i
Lumax Industries
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 3 interview rounds.
Cad test on catia software.
Preventing plastic defects involves proper material selection, design optimization, and quality control measures.
Selecting the right type of plastic for the application
Optimizing the design to minimize stress concentrations
Implementing proper molding techniques and parameters
Conducting thorough quality control inspections
Addressing any issues promptly to prevent defects from recurring
Design considerations for plastic components include material selection, manufacturability, functionality, aesthetics, and cost.
Material selection based on properties like strength, flexibility, and chemical resistance
Consideration of manufacturability, such as moldability and ease of assembly
Ensuring functionality requirements are met, such as mechanical strength or thermal resistance
Aesthetics like color, texture, an...
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
Aptitude test simple one..very easy
Top trending discussions
I applied via Approached by Company and was interviewed before Jan 2022. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Dec 2021. There were 8 interview rounds.
Programming of CNC VMC involves creating instructions for the machine to follow in order to produce a specific part.
Requires knowledge of programming languages such as G-code and M-code
Involves creating a step-by-step process for the machine to follow
Requires understanding of the machine's capabilities and limitations
May involve creating custom tool paths for specific parts
Examples include programming a CNC VMC to prod...
The code of machining for making a program involves creating instructions for a machine to follow in order to produce a desired output.
The program should include specific instructions for the machine to follow, such as tool selection, cutting speed, and feed rate.
The code should be optimized for efficiency and accuracy.
It is important to consider the material being machined and adjust the program accordingly.
Testing an...
Given a problem for solving on shop floor
Group discussion with team of production and plant head
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
I applied via Approached by Company
I applied via Naukri.com and was interviewed in Jul 2022. There was 1 interview round.
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Assistant Engineer
384
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Assistant Manager
324
salaries
| ₹4.6 L/yr - ₹12 L/yr |
Engineer
311
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Senior Engineer
220
salaries
| ₹3.4 L/yr - ₹10.5 L/yr |
Oprating Engineer
162
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Ceat Tyres
UNO Minda
Apollo Tyres
Exide Industries