Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by M3M India Team. If you also belong to the team, you can get access from here

M3M India Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

M3M India Interview Questions, Process, and Tips for Experienced

Updated 7 Mar 2025

Top M3M India Interview Questions and Answers for Experienced

View all 33 questions

M3M India Interview Experiences for Experienced

Popular Designations

28 interviews found

Senior Engineer Interview Questions & Answers

user image Raushan kumar

posted on 7 Mar 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Feb 2025.

Round 1 - Technical 

(3 Questions)

  • Q1. Basic fundamentals of plumbing and fire fighting system.
  • Q2. Fire pump room single line diagram and working.
  • Q3. Fire pump technical data sheet detail.
Round 2 - Group Discussion 

Plumbing and fire fighting NBC code Standard etc.

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion.
  • Q2. Why to join our organisation.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Introduction of the candidate
  • Q2. Past experience
  • Q3. Not missed anything as of now
Round 2 - One-on-one 

(2 Questions)

  • Q1. Past experience
  • Q2. Regarding events

Project Engineer Interview Questions & Answers

user image AKASH THAKUR

posted on 15 Nov 2024

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(6 Questions)

  • Q1. What is your current job role & responsibility?
  • Q2. How to manage site as a project engineer.
  • Ans. 

    A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.

    • Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.

    • Monitor progress and quality of construction activities to meet project deadlines.

    • Ensure compliance with safety regulations and quality standards.

    • Resolve any issues o...

  • Answered by AI
  • Q3. How much number of slab to give in one months.
  • Ans. 

    The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.

    • Consider the project timeline and deadlines for completion

    • Evaluate the size and complexity of the slabs to determine production rate

    • Assess the availability of resources such as manpower and equipment

    • Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...

  • Answered by AI
  • Q4. What is the mivan shuttering.
  • Ans. 

    Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.

    • Mivan shuttering is a fast-paced construction technique.

    • It involves setting up aluminum formwork to create the structure of walls and slabs.

    • The formwork is reusable and can be quickly assembled and dismantled.

    • Mivan shuttering results in smooth finishes on concrete surfaces.

    • It is commonly used in high-rise buildings and

  • Answered by AI
  • Q5. Types of cement grade and which grade used in M70.
  • Ans. 

    Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.

    • Types of cement grades: OPC, PPC, PSC, etc.

    • M70 grade usually uses OPC cement.

    • OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.

  • Answered by AI
  • Q6. How much experience you have in high rise building.
Round 2 - HR 

(4 Questions)

  • Q1. What is your current salary?
  • Ans. 

    I am currently earning a competitive salary based on my experience and qualifications.

    • My current salary is in line with industry standards.

    • I am open to discussing salary expectations for this role.

    • I believe my compensation reflects my skills and contributions to my current employer.

  • Answered by AI
  • Q2. How much deduction in PF.
  • Ans. 

    The deduction in PF varies based on the employee's salary and the company's policy.

    • PF deduction is typically a percentage of the employee's basic salary

    • The current rate of PF deduction is 12% of the basic salary

    • Some companies may choose to match the employee's contribution to PF

    • Employees can also choose to contribute more than the mandatory 12%

  • Answered by AI
  • Q3. Your expectation salary breakup.
  • Q4. Provide last 3 months salary slips and other documents.

Interview Preparation Tips

Interview preparation tips for other job seekers - Before go to the interview in M3M you should clear the current job responsibility and all technical knowledge related your field.

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (11)

Senior Project Engineer Interview Questions & Answers

user image Shalendra Saxena

posted on 22 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the weight of 12 mm ply as per is code?
  • Ans. 

    The weight of 12 mm ply as per IS code varies depending on the type of wood used.

    • The weight of 12 mm ply can range from 22 to 30 kg per sheet.

    • The weight can also vary based on the density of the wood used.

    • IS code may specify a range of acceptable weights for 12 mm ply.

  • Answered by AI
  • Q2. What is the weight of steel?
  • Ans. 

    The weight of steel varies depending on the type and dimensions of the steel.

    • The weight of steel is typically measured in pounds or kilograms.

    • The weight of steel can range from 7.85 g/cm³ for mild steel to 8.05 g/cm³ for high-strength steel.

    • The weight of a specific piece of steel can be calculated by multiplying its volume by its density.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for technical knowledge better

Senior Project Engineer Interview Questions asked at other Companies

Q1. Types of road:- 1 Flexible pavements .... .. . 2 Rigid pavements Flexible pavement:- embankment thickness 3m,large size soil particles 75mm lumps and cloud. Liquid limit <50% ,plastic limit<25%, swelling and shrnkag<50%, cbr as per... read more
View answer (2)

M3M India interview questions for popular designations

 Senior Project Engineer

 (3)

 Network Support Engineer

 (2)

 Project Engineer

 (2)

 Assistant Manager

 (2)

 Senior Project Engineer Civil

 (2)

 Accountant

 (1)

 Senior Engineer

 (1)

 Sales

 (1)

Senior Quality Engineer Interview Questions & Answers

user image Dilip Kumar Upadhaya

posted on 4 Aug 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. IS code , which is mostly used at construction site
  • Q2. Types of test , perform at site before , during and post of work
  • Ans. 

    Types of tests conducted before, during, and after work at a site include pre-construction testing, in-process testing, and post-construction testing.

    • Pre-construction testing: soil testing, environmental impact assessments

    • In-process testing: quality control checks, material testing

    • Post-construction testing: structural integrity testing, final inspection

  • Answered by AI
  • Q3. What is snagging, What points check in snagging as a quality engineer
  • Ans. 

    Snagging is the process of identifying and rectifying defects or issues in a construction project before completion.

    • Inspecting the construction site for any defects or issues

    • Checking for quality of materials used

    • Ensuring compliance with building codes and regulations

    • Creating a snagging report detailing all identified issues

    • Coordinating with contractors to address and rectify the snagged items

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Total experience
  • Q2. Salary negotiation

Interview Preparation Tips

Topics to prepare for M3M India Senior Quality Engineer interview:
  • Is code
  • Material Testing
  • Quality Control
  • Snagging
Interview preparation tips for other job seekers - Before giving interview we should memorize all the technical answers which we use on the site like sand test, cement test, reinforcement test, cube test, brick test etc. because mainly these questions are asked.

Senior Quality Engineer Interview Questions asked at other Companies

Q1. what is least count of vernier caliper ,micrometer, height gauge?
View answer (13)

Get interview-ready with Top M3M India Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What's the density of steel.
  • Ans. 

    The density of steel is approximately 7.85 g/cm^3.

    • The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).

    • The density of steel can vary slightly depending on the specific alloy and composition.

    • For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.

  • Answered by AI
  • Q2. Please clear RCC and shuttering checklist point.

Civil Structural Engineer Interview Questions asked at other Companies

Q1. Metric chain lenth and links how much lenth of a link?
View answer (2)

Senior Project Engineer Interview Questions & Answers

user image Aman Pratap Singh

posted on 20 Dec 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Structure steel
  • Q2. Interior work

Senior Project Engineer Interview Questions asked at other Companies

Q1. Types of road:- 1 Flexible pavements .... .. . 2 Rigid pavements Flexible pavement:- embankment thickness 3m,large size soil particles 75mm lumps and cloud. Liquid limit <50% ,plastic limit<25%, swelling and shrnkag<50%, cbr as per... read more
View answer (2)

Interview Questions & Answers

user image Anonymous

posted on 26 Nov 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Personally discussion
  • Q2. Reason for reliving the current company
  • Ans. 

    Seeking better growth opportunities and professional development.

    • Limited growth prospects in current company

    • Lack of challenging projects

    • Desire for a more supportive and collaborative work environment

    • Opportunity to learn new skills and expand knowledge

    • Seeking better work-life balance

  • Answered by AI
  • Q3. Qualification discussion
Round 3 - Technical 

(7 Questions)

  • Q1. Plot area sqm2 or sqft.
  • Ans. 

    The question asks for the measurement unit of the plot area.

    • The question is asking whether the plot area should be measured in square meters or square feet.

    • The answer should specify the preferred unit of measurement for the plot area.

    • Examples of possible answers: 'sqm2' for square meters or 'sqft' for square feet.

  • Answered by AI
  • Q2. One pour area concrete quantity
  • Ans. 

    The quantity of concrete required for one pour area.

    • Calculate the volume of the pour area by multiplying the length, width, and depth of the area.

    • Convert the volume to cubic meters or cubic feet depending on the unit of measurement used.

    • Consider adding a wastage factor to account for any material loss during the pouring process.

    • Consult the concrete supplier or use a concrete calculator to determine the exact quantity n...

  • Answered by AI
  • Q3. Total staff and reporting
  • Q4. Project one pour steel quantity
  • Ans. 

    The project requires determining the quantity of steel needed for the first pour.

    • Calculate the volume of concrete required for the first pour.

    • Determine the reinforcement ratio for the concrete.

    • Multiply the volume of concrete by the reinforcement ratio to get the steel quantity.

    • Consider any additional factors such as wastage or safety margins.

  • Answered by AI
  • Q5. Concrete casting manpower requirement
  • Ans. 

    The manpower requirement for concrete casting depends on various factors such as project size, complexity, and timeline.

    • Manpower requirement for concrete casting is determined by the volume of concrete to be cast.

    • The complexity of the concrete structure also affects the manpower requirement.

    • The timeline of the project plays a crucial role in determining the number of workers needed.

    • Additional factors like the availabil...

  • Answered by AI
  • Q6. Cube tank temperature
  • Ans. 

    The cube tank temperature refers to the temperature inside a cube-shaped tank.

    • Cube tank temperature is the temperature inside a cube-shaped tank.

    • It is important to monitor the temperature in cube tanks to ensure optimal conditions for the contents.

    • The temperature can be controlled through various means such as heating or cooling systems.

    • Examples of cube tanks include water storage tanks, fermentation tanks, and chemica

  • Answered by AI
  • Q7. Concrete temperature

Interview Questions & Answers

user image Anonymous

posted on 30 Aug 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Technical knowledge and experience
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Ready to locate for panipat
  • Ans. 

    Yes, I am ready to locate for Panipat.

    • I am willing to relocate to Panipat for the Senior Planning Manager position.

    • I understand the importance of being physically present in the location for effective planning and management.

    • I have researched about Panipat and its industrial landscape, which aligns with my expertise.

    • I am excited about the opportunity to contribute to the growth and success of the company in Panipat.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. How you know about planning and how is your contribution

Interview Preparation Tips

Topics to prepare for M3M India Senior Manager Planning interview:
  • Planning
  • Schedule
  • Budgeting
  • Costing
  • Productivity

Senior Manager Planning Interview Questions asked at other Companies

Q1. If there are 3 people out of which 1 has sales quality, 1 has knowledge about peoduct and 1 can do both well, whom should I pick
View answer (1)

M3M India Interview FAQs

How many rounds are there in M3M India interview for experienced candidates?
M3M India interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the M3M India interview process for experienced candidates are Technical, One-on-one Round and HR.
How to prepare for M3M India interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at M3M India. The most common topics and skills that interviewers at M3M India expect are Civil Engineering, Real Estate Sales, Project Management, Sales Planning and Budgeting.
What are the top questions asked in M3M India interview for experienced candidates?

Some of the top questions asked at the M3M India interview for experienced candidates -

  1. What are the reasons of delay in a construction proje...read more
  2. What is snagging, What points check in snagging as a quality engin...read more
  3. What is standard deviation for M30 grade concrete as IS 456.2...read more
How long is the M3M India interview process?

The duration of M3M India interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

M3M India Interview Process for Experienced

based on 19 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 128 Interviews
Lodha Group Interview Questions
4.0
 • 126 Interviews
DLF Interview Questions
3.9
 • 75 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Puravankara Interview Questions
3.7
 • 19 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

M3M India Reviews and Ratings

based on 610 reviews

4.0/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

4.2

Salary

3.5

Job security

3.7

Company culture

3.7

Promotions

3.7

Work satisfaction

Explore 610 Reviews and Ratings
Assistant Manager
167 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
92 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
85 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
60 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare M3M India with

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview