The process for laying a water pipeline involves planning, excavation, laying the pipe, connecting fittings, testing, backfilling, and restoration.
Plan the route of the pipeline to determine the best path and avoid obstacles.
Excavate the trench along the planned route to the required depth and width.
Lay the pipe in the trench, ensuring proper alignment and grade.
Connect fittings such as valves, bends, and couplings to ...
Top trending discussions
Slump test is a method to measure the workability of concrete by observing the consistency and flow of the concrete mix.
Prepare a slump cone by lubricating the inside surface and placing it on a smooth, flat surface.
Fill the cone with concrete in three layers, each layer tamped with a rod 25 times.
Remove excess concrete, level the top, and lift the cone vertically. Measure the slump of the concrete.
Record the slump mea...
To fill a cube, ensure all sides are properly aligned and filled with the material. Check for any gaps or air pockets.
Ensure the cube mold is clean and dry before filling.
Pour the material into the mold slowly and evenly to prevent air pockets.
Use a vibrating table to help settle the material and remove any air bubbles.
Check for any leaks or cracks in the mold before filling to prevent material from leaking out.
After f...
posted on 12 Oct 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
Quality lab and site test of concrete involves testing the strength, durability, and consistency of concrete samples.
Quality lab tests include compressive strength test, slump test, air content test, and temperature test.
Site tests involve sampling concrete from the construction site, conducting field tests like slump test and air content test, and monitoring curing conditions.
Quality engineers ensure that concrete mee...
posted on 11 Dec 2023
I applied via Referral
posted on 3 May 2023
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
Assistant Highway Engineer
34
salaries
| ₹3.2 L/yr - ₹6 L/yr |
Assistant Bridge Engineer
23
salaries
| ₹3.2 L/yr - ₹6 L/yr |
Site Engineer
17
salaries
| ₹4.4 L/yr - ₹7 L/yr |
Quantity Surveyor
15
salaries
| ₹5 L/yr - ₹7.6 L/yr |
Field Engineer
15
salaries
| ₹2.3 L/yr - ₹6 L/yr |
TCS
Infosys
Wipro
Tech Mahindra