Execution of MS line, DI line, HDPE line involves proper planning, material selection, installation, and testing.
Plan the layout and route of the lines based on project requirements and specifications.
Select appropriate materials such as MS, DI, or HDPE based on factors like pressure rating, corrosion resistance, and cost.
Ensure proper installation of the lines including welding, jointing, and fittings.
Conduct pressure...
posted on 13 Dec 2022
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.
Eq...
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and other equ...
posted on 22 Dec 2021
I applied via Naukri.com and was interviewed before Dec 2020. There were 2 interview rounds.
Costing and budget of building
Costing and budgeting are crucial aspects of any building project
It involves estimating the cost of materials, labor, and other expenses
Creating a budget helps in managing the project and avoiding overspending
Regular monitoring and updating of the budget is necessary to ensure the project stays on track
Factors like inflation, unexpected expenses, and changes in scope can impact the budget
posted on 29 Nov 2024
I applied via Campus Placement and was interviewed before Nov 2023. There were 3 interview rounds.
Reasoning portion, quantitative aptitude portion
Technical group discussion
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
Question & Discussion about previous project, working methods,hindreces, management and other policies of previous companies.
The last company package was competitive and included various benefits.
Competitive salary
Health insurance
Retirement plan
Paid time off
Performance bonuses
based on 3 reviews
Rating in categories
Civil Engineer
22
salaries
| ₹3.3 L/yr - ₹6 L/yr |
Civil Site Engineer
22
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Site Engineer
20
salaries
| ₹3.4 L/yr - ₹6.2 L/yr |
Administration Manager
17
salaries
| ₹4.1 L/yr - ₹8.2 L/yr |
Senior Engineer
16
salaries
| ₹4 L/yr - ₹8.4 L/yr |
DLF
Sobha
Prestige Group
Godrej Properties