    • 5S involves sorting, simplifying, sweeping, standardizing, and sustaining.

    • OEE measures the percentage of planned production time that is truly productive.

    • Manpower handling includes recruiting, training, scheduling, and performance management.

    • All three concepts are i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep basics clear about shop floor handling and manpower management. Line Balancing , tact time and other industrial engineering topics are very important.
Round 1 - HR 

(4 Questions)

  • Q1. He ask me some personal information about you
  • Q2. Tell some thing about your self and your qualification.. ?
  • Q3. Why you are changing the company?
  • Q4. Tell me some thing about your skills?

Interview Preparation Tips

Interview preparation tips for other job seekers - You should be know about yourself like your background..

Samvardhana Motherson Group interview questions for designations

 Production Engineer

 (12)

 Senior Production Engineer

 (3)

 Junior Engineer Production

 (2)

 Production

 (3)

 Production Planning Control Engineer

 (1)

 Production Worker

 (1)

 Production Incharge

 (1)

 Production Operator

 (1)

Samvardhana Motherson Group Interview FAQs

How many rounds are there in Samvardhana Motherson Group Assembly Production Engineer interview?
Samvardhana Motherson Group interview process usually has 1-2 rounds. The most common rounds in the Samvardhana Motherson Group interview process are HR, Technical and Resume Shortlist.
What are the top questions asked in Samvardhana Motherson Group Assembly Production Engineer interview?

Some of the top questions asked at the Samvardhana Motherson Group Assembly Production Engineer interview -

  1. What is this iso-ts and iatf audit. Which you calibration gauge and paramet...read more
  2. What is tpm and jh st...read more
  3. What is assembly line processing in your pl...read more

Tell us how to improve this page.

Samvardhana Motherson Group Assembly Production Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Motors Interview Questions
4.2
 • 985 Interviews
Maruti Suzuki Interview Questions
4.2
 • 587 Interviews
Bosch Interview Questions
4.2
 • 331 Interviews
Hero MotoCorp Interview Questions
4.2
 • 328 Interviews
TVS Motor Interview Questions
4.0
 • 306 Interviews
MRF Tyres Interview Questions
3.7
 • 293 Interviews
Bajaj Auto Interview Questions
3.9
 • 267 Interviews
JBM Group Interview Questions
4.0
 • 252 Interviews
Ashok Leyland Interview Questions
4.1
 • 231 Interviews
View all
Samvardhana Motherson Group Assembly Production Engineer Salary
based on 7 salaries
₹2 L/yr - ₹3.6 L/yr
21% less than the average Assembly Production Engineer Salary in India
View more details

Samvardhana Motherson Group Assembly Production Engineer Reviews and Ratings

based on 4 reviews

4.8/5

Rating in categories

4.2

Skill development

4.8

Work-life balance

4.8

Salary

4.8

Job security

4.6

Company culture

4.8

Promotions

4.6

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Engineer
983 salaries
unlock blur

₹1 L/yr - ₹5.5 L/yr

Engineer
664 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Assistant Manager
602 salaries
unlock blur

₹4 L/yr - ₹13.2 L/yr

Senior Engineer
499 salaries
unlock blur

₹2.8 L/yr - ₹9.5 L/yr

Production Engineer
496 salaries
unlock blur

₹1 L/yr - ₹6 L/yr

Explore more salaries
Compare Samvardhana Motherson Group with

Bharat Forge

3.8
Compare

Tata Motors

4.2
Compare

Mahindra & Mahindra

4.1
Compare

TVS Motor

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview