i
Modi Builders & Realtors
Filter interviews by
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I am a dedicated Civil Site Engineer with a strong background in construction management and project execution.
Experienced in overseeing site operations and ensuring compliance with safety regulations
Skilled in project planning, scheduling, and budget management
Proficient in using AutoCAD, Revit, and other design software
Strong communication and problem-solving skills
Completed successful projects like constructing a co
I am currently working at XYZ Construction Company as a Civil Site Engineer.
Working at XYZ Construction Company
Role: Civil Site Engineer
Responsibilities include overseeing construction projects, ensuring compliance with regulations, and managing site activities
I applied via Walk-in and was interviewed before Oct 2022. There were 4 interview rounds.
10 questions test which is about basic questions of civil engineering & construction
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
posted on 27 Jan 2024
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
posted on 14 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
The weight of green concrete varies depending on the mix design and components used.
The weight of green concrete typically ranges from 140 to 150 pounds per cubic foot.
Factors such as the type and amount of aggregates, cement, water, and admixtures used can affect the weight.
Lightweight concrete can have a lower weight, while high-density concrete can be heavier.
The weight of green concrete is important for structural
The formula for tensile strength of concrete is based on the cross-sectional area and maximum load applied.
Tensile Strength = Maximum Load / Cross-sectional Area
The units for tensile strength are typically in MPa (megapascals)
Tensile strength is an important property of concrete for determining its ability to resist tension forces
For example, if a concrete specimen with a cross-sectional area of 100 square millimeters ...
The water cement ratio of concrete refers to the ratio of the weight of water to the weight of cement used in a concrete mix.
The water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a typical water ce...
IS code of steel refers to the Indian Standard code for steel materials and products.
IS 2062:2011 - Steel for general structural purposes
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 8500:1991 - Structural steel - Microalloyed (medium and high strength qualities)
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I applied via Walk-in
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
based on 3 interviews
Interview experience
based on 7 reviews
Rating in categories
Civil Engineer
22
salaries
| ₹3.3 L/yr - ₹6 L/yr |
Civil Site Engineer
22
salaries
| ₹2.4 L/yr - ₹6.4 L/yr |
Site Engineer
21
salaries
| ₹3.4 L/yr - ₹6.2 L/yr |
Administration Manager
17
salaries
| ₹4.1 L/yr - ₹8.2 L/yr |
MEP Engineer
16
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim