Critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Critical path helps in identifying the tasks that are crucial for the project timeline.
It determines the minimum amount of time needed to complete a project.
Any delay in tasks on the critical path will directly impact the project's completion date.
Activities on the critical path have...
Gantt chart is a visual tool used in project management to schedule, track, and manage tasks and resources.
Helps in planning and scheduling tasks
Shows dependencies between tasks
Tracks progress and deadlines
Allocates resources efficiently
Commonly used in construction projects, software development, event planning, etc.
I applied via Approached by Company and was interviewed in Dec 2021. There were 2 interview rounds.
A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.
Transformers are used to increase or decrease the voltage of an alternating current (AC) power supply.
They consist of two coils of wire, known as the primary and secondary windings, which are wrapped around a magnetic core.
When an AC voltage is applied to the primary winding, it creates a...
DG systems are backup power systems that provide electricity during power outages. Load calculation is based on the power requirements of the building.
DG systems are commonly used in buildings that require uninterrupted power supply, such as hospitals, data centers, and airports.
Load calculation involves determining the power requirements of the building, including the number of electrical devices and their power consu...
I applied via Naukri.com and was interviewed before Jul 2021. There was 1 interview round.
To prepare a baseline schedule, identify all project activities, sequence them, estimate durations, and assign resources.
Identify all project activities
Sequence the activities in logical order
Estimate the duration of each activity
Assign resources to each activity
Develop a network diagram
Calculate the critical path
Set the baseline start and finish dates
Update the schedule regularly
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
Very easy
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
MEP Site Engineer
3
salaries
| ₹6.6 L/yr - ₹7.2 L/yr |
TCS
Accenture
Wipro
Cognizant