Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Lal Baba Seamless Tubes Team. If you also belong to the team, you can get access from here

Lal Baba Seamless Tubes Verified Tick

Compare button icon Compare button icon Compare
3.2

based on 138 Reviews

Filter interviews by

Lal Baba Seamless Tubes Quality Assurance Quality Control Engineer Interview Questions and Answers

Updated 25 Aug 2023

Lal Baba Seamless Tubes Quality Assurance Quality Control Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Basic technical knowledge
  • Q2. Basic knowledge about quality instrument

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2024.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Have you prepared CAPA?
  • Ans. 

    Yes, I have prepared CAPA (Corrective and Preventive Action) reports in my previous roles.

    • Yes, I have prepared CAPA reports to address quality issues and prevent their recurrence.

    • I have experience in conducting root cause analysis to identify the underlying issues.

    • I have implemented corrective actions to address immediate concerns and preventive actions to avoid future issues.

    • I have also monitored the effectiveness of

  • Answered by AI
  • Q2. What is APQP and their application
  • Ans. 

    APQP stands for Advanced Product Quality Planning. It is a structured method for defining and establishing the steps necessary to ensure that a product satisfies the customer.

    • APQP is a quality framework used in the automotive industry to ensure that products meet customer requirements.

    • It involves a series of phases including planning, product design and development, process design and development, product and process v...

  • Answered by AI
  • Q3. 7QC Tools and their application
  • Ans. 

    7QC Tools are a set of tools used for quality control and improvement in manufacturing processes.

    • Check Sheet: Used to collect and analyze data, such as defects in a product.

    • Histogram: Shows the frequency distribution of a set of data.

    • Pareto Chart: Helps identify the most significant factors contributing to a problem.

    • Cause and Effect Diagram (Fishbone Diagram): Used to identify and analyze potential causes of a problem.

    • ...

  • Answered by AI
  • Q4. What all are the PPAP Documents?
  • Ans. 

    PPAP documents include documents like control plan, FMEA, measurement system analysis, etc.

    • Control Plan

    • FMEA (Failure Mode and Effects Analysis)

    • Measurement System Analysis

    • Part Submission Warrant

    • Process Flow Diagram

    • Appearance Approval Report

  • Answered by AI
  • Q5. Acceptance criteria for SPC&MSA
  • Ans. 

    Acceptance criteria for SPC&MSA involves setting specific requirements for statistical process control and measurement system analysis.

    • Acceptance criteria for SPC should include specifications for control limits, process stability, and capability indices.

    • Acceptance criteria for MSA should include requirements for bias, linearity, stability, repeatability, and reproducibility.

    • Examples of acceptance criteria for SPC coul...

  • Answered by AI
  • Q6. How you're declaring the severity in PFMEA
  • Ans. 

    Severity in PFMEA is declared based on the potential impact of a failure mode on the overall process or product.

    • Severity is typically rated on a scale from 1 to 10, with 1 being the least severe and 10 being the most severe.

    • Consider the consequences of a failure mode on customer safety, regulatory compliance, product functionality, and overall process performance.

    • Examples of high severity failure modes include those th...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do well

Lal Baba Seamless Tubes Interview FAQs

How many rounds are there in Lal Baba Seamless Tubes Quality Assurance Quality Control Engineer interview?
Lal Baba Seamless Tubes interview process usually has 2 rounds. The most common rounds in the Lal Baba Seamless Tubes interview process are One-on-one Round and Resume Shortlist.
What are the top questions asked in Lal Baba Seamless Tubes Quality Assurance Quality Control Engineer interview?

Some of the top questions asked at the Lal Baba Seamless Tubes Quality Assurance Quality Control Engineer interview -

  1. basic knowledge about quality instrum...read more
  2. Basic technical knowle...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 820 Interviews
JSW Steel Interview Questions
3.9
 • 563 Interviews
Vedanta Limited Interview Questions
3.9
 • 44 Interviews
ArcelorMittal Interview Questions
4.1
 • 29 Interviews
Toshiba Interview Questions
3.9
 • 28 Interviews
Vizag Steel Interview Questions
4.1
 • 26 Interviews
View all
Engineer
45 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Junior Engineer
34 salaries
unlock blur

₹1.2 L/yr - ₹3 L/yr

Senior Engineer
31 salaries
unlock blur

₹3.6 L/yr - ₹6 L/yr

Assistant Manager
19 salaries
unlock blur

₹5.1 L/yr - ₹8 L/yr

Technologist
16 salaries
unlock blur

₹1.3 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Lal Baba Seamless Tubes with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Jindal Steel and Power

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview