L&T–MHI Power Boilers Quality Engineer Interview Questions and Answers

Updated 22 Apr 2024

L&T–MHI Power Boilers Quality Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I was interviewed in Oct 2023.

Round 1 - Group Discussion 

Experiences related question answer

Round 2 - HR 

(3 Questions)

  • Q1. Qualification and experience
  • Q2. Salary discussion
  • Q3. How much pakage making good progress
  • Ans. 

    The progress of package making is good and on track.

    • The package making process is meeting its milestones and deadlines.

    • Quality checks are being conducted regularly to ensure high standards are maintained.

    • Efficiency in the packaging process has improved, leading to faster production.

    • Feedback from customers and stakeholders has been positive regarding the packaging.

    • Any issues or delays in the packaging process are being

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion done

Interview Preparation Tips

Interview preparation tips for other job seekers - What is your criteria and which type readyness have you done

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2024.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Have you prepared CAPA?
  • Ans. 

    Yes, I have prepared CAPA (Corrective and Preventive Action) reports in my previous roles.

    • Yes, I have prepared CAPA reports to address quality issues and prevent their recurrence.

    • I have experience in conducting root cause analysis to identify the underlying issues.

    • I have implemented corrective actions to address immediate concerns and preventive actions to avoid future issues.

    • I have also monitored the effectiveness of

  • Answered by AI
  • Q2. What is APQP and their application
  • Ans. 

    APQP stands for Advanced Product Quality Planning. It is a structured method for defining and establishing the steps necessary to ensure that a product satisfies the customer.

    • APQP is a quality framework used in the automotive industry to ensure that products meet customer requirements.

    • It involves a series of phases including planning, product design and development, process design and development, product and process v...

  • Answered by AI
  • Q3. 7QC Tools and their application
  • Ans. 

    7QC Tools are a set of tools used for quality control and improvement in manufacturing processes.

    • Check Sheet: Used to collect and analyze data, such as defects in a product.

    • Histogram: Shows the frequency distribution of a set of data.

    • Pareto Chart: Helps identify the most significant factors contributing to a problem.

    • Cause and Effect Diagram (Fishbone Diagram): Used to identify and analyze potential causes of a problem.

    • ...

  • Answered by AI
  • Q4. What all are the PPAP Documents?
  • Ans. 

    PPAP documents include documents like control plan, FMEA, measurement system analysis, etc.

    • Control Plan

    • FMEA (Failure Mode and Effects Analysis)

    • Measurement System Analysis

    • Part Submission Warrant

    • Process Flow Diagram

    • Appearance Approval Report

  • Answered by AI
  • Q5. Acceptance criteria for SPC&MSA
  • Ans. 

    Acceptance criteria for SPC&MSA involves setting specific requirements for statistical process control and measurement system analysis.

    • Acceptance criteria for SPC should include specifications for control limits, process stability, and capability indices.

    • Acceptance criteria for MSA should include requirements for bias, linearity, stability, repeatability, and reproducibility.

    • Examples of acceptance criteria for SPC coul...

  • Answered by AI
  • Q6. How you're declaring the severity in PFMEA
  • Ans. 

    Severity in PFMEA is declared based on the potential impact of a failure mode on the overall process or product.

    • Severity is typically rated on a scale from 1 to 10, with 1 being the least severe and 10 being the most severe.

    • Consider the consequences of a failure mode on customer safety, regulatory compliance, product functionality, and overall process performance.

    • Examples of high severity failure modes include those th...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do well
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2024.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Have you prepared CAPA?
  • Ans. 

    Yes, I have prepared CAPA (Corrective and Preventive Action) reports in my previous roles.

    • Yes, I have prepared CAPA reports to address quality issues and prevent their recurrence.

    • I have experience in conducting root cause analysis to identify the underlying issues.

    • I have implemented corrective actions to address immediate concerns and preventive actions to avoid future issues.

    • I have also monitored the effectiveness of

  • Answered by AI
  • Q2. What is APQP and their application
  • Ans. 

    APQP stands for Advanced Product Quality Planning. It is a structured method for defining and establishing the steps necessary to ensure that a product satisfies the customer.

    • APQP is a quality framework used in the automotive industry to ensure that products meet customer requirements.

    • It involves a series of phases including planning, product design and development, process design and development, product and process v...

  • Answered by AI
  • Q3. 7QC Tools and their application
  • Ans. 

    7QC Tools are a set of tools used for quality control and improvement in manufacturing processes.

    • Check Sheet: Used to collect and analyze data, such as defects in a product.

    • Histogram: Shows the frequency distribution of a set of data.

    • Pareto Chart: Helps identify the most significant factors contributing to a problem.

    • Cause and Effect Diagram (Fishbone Diagram): Used to identify and analyze potential causes of a problem.

    • ...

  • Answered by AI
  • Q4. What all are the PPAP Documents?
  • Ans. 

    PPAP documents include documents like control plan, FMEA, measurement system analysis, etc.

    • Control Plan

    • FMEA (Failure Mode and Effects Analysis)

    • Measurement System Analysis

    • Part Submission Warrant

    • Process Flow Diagram

    • Appearance Approval Report

  • Answered by AI
  • Q5. Acceptance criteria for SPC&MSA
  • Ans. 

    Acceptance criteria for SPC&MSA involves setting specific requirements for statistical process control and measurement system analysis.

    • Acceptance criteria for SPC should include specifications for control limits, process stability, and capability indices.

    • Acceptance criteria for MSA should include requirements for bias, linearity, stability, repeatability, and reproducibility.

    • Examples of acceptance criteria for SPC coul...

  • Answered by AI
  • Q6. How you're declaring the severity in PFMEA
  • Ans. 

    Severity in PFMEA is declared based on the potential impact of a failure mode on the overall process or product.

    • Severity is typically rated on a scale from 1 to 10, with 1 being the least severe and 10 being the most severe.

    • Consider the consequences of a failure mode on customer safety, regulatory compliance, product functionality, and overall process performance.

    • Examples of high severity failure modes include those th...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do well
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Basic technical knowledge
  • Q2. Basic knowledge about quality instrument

L&T–MHI Power Boilers Interview FAQs

How many rounds are there in L&T–MHI Power Boilers Quality Engineer interview?
L&T–MHI Power Boilers interview process usually has 3 rounds. The most common rounds in the L&T–MHI Power Boilers interview process are HR and Group Discussion.

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 421 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
GE Vernova Interview Questions
4.1
 • 85 Interviews
Toshiba Interview Questions
3.9
 • 28 Interviews
View all
L&T–MHI Power Boilers Quality Engineer Salary
based on 14 salaries
₹1.2 L/yr - ₹7.2 L/yr
21% more than the average Quality Engineer Salary in India
View more details

L&T–MHI Power Boilers Quality Engineer Reviews and Ratings

based on 4 reviews

3.8/5

Rating in categories

3.8

Skill development

3.3

Work-Life balance

3.0

Salary & Benefits

2.5

Job Security

1.6

Company culture

1.2

Promotions/Appraisal

2.6

Work Satisfaction

Explore 4 Reviews and Ratings
Manager
113 salaries
unlock blur

₹12 L/yr - ₹27 L/yr

Assistant Manager
68 salaries
unlock blur

₹10.2 L/yr - ₹17 L/yr

Senior Engineer
49 salaries
unlock blur

₹6 L/yr - ₹11.5 L/yr

Production Engineer
43 salaries
unlock blur

₹3 L/yr - ₹10.8 L/yr

Junior Engineer
42 salaries
unlock blur

₹3.8 L/yr - ₹7.8 L/yr

Explore more salaries
Compare L&T–MHI Power Boilers with

Thermax Limited

4.2
Compare

BHEL

4.2
Compare

Alstom Transportation

3.7
Compare

Siemens

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview