Upload Button Icon Add office photos

L&T–MHI Power Boilers

Compare button icon Compare button icon Compare

Filter interviews by

L&T–MHI Power Boilers Interview Questions, Process, and Tips

Updated 13 Feb 2025

Top L&T–MHI Power Boilers Interview Questions and Answers

View all 11 questions

L&T–MHI Power Boilers Interview Experiences

Popular Designations

9 interviews found

Interview Questions & Answers

user image Anonymous

posted on 13 Feb 2025

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Aptitude Test 

Its moderate if you are above average. You can easily crack it.

Round 2 - One-on-one 

(1 Question)

  • Q1. People are not showing respect to candidate come for interview..
Round 3 - HR 

(1 Question)

  • Q1. HR will never tell you truth about company policy. Not negotiable for salary.

Interview Preparation Tips

Interview preparation tips for other job seekers - If you get job in maintenance, Service, store , procurement then only come.
Never come for Production..
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Number of 20 engine part's
  • Ans. 

    The number of 20 engine parts is not specified in the question.

    • The question does not provide any specific information about the number of 20 engine parts.

    • It is unclear how many 20 engine parts are being referred to in the question.

    • Without additional context or data, it is impossible to determine the number of 20 engine parts.

  • Answered by AI
  • Q2. What is reverse heat engine
  • Ans. 

    A reverse heat engine is a device that converts work into heat.

    • It operates in the opposite direction of a traditional heat engine, converting work input into heat output.

    • Examples include refrigerators, air conditioners, and heat pumps.

    • It follows the second law of thermodynamics, which states that heat cannot flow from a colder body to a hotter body without the input of work.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Study well what you have ncluded in resume

Graduate Trainee Interview Questions asked at other Companies

Q1. Given an array, how do you get the count of pairs that sum to even
View answer (8)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

It was about 2 hours aptitude, reasoning and domain type question (total 120 question), paper was held online on laptop

Round 3 - Technical 

(4 Questions)

  • Q1. It was panel of 4 people Taking interview, first they asked me to tell about myself then started asking about my internship which I did in Delhi metro and at last they asked some questions from steel desig...
  • Q2. What is connection and joints in steel design
  • Ans. 

    Connections and joints are important aspects of steel design that ensure stability and strength of the structure.

    • Connections refer to the way steel members are joined together to form a structure.

    • Joints are the points where two or more members meet.

    • Proper connection and joint design is crucial for ensuring the safety and stability of the structure.

    • Examples of connections include bolted connections, welded connections, ...

  • Answered by AI
  • Q3. How boring of pile is done(from my internship)
  • Q4. What are various test done on site?
  • Ans. 

    Various tests are done on site to ensure quality and safety of construction work.

    • Soil testing to determine the bearing capacity of the soil

    • Concrete testing to check its strength and durability

    • Water testing to ensure it is safe for construction purposes

    • Asphalt testing to determine its quality and suitability for use

    • Non-destructive testing to detect defects in structures without damaging them

    • Load testing to check the str...

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Hr interview was quite friendly, they asked some casual question like about my family, aim and future goals, where do you live?,

Interview Preparation Tips

Topics to prepare for L&T–MHI Power Boilers Junior Engineer Trainee interview:
  • Steel design
  • Autocad
  • Engineering drawings
  • Concrete technology
Interview preparation tips for other job seekers - I'll just recommend you to make sure you hold strong grip on reasoning and aptitude ability that will be absolutely keypoint to Crack any exam even though you're not good at domain subjects, and for interview just be confident and don't worry too much about mistakes everyone does... Just go ahead

Junior Engineer Trainee Interview Questions asked at other Companies

Q1. How can be the powerfactor improved?
View answer (14)

Planning Engineer Interview Questions & Answers

user image Raviranjan Singh

posted on 17 Feb 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Previous company working style and culture
  • Q2. SAP modules and material you have worked and tool used
  • Ans. 

    I have worked with SAP modules such as MM, PM, and PS. I have used tools like Primavera P6 and Microsoft Project.

    • Worked with SAP MM (Materials Management) module for procurement and inventory management

    • Experience with SAP PM (Plant Maintenance) module for maintenance planning and scheduling

    • Utilized SAP PS (Project System) module for project planning and tracking

    • Used Primavera P6 and Microsoft Project for project schedu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Write only what you know in CV.

Skills evaluated in this interview

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

L&T–MHI Power Boilers interview questions for popular designations

 Planning Engineer

 (1)

 Junior its Engineer

 (1)

 Quality Engineer

 (1)

 Graduate Trainee

 (1)

 Junior Engineer Trainee

 (1)

 Mechanical Engineer

 (1)

 Mechanical Engg. Design

 (1)

 Senior Planning Engineer

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I was interviewed in Oct 2023.

Round 1 - Group Discussion 

Experiences related question answer

Round 2 - HR 

(3 Questions)

  • Q1. Qualification and experience
  • Q2. Salary discussion
  • Q3. How much pakage making good progress
  • Ans. 

    The progress of package making is good and on track.

    • The package making process is meeting its milestones and deadlines.

    • Quality checks are being conducted regularly to ensure high standards are maintained.

    • Efficiency in the packaging process has improved, leading to faster production.

    • Feedback from customers and stakeholders has been positive regarding the packaging.

    • Any issues or delays in the packaging process are being

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion done

Interview Preparation Tips

Interview preparation tips for other job seekers - What is your criteria and which type readyness have you done

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

Get interview-ready with Top L&T–MHI Power Boilers Interview Questions

Interview Questionnaire 

4 Questions

  • Q1. How many experience do you have?
  • Q2. Where use Pryte Pete?
  • Q3. How many coating outer side walls ?
  • Ans. 

    The number of coating outer side walls depends on the specific engineering project and its requirements.

    • The number of coating outer side walls varies depending on the type of structure being built.

    • For example, a building may have one or multiple coating layers on its outer walls.

    • The number of coating layers may also depend on the climate and environmental factors of the location.

    • The engineer must determine the appropri...

  • Answered by AI
  • Q4. Can you describe the drawing?
  • Ans. 

    I'm sorry, I cannot answer this question as there is no drawing provided.

    • Answered by AI

    Junior its Engineer Interview Questions asked at other Companies

    Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities to the Junior engineer.
    View answer (2)

    Interview Questionnaire 

    3 Questions

    • Q1. 1. Draw Centrifugal pump performance curve
    • Ans. 

      A centrifugal pump performance curve shows the relationship between flow rate and head developed by the pump.

      • The curve is typically plotted with flow rate on the x-axis and head on the y-axis.

      • The curve is generated by testing the pump at various flow rates and measuring the resulting head.

      • The curve can be used to determine the operating point of the pump and its efficiency.

      • The curve can also show the pump's maximum flo...

    • Answered by AI
    • Q2. 2. How to calculate air requirement for combustion..?
    • Ans. 

      Air requirement for combustion can be calculated using stoichiometry and fuel properties.

      • Determine the stoichiometric air-to-fuel ratio

      • Determine the fuel properties such as heating value and molecular weight

      • Calculate the mass flow rate of fuel

      • Calculate the mass flow rate of air using the stoichiometric ratio

      • Adjust for excess air if necessary

    • Answered by AI
    • Q3. What is the Function of coal feeder.?
    • Ans. 

      Coal feeder is used to supply coal to the coal pulverizer in the power generation process.

      • Coal feeder regulates the amount of coal to be supplied into the coal pulverizer.

      • It ensures a constant supply of coal to the pulverizer.

      • The coal feeder controls the coal flow rate and ensures that there is an adequate supply of coal to maintain the required steam generation rate.

      • It helps in improving the efficiency of the combusti...

    • Answered by AI

    Mechanical Engg. Design Interview Questions asked at other Companies

    Q1. What are the Drawing softwares you're aware of And How much relevant experience you have in for each software
    View answer (3)

    I applied via Naukri.com and was interviewed before Jun 2021. There were 4 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all Resume tips
    Round 2 - HR 

    (1 Question)

    • Q1. Basic information about condidate
    Round 3 - Technical 

    (1 Question)

    • Q1. Basic erection procedure, schedule timeline, contractual agreements, basic comercial information, major milestone
    Round 4 - HR 

    (1 Question)

    • Q1. Salary negotiations,

    Interview Preparation Tips

    Interview preparation tips for other job seekers - You have to good knowledge of planning and scheduling, also should have good hands in Microsoft Excel PowerPoint and words. In general they asked for planning tools like Primavera and ms office but actually at site they are using the same.
    So, for interview point of view you should have basic knowledge of Primavera and MSP.
    Regards

    Senior Planning Engineer Interview Questions asked at other Companies

    Q1. What is MIS? and how it prepare.
    View answer (1)

    I applied via Company Website and was interviewed in Aug 2018. There were 3 interview rounds.

    Interview Questionnaire 

    9 Questions

    • Q1. Ask about your self
    • Q2. Question about your current postion and company and expectation.
    • Q3. Than they arrenge Telephon technical round with MHPS
    • Q4. About your current job
    • Q5. MHPS is basically boiler company than u must be know all material use in your area u look after.
    • Q6. Alignment technic
    • Q7. Must be know all qulity related work . MHPS is strict on qulity
    • Q8. Ask all technical question with video conferencing or face to face .
    • Q9. Must prepared this interview taken by project director technical qustion is very high level and sound very clear u not get second chance

    Interview Preparation Tips

    General Tips: my interview is taken by project director he is ex BHEL and have good knowledge about all kind of power project
    1 ask me about material .
    2 qulity treatment with material.
    3 welding treatment.
    4 heat treatment.
    5 bolier alignment .
    6 burner alignment
    Skills: Problem Solving, Time Management
    Duration: <1 week

    Mechanical Engineer Interview Questions asked at other Companies

    Q1. What we need to do if pressure valve fail in boiler
    View answer (8)

    Interview questions from similar companies

    I applied via Approached by Company and was interviewed before Mar 2018. There was 1 interview round.

    Interview Preparation Tips

    General Tips: Interviewer is very sound in technical so he was asking about total application wise and technical questions related to electrical.
    Skills: Communication, Body Language, Decision Making Skills
    Duration: >3 Months
    Contribute & help others!
    anonymous
    You can choose to be anonymous

    L&T–MHI Power Boilers Interview FAQs

    How many rounds are there in L&T–MHI Power Boilers interview?
    L&T–MHI Power Boilers interview process usually has 2-3 rounds. The most common rounds in the L&T–MHI Power Boilers interview process are HR, Technical and Resume Shortlist.
    What are the top questions asked in L&T–MHI Power Boilers interview?

    Some of the top questions asked at the L&T–MHI Power Boilers interview -

    1. What is connection and joints in steel des...read more
    2. What are various test done on si...read more
    3. 2. How to calculate air requirement for combustion...read more

    Recently Viewed

    JOBS

    Browse jobs

    Discover jobs you love

    COMPANY BENEFITS

    KNR Constructions

    20 benefits

    COMPANY BENEFITS

    IRB Infrastructure

    60 benefits

    COMPANY BENEFITS

    Dilip Buildcon

    304 benefits

    COMPANY BENEFITS

    Dilip Buildcon

    304 benefits

    SALARIES

    Caterpillar Inc

    SALARIES

    Caterpillar Inc

    No Salaries

    SALARIES

    Caterpillar Inc

    JOBS

    Caterpillar Inc

    No Jobs

    JOBS

    Caterpillar Inc

    No Jobs

    Tell us how to improve this page.

    L&T–MHI Power Boilers Interview Process

    based on 11 interviews

    Interview experience

    4.5
      
    Good
    View more

    Interview Questions from Similar Companies

    Siemens Interview Questions
    4.1
     • 417 Interviews
    Thermax Limited Interview Questions
    4.1
     • 250 Interviews
    BHEL Interview Questions
    4.1
     • 113 Interviews
    GE Vernova Interview Questions
    4.1
     • 82 Interviews
    View all

    L&T–MHI Power Boilers Reviews and Ratings

    based on 280 reviews

    4.0/5

    Rating in categories

    3.9

    Skill development

    3.9

    Work-life balance

    3.5

    Salary

    4.0

    Job security

    3.9

    Company culture

    3.2

    Promotions

    3.7

    Work satisfaction

    Explore 280 Reviews and Ratings
    Manager
    110 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Assistant Manager
    68 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Senior Engineer
    47 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Junior Engineer
    42 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Production Engineer
    42 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Explore more salaries
    Compare L&T–MHI Power Boilers with

    Thermax Limited

    4.1
    Compare

    BHEL

    4.1
    Compare

    Alstom Transportation

    3.7
    Compare

    Siemens

    4.1
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview