Field process refers to the activities and procedures carried out on-site during construction or maintenance of civil engineering projects.
Field process involves site preparation, excavation, foundation construction, structural erection, and finishing works.
It includes quality control inspections, material testing, and adherence to safety regulations.
Field process also involves coordination with subcontractors, supplie...
A transmission line is a specialized cable or other structure designed to carry electrical signals over long distances with minimal loss.
Transmits electrical signals over long distances
Minimizes signal loss
Used in telecommunications, power distribution, and networking
Examples include overhead power lines and fiber optic cables
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes used in construction.
BBS is essential for ensuring the correct quantity and placement of reinforcement bars in concrete structures.
It helps in estimating the required amount of steel reinforcement accurately.
BBS also aids in reducing wastage of materials and labor costs.
It is crucial for maintaining the str...
To calculate the quantity of cement, sand, and aggregate for 1 cu.m concrete, you need to know the mix ratio and bulk density of materials.
Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)
Calculate the volume of concrete required (1 cu.m in this case)
Calculate the quantity of cement, sand, and aggregate using the mix ratio and bulk density of materials
For example, if the mix ratio is 1:2:4 and ...
Megha Engineering & Infrastructures interview questions for designations
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
The weight of 16 mm dia steel of 1 m length is 1.58 kg.
The weight of steel can be calculated using the formula: weight = (d^2/162) * L, where d is the diameter in mm and L is the length in meters.
Substituting the values, we get weight = (16^2/162) * 1 = 1.58 kg.
This weight is for mild steel. The weight may vary for other types of steel.
The weight of steel is an important factor in construction and design calculations.
M-20 grade concrete weighs approximately 2400 kg per cubic meter.
M-20 grade concrete is a commonly used grade of concrete in construction.
The weight of M-20 grade concrete is determined by the density of its components.
The components of M-20 grade concrete include cement, sand, and coarse aggregates.
The weight of each component and their proportions determine the overall weight of 1 cubic meter of M-20 grade concrete.
T...
Concrete slump is the measure of consistency and workability of concrete.
Slump test is conducted to determine the consistency of freshly mixed concrete.
The minimum slump for concrete used in road construction is 25-50 mm.
The maximum slump for concrete used in heavily reinforced structures is 100-150 mm.
The slump value can be adjusted by adding water or admixtures to the concrete mix.
A higher slump value indicates a mor
Get interview-ready with Top Megha Engineering & Infrastructures Interview Questions
I applied via Job Fair and was interviewed before Nov 2021. There was 1 interview round.
A WTP flow diagram shows the process of water treatment and purification.
The flow diagram typically includes structures such as screens, sedimentation tanks, filters, and disinfection units.
Screens remove large debris and particles from the water.
Sedimentation tanks allow suspended particles to settle to the bottom.
Filters remove smaller particles and impurities.
Disinfection units use chemicals or UV light to kill bact...
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
Some of the top questions asked at the Megha Engineering & Infrastructures Civil Site Engineer interview for experienced candidates -
The duration of Megha Engineering & Infrastructures Civil Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 5 interviews
2 Interview rounds
based on 94 reviews
Rating in categories
Engineer
893
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
884
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
505
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
414
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
341
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company