I approach mould assembly and disassembly challenges with careful planning, attention to detail, and effective communication.
Thoroughly review assembly instructions and schematics before starting the process.
Use appropriate tools and techniques to avoid damaging the mould components.
Implement a systematic approach, such as labeling parts during disassembly for easier reassembly.
Conduct regular maintenance checks on mou...
Handling challenges in hot runner molds involves optimizing temperature control, maintenance, and troubleshooting techniques.
Ensure proper temperature control: Use thermocouples to monitor and adjust temperatures for consistent melt flow.
Regular maintenance: Schedule routine checks on heating elements and insulation to prevent overheating and failures.
Troubleshooting flow issues: Analyze flow patterns and adjust gate s...
I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Sep 2021. There was 1 interview round.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
OEE stands for Overall Equipment Effectiveness and is a measure of manufacturing productivity.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability measures the percentage of time the equipment is available for production.
Performance measures the speed of the equipment compared to its ideal speed.
Quality measures the percentage of good quality products produced.
OEE = Availabil...
Programming a part to turn
Identify the type of part and its intended function
Determine the required angle and speed of rotation
Select an appropriate programming language and platform
Write and test the code to ensure proper functionality
I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
based on 1 interview
Interview experience
based on 25 reviews
Rating in categories
Assistant Engineer
387
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Assistant Manager
330
salaries
| ₹4.6 L/yr - ₹12.5 L/yr |
Engineer
313
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Senior Engineer
222
salaries
| ₹3.4 L/yr - ₹9 L/yr |
Deputy Manager
163
salaries
| ₹6 L/yr - ₹17 L/yr |
Ceat Tyres
UNO Minda
Apollo Tyres
Exide Industries