Filter interviews by
I applied via Newspaper Ad and was interviewed in Nov 2023. There were 2 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.
Penetration test involves identifying vulnerabilities in a system or network.
It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.
The goal of a penetration test is to strengthen the security defenses of the system or network.
Common ...
Waterproofing is a process of making a structure or material resistant to the penetration of water.
Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.
It is commonly used in construction to protect buildings from water damage.
Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.
Types of foundation include shallow, deep, and pile foundations.
Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.
Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.
Pile foundations are deep foundations that consist of long, slender columns driven...
posted on 29 Nov 2024
I applied via Campus Placement and was interviewed before Nov 2023. There were 3 interview rounds.
Reasoning portion, quantitative aptitude portion
Technical group discussion
posted on 12 Jul 2023
I applied via Walk-in
In these round we just screening the students for next round GD is the process in which we just see the attitude, discipline and how they expressed there idea towards the topic that we give to them.
I have more knowledge in structural engineering.
Specialization in structural analysis and design
Extensive experience in designing buildings, bridges, and other structures
Knowledge of various materials and construction techniques
Familiarity with relevant codes and standards
Ability to perform structural calculations and simulations
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
posted on 14 May 2024
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
Kis co. Me kya kya kaam kiya
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
Execution of MS line, DI line, HDPE line involves proper planning, material selection, installation, and testing.
Plan the layout and route of the lines based on project requirements and specifications.
Select appropriate materials such as MS, DI, or HDPE based on factors like pressure rating, corrosion resistance, and cost.
Ensure proper installation of the lines including welding, jointing, and fittings.
Conduct pressure...
posted on 13 Dec 2022
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.
Eq...
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and other equ...
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To start OFC cable blowing, follow these steps
Ensure that the ducts are clean and free of any obstruction
Attach the cable blowing machine to the duct
Connect the cable to the machine and start the blowing process
Monitor the cable's progress and adjust the machine's speed as needed
Once the cable has been blown through the entire length of the duct, detach the machine and cable
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
based on 1 review
Rating in categories
Civil Site Engineer
12
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
Site Engineer
11
salaries
| ₹2.2 L/yr - ₹6.2 L/yr |
Junior Manager
8
salaries
| ₹5.7 L/yr - ₹9.6 L/yr |
Senior Engineer
6
salaries
| ₹4.9 L/yr - ₹9 L/yr |
Electrical Engineer
6
salaries
| ₹3.9 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company