Filter interviews by
The technical point of view in civil engineering involves analyzing and solving complex problems related to infrastructure and construction.
Civil engineers use their technical expertise to design and construct buildings, bridges, roads, and other infrastructure projects.
They analyze the structural integrity of buildings and ensure they meet safety standards.
Civil engineers also consider environmental factors and sustai...
Top trending discussions
posted on 25 Jan 2025
Role of engineer to control disaster management
posted on 29 Nov 2021
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
Before casting a tower foundation, several things need to be checked to ensure its stability and durability.
Check the soil condition and bearing capacity
Ensure proper reinforcement and formwork
Verify the dimensions and alignment of the foundation
Check for any obstructions or utilities in the excavation area
Ensure proper curing of the concrete
Verify compliance with local building codes and regulations
Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.
Measure the length and depth of the foundation
Measure the width at both ends and find the average width
Multiply the average width by the length and depth to get the volume
Calculate the quantity by multiplying the volume with the unit weight of concrete
posted on 6 Feb 2025
posted on 27 Jan 2025
posted on 6 May 2024
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Civil engineers work with a variety of materials including concrete, steel, asphalt, and wood.
Common materials used in civil engineering include concrete, steel, asphalt, wood, and aggregates.
Concrete is used for foundations, roads, and structures.
Steel is used for beams, columns, and reinforcement.
Asphalt is used for roads and pavements.
Wood is used for formwork, bridges, and buildings.
Aggregates are used in concrete
posted on 23 Feb 2024
posted on 31 Dec 2023
The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.
Prepare the surface by ensuring it is clean, level, and dry.
Apply adhesive to the surface using a trowel, ensuring even coverage.
Lay the tiles/granite starting from the center and working outwards in a pattern.
Grout the tiles/granite by filling the gaps between them with grout and ...
based on 2 reviews
Rating in categories
Deputy Manager
47
salaries
| ₹8.2 L/yr - ₹17 L/yr |
Manager
25
salaries
| ₹13.1 L/yr - ₹24.3 L/yr |
Assistant Manager
24
salaries
| ₹6.4 L/yr - ₹14 L/yr |
Senior Manager
24
salaries
| ₹13 L/yr - ₹34 L/yr |
Electrical Engineer
20
salaries
| ₹2.4 L/yr - ₹6.3 L/yr |
Sterling & Wilson
Adani Green Energy
Azure Power
ReNew