Filter interviews by
I was interviewed in Jul 2024.
I applied via Campus Placement and was interviewed in Feb 2021. There were 3 interview rounds.
Top trending discussions
Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.
Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)
Current rating is determined by factors such as conductor size, insulation material, and ambien...
The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.
Client: Company A
Scope of work: Development of new software system
Cost: $100,000
Technical parameters: Integration with existing systems, timeline of 6 months
Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.
Types of substations include distribution substations, transmission substations, and switching substations.
Distribution substations typically step down voltage for local distribution to customers.
Transmission substations step up voltage for long-distanc...
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
Process about new development involves planning, designing, testing, and implementing innovative ideas or products.
Researching market trends and customer needs
Creating a detailed project plan
Collaborating with cross-functional teams
Testing prototypes and gathering feedback
Iterating on designs based on feedback
Launching the new product or service
MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.
MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.
Control Plan is a detailed document outlining the steps to maintain quality control in production processes.
MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.
Con...
7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.
Check Sheet: Used to collect and analyze data in an organized manner.
Histogram: Represents data distribution visually to identify patterns and trends.
Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.
Cause and Effect Diagram (Fishbone Diagram): Identifies root ...
posted on 6 May 2024
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
Math, reasoning, English, Tecnical
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 10 reviews
Rating in categories
Assistant Manager
47
salaries
| ₹5.5 L/yr - ₹12.1 L/yr |
Deputy Manager
39
salaries
| ₹8 L/yr - ₹13.4 L/yr |
Senior Engineer
24
salaries
| ₹4.4 L/yr - ₹8.7 L/yr |
Engineer
22
salaries
| ₹4 L/yr - ₹6.4 L/yr |
Manager
19
salaries
| ₹9.8 L/yr - ₹16 L/yr |
NTPC
Adani Power
Tata Power
Reliance Power