I applied via Naukri.com and was interviewed before Jul 2021. There was 1 interview round.
To prepare a baseline schedule, identify all project activities, sequence them, estimate durations, and assign resources.
Identify all project activities
Sequence the activities in logical order
Estimate the duration of each activity
Assign resources to each activity
Develop a network diagram
Calculate the critical path
Set the baseline start and finish dates
Update the schedule regularly
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
Critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Critical path helps in identifying the tasks that are crucial for the project timeline.
It determines the minimum amount of time needed to complete a project.
Any delay in tasks on the critical path will directly impact the project's completion date.
Activities on the critical path have...
Gantt chart is a visual tool used in project management to schedule, track, and manage tasks and resources.
Helps in planning and scheduling tasks
Shows dependencies between tasks
Tracks progress and deadlines
Allocates resources efficiently
Commonly used in construction projects, software development, event planning, etc.
I applied via Approached by Company and was interviewed in Dec 2021. There were 2 interview rounds.
A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.
Transformers are used to increase or decrease the voltage of an alternating current (AC) power supply.
They consist of two coils of wire, known as the primary and secondary windings, which are wrapped around a magnetic core.
When an AC voltage is applied to the primary winding, it creates a...
DG systems are backup power systems that provide electricity during power outages. Load calculation is based on the power requirements of the building.
DG systems are commonly used in buildings that require uninterrupted power supply, such as hospitals, data centers, and airports.
Load calculation involves determining the power requirements of the building, including the number of electrical devices and their power consu...
Top trending discussions
I appeared for an interview in Aug 2020.
Developed a real-time data processing system for a financial institution
Implemented a distributed system using Apache Kafka and Apache Storm
Designed a fault-tolerant architecture with multiple redundancy layers
Optimized the system for high throughput and low latency
Provided real-time monitoring and alerting using Grafana and Prometheus
posted on 14 Oct 2021
I applied via Walk-in and was interviewed before Oct 2020. There were 5 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jun 2019. There were 4 interview rounds.
Answering questions related to Spring Boot and core Java
Spring Boot addons include Spring Security, Spring Data, and Spring Cloud
Spring Boot is a framework for building standalone, production-grade Spring-based applications
Ways of configuring a bean in Spring include XML configuration, Java-based configuration, and annotation-based configuration
Core Java topics include OOP concepts, collections, multithreading, and exc
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Oct 2020. There was 1 interview round.
I applied via Other and was interviewed before Apr 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
MEP Site Engineer
3
salaries
| ₹6.6 L/yr - ₹7.2 L/yr |
TCS
Accenture
Wipro
Cognizant