i
Lodha Group
Filter interviews by
I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
Top trending discussions
posted on 2 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
Estimation and costing of materials is a crucial aspect of civil engineering projects.
Estimation involves calculating the quantity of materials required for a project
Costing involves determining the cost of these materials
Factors such as market rates, transportation costs, and taxes must be considered
Software such as AutoCAD and Excel can be used for accurate estimation and costing
Regular updates and adjustments must b...
posted on 2 Dec 2024
posted on 30 Dec 2022
I appeared for an interview in Nov 2022.
posted on 12 Sep 2022
posted on 15 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
posted on 4 Apr 2025
I appeared for an interview in Oct 2024, where I was asked the following questions.
Extensive experience in civil construction, focusing on project management, quality control, and team collaboration.
Managed multiple large-scale construction projects, ensuring timely completion and adherence to budget constraints.
Implemented quality control measures that reduced rework by 20%, enhancing overall project efficiency.
Collaborated with architects and engineers to optimize design plans, resulting in a 15% c...
Tile flooring involves selecting, preparing, and installing tiles for aesthetic and functional purposes in flats.
Choose the right type of tile: ceramic, porcelain, vinyl, or natural stone.
Prepare the subfloor: ensure it's clean, dry, and level.
Use appropriate adhesive: thin-set mortar for most tiles, mastic for vinyl.
Measure and plan layout: start from the center for symmetry.
Cut tiles as needed: use a tile cutter or w...
Snagging and de-snagging involve identifying and rectifying defects in newly constructed flats before handover.
Snagging is the process of inspecting a property for defects or unfinished work.
Common snags include paint imperfections, misaligned doors, and plumbing issues.
De-snagging refers to the rectification of identified issues before final handover.
For example, if a window doesn't close properly, it would be noted d...
Some of the top questions asked at the Lodha Group Civil Site Engineer interview for experienced candidates -
based on 1 interview
Interview experience
based on 29 reviews
Rating in categories
Associate Manager
369
salaries
| ₹5.4 L/yr - ₹13 L/yr |
Deputy Manager
324
salaries
| ₹6.5 L/yr - ₹16.6 L/yr |
Manager
221
salaries
| ₹9 L/yr - ₹24 L/yr |
Sales Executive
219
salaries
| ₹2 L/yr - ₹11 L/yr |
Senior Executive
212
salaries
| ₹3.9 L/yr - ₹10.5 L/yr |
JLL
CBRE
NoBroker
Cushman & Wakefield