When phase and neutral are connected, it creates a short circuit which can lead to damage to the electrical system and potential fire hazards.
Connecting phase and neutral directly can cause a short circuit
This can lead to overheating of wires and potential fire hazards
It can damage electrical appliances connected to the circuit
Proper insulation and wiring practices should be followed to prevent such incidents
Top trending discussions
I was interviewed in Dec 2021.
Discussed about previous job and experience
Online test and the final round
I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I was interviewed before Jul 2021.
I applied via Campus Placement and was interviewed before Jul 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Oct 2020. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 6 reviews
Rating in categories
Electrical Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Site Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Project Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Executive
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Cognizant
Teleperformance
iEnergizer
Reliance Retail